Report Date: September 28, 2016
Client: City of Coppell
Project Bethel and Coppell Rd.
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Test Date: September 20, 2016
General Report No.: 65
Project No.: 215-0140
Page I of I
Results
On September 20, 2016 reinforcing steel was observed at the following locations:
1) E. Bound Bethel Rd. Sidewalk, from NE. Comer of Park Rd. to Approximately 180'E. of Park Rd.
*There were no discrepancies.
*Note: Arrived on site at 10:45 AM and one-third (1/3) of rebar at W. end was already covered with concrete. No
discrepancies observed in eastern two -third (2/3).
Technician: RG
CC: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,,cot)pelltx.gov
Ms. Halie Hernandez - City of Coppell via Email: hhernandez(a),coroelltx.Qov
Mr. George Marshall - City of Coppell, via Email: gmarshallAcoppelltx.gov
Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtise22avingxom
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of )GEE Consultants, Inc. The use of
ourname must receive our priorwritten approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently
identical or similar products.
G1 • GEOTECHNICAL ENGINEERING
ENVIRONMENTAL CONSULTING
CONSTRUCTION MATERIALS TESTING
WIAW1 "I, I
10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: September 28, 2016
Client: City of Coppell
Project Bethel and Coppell Rd.
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Test Date: September 21, 2016
General Report No.: 66
Project No.: 215-0140
Page I of I
Results
On September 21, 2016 reinforcing steel was observed at the following locations:
1) E. Bound Sidewalk Sections from Hearthstone Ln. E. to about 350'E. of Park St.
The following discrepancies were noted and called to the attention of a representative of Axis Construction.
1) Ponding water, wet subgrade and mud covered rebar at HCP ramp located at SW. comer of Park and Bethel Rd. This
was due to sprinkler run off from Benson Ln.
2) Dowel rods missing caps and not tied at 2 expansion joints.
3) Wet subgrade at about 350' feet E. of Park St. due to adjacent sprinklers running excessively at night. This section
of sidewalk was not placed on this date
The above discrepancies were corrected as noted.
Note: Discrepancy No. I required the placement of dry lime at the SW. comer of Park and Bethel Rd., however, due to
excessively moist subgrade adjacent to the HCP landing and the lime not solving the soft conditions, construction joints
were utilized on each side. The complete ramp was not concreted on this date. Photos of these conditions can be provided
on request.
Technician: RG
CC: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,con0elltx.gov
Ms. Halie Hernandez - City of Coppell via Email: hhcrnandezCa)connelltx.gov
Mr. George Marshall - City of Coppell via Email: gmarshalI(&covDelltx.gqv_
Mr. Robert Caudill -'riseo Paving via Email: rcaudill(&tiscopaving.com
GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by:
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of G Consultants, Inc- The use of
our name must receive our priorwritten approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently
identical or similar products.
G1 • GEOTECHNICAL ENGINEERING
E I • ENVIRONMENTAL CONSULTING
E I* CONSTRUCTION MATERIALS TESTING
GEE Consultants, Inc.
10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: September 28, 2016
Client: City of Coppell
Project Bethel and Coppell Rd.
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Test Date: September 22, 2016
General Report No.: 67
Project No.: 215-0140
Page I of I
Results
On September 22, 2016 reinforcing steel was observed at the following locations:
1) Sidewalk from Penfolds to about 120'W. of Penfolds and HCP Ramp at SW. Comer of Park and Bethel Rd.
There were no discrepancies.
Note: This included satisfactorily drying out the soft subgrade noted on September 21, 2016 with lime at the HCP ramp
at SE. comer of Park and Bethel Rd. as well as the sidewalk subgrade about 300'E. of Park
Technician: RG
cc: Mr. Rick Odell - City of Coppell via E-mail: Rode1l(&,col)l)elltx.l4ov
Ms. Halie Hernandez - City of Coppell via Email: hhernandezgeoi)Pelltx.jzo
Mr. George Marshall - City of Coppell via Email: marshall(dyconvelltx.go
Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a)tiseopaving.com
GEE Consultants, Inc. '1'13FIK Firm: Y-3212 xevieww DY: e- I f "-
All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of
our name must receive ourprior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative ofthe quantities of apparently
identical or similar products,