ST0301C-LR160928q— # GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 REPORT OF CONCRETE MIX OBSERVATION Report Date: September 28, 2016 Date Concrete Placed: August 31, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 122 Contractor: Axis Contracting Project No.: 215-140 Concrete Supplier and Plant: Martin Marietta/ 141 Location of Placement: Park Rd., S. Bound, Sidewalk at Benson Lane MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 8274 Time Sample Batched: 9:12 AM Cement: 6 Sack Time Sampled: 9:45 AM Fly Ash: Sample Location: Sidewalk, Park Rd., S. Bound at 7 9/7/16 Benson Ln. Coarse Aggregate: Truck / Ticket No: 0000/3523614 Intermediate Aggregate: Temperature: 9/28/16 Fine Aggregate: Ambient Range: 84 OF Admixtures: Concrete Range: 92 OF 9/28/16 Slump Range (inches): 8.0 Weather Conditions: Partly Cloudy 2 Time Started: 8:00 AM Added Water: 0 Gal Time Completed: 11:45 AM Fracture Regular Sample Air Content (%): 4.5 (Unless Noted Otherwise) 'Total Cubic Yards Placed: 7.0 Reauired Strength (Lbs./so.in-)- 3.000 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 534 7 9/7/16 82,800 2,930 BCR 535 28 9/28/16 101,140 3,580 BCR 536 8.0 28 9/28/16 102,320 3,620 BCR 537 I H Hold I I I Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: HP I Remarks and/or Distribution: - cc: Mr. Rick Odell - City of Coppell via E-mail: Rodel1C&,coI)Pelltx.go Ms. Halie Hernandez - City of Coppell via Email: hbemandez(CbcorrpeIltx.go Mr. George Marshall - City of Coppell via Email: gmarshallAcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a)tiseopaving.cOm GEE F-3212 4 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. I" i * GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 Fax (214) 352-6972 � III I 1 11, � I 111 1� 0 161, ft I Report Date: September 28, 2016 Date Concrete Placed: August 31, 2016 Standard 6"xl2" Cylinders Client- City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel. & Coppell Road Concrete Report No.: 123 Contractor: Mel Electric LP Project No.: 215-140 Concrete Supplier and Plant: LMC 956 Location of Placement: Light Pole Foundation Pier MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 1261.3000 Time Sample Batched: Cement: Time Sampled: Fly Ash: Sample Location: Coarse Aggregate: BCR 538 Inter -mediate Aggregate: Truck / Ticket No: Fine Aggregate: Temperature: Admixtures: Ambient Range: BCR 539 Concrete Range: I Slump Range (inches): 2 Weather Conditions: Added Water: 0 Gal Time Started: 4.0 Time Completed: 9/28/16 Sample Air Content 5,250 Total Cubic Yards Placed: BCR 541 Required Strength (lb-, ko in 12:30 PM 1:20 PM Light Pole Foundation at SEC of Bethel Rd. and Hearthstone Ln. (E.) 0330/76830565 93 OF 99 OF 4.0 Partly Cloudy 12:15 PM 2:45 PM 3.7 5.0 100() Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 538 7 9/7/16 110,531 3,910 BCR 539 28 9/28/16 149,000 5,270 BCR 540 4.0 28 9/28/16 148,400 5,250 BCR 541 _T H Hold I I Test Methods Utilized Fracture racture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: HP I Remarks and/or Distribution: - cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,coppelltx.gov Ms. Halie Hernandez - City of Coppell via Email: hhernandez(a-)coppelltx.gov Mr. George Marshall - City of Coppell via Email: lmIarshaI1C&coVVelltx.gov Mr. Robert Caudill - Tisect Paving via Email: rcaudill(& ,tiseopaving.com Inc. TBPE Firm: F-32 Reviewed 14 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of AE Consultants, Inc, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc, 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 Fax (214) 352-6972 Report Date: September 28, 2016 Date Concrete Placed: September 20, 2016 Standard 6"xl2" Cylinders Client: City of Coppell. Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 127 Contractor: Axis Contracting Project No.: 215-140 Concrete Supplier and Plant: Martin Marietta 141 Location of Placement: Bethel Rd. Sidewalk, E. Bound MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number 8272 Cement: 5 Sack Fly Ash: Compressive Strength (Lbs./Sq.1n.) Coarse Aggregate: 1" CS Intermediate Aggregate: 7 Fine Aggregate: 79,820 Admixtures: I Admix/Aea 2 10/18/16 Added Water: 0 Gal Time Sample Batched: Time Sampled: Sample Location: Truck / Ticket No: Temperature: Ambient Range: Concrete Range: Slump Range (inches): Weather Conditions: Time Started: 'rime Completed: Sample Air Content Total Cubic Yards Placed: Renuired Strenoth (I.h, I.qn in I- 11:39 AM 12:15 PM E. Bound Sidewalk, 120'E. of Park Rd. 0000/3561998 90 OF 96 OF 7.25 Partly Cloudy 9:45 AM 1:30 PM 5.2 20.0 10110 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 555 7 9/27/16 79,820 2,820 BCR 556 28 10/18/16 BCR 557 7.25 28 10/18/16 BCR 558 I H Hold I I I Test Methods Utilized Fracture Regular ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Cylinders Made By: RG Remarks and/or Distribution: - cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(o)coppelltx.g_ov Ms. Halic Hernandez - City of Coppell via Email: hhernandez(&,coppelltx.go Mr. George Marshall - City of Coppell via Email: gmarshall(&coppelltx.go Mr. Robert Caudill - Tisco Paving via Email: rcaudill(&tis"aving.com TBPE Firm: F-3212 Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of 4 Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 # GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive • Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: September 28, 2016 Date Concrete Placed: September 21, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 128 Contractor: Axis Contracting Project No.: 215-140 Concrete Supplier and Plant: Martin Marietta 141 Location of Placement: Sidewalk, E. Bound, Bethel Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 8272 'rime Sample Batched: 9:12 AM Cement: 5.5 Sack 'rime Sampled: 10:00 AM Fly Ash: 7 Sample Location: At W. Property Line of 305 2,850 Includes 1.25 Hrs. Sand By BCR 560 Bethel Rd. Coarse Aggregate: V CS Truck / Ticket No: 0000/3563944 Intermediate Aggregate: BCR 561 Temperature: 28 Fine Aggregate: Ambient Range: 87 OF BCR 562 I Concrete Range: 93 OF Admixtures: Slump Range (inches): 6.5 Fracture Regular Admix/Aea Weather Conditions: Partly Cloudy 2 Time Started: 6:30 AM Time Completed: 12:00 PM Added Water: 5 Gal Sample Air Content (%): 4.5 Total Cubic Yards Placed: Mo Reauired Streneth (Lbs./so.in.): 3.600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 559 7 9/28/16 80,460 2,850 Includes 1.25 Hrs. Sand By BCR 560 28 10/19/16 Waiting on Concrete Delivery BCR 561 6.5 28 10/19/16 BCR 562 I H Hold I I I Test Methods Utilized Fracture Regular Cylinders Made By: RGI ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: - cc: Mr. Rick Odell - City of Coppell via E-mail: Ro&116(�,copyelltx.gov Ms. Halic Hernandez - City of Coppell via Email: hhemandez(&coppelltx.gov Mr. George Marshall - City of Coppell via Email: glrtarshall(a,coppelitx.gov Mr. Robert Caudill - Tisco Paving via Email: rcaudilIC&tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3211 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEEkonsultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.