Loading...
Copperstone-AG 951114 AGENDA REQUEST FORM CITY COUNCIL MEETING: November 14, 1995 ITEM # ITEM CAPTION: Discussion and consideration of approving a reimbursement to Briscoe-Clark Company in the amount of $40,177.50 for the installation of an oversized water main associated with Copperstone Estates. APP OVED C,i i'Y COtJN~IL - SUBMITTED Y '-~-en~'~;~'M Griffin,' ' pl~' TITLE: ........ ~g~Bt~nt' city Manager/City Engineer INITIALS STAFF COMMENTS: See attached memo. STAFF RECOMMENDATION Approval ~ Denial EXPLANATION: Staff will be av~lable to discuss this at the Council meeting. BUDGET AMT. $ AMT. EST. $ +/- BUD: $ FINANCIAL COMMENTS: FINANCIAL REVIEW~ CITY MANAGER REVIEW: Agenda Request Form - Revised 1/94 Document Name eng.03 MEMORANDUM To: Mayor and City Council From: Kenneth M. Griffin, P.E., Asst. City Manager/City Engineer ~1 RE: Discussion and consideration of approving a reimbursement to Briscoe-Clark Company in the amount of $40,177.50 for the installation of an oversized water main associated with Copperstone Estates. Date: November 6, 1995 The plat for the development of Copperstone Estates has recently been approved by City Council. As part of the development of that subdivision, the developer is required to construct a portion of the City's Master Water Plan from the high school access road westward to the existing portion of Parkway Blvd. by the Villages of Cottonwood Creek. Our Subdivision Ordinance (copy attached) states that any construction of an on-site water main in excess of 12 inches will have the differential cost reimbursed by the City. Our Master Plan requires that this line be a 16 inch water line and therefore the City is requiring that the developer construct a 16 inch water line. In accordance with our Subdivision Ordinance the developer requests a reimbursement in the amount of $40,177.50. The developer is willing to take this reimbursement as a credit against his water impact fees. Staff recommends the approval of the reimbursement of $40,177.50 to Briscoe-Clark Company as an offsetting credit to the water impact fees associated with the Copperstone Development. Staff will be available to discuss this at the Council meeting. BriscoeClark Real Esthete Development C;,.npan~ November 2, 1995 Mr. Ken Griffin City Engineer The City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: Calculation of City of Coppell's portion of the oversized water line in Parkway Blvd. Dear Ken: Attached you will find bids for the construction of the main water line that is required in Parkway Boulevard. I have included bids for the installation of both 12 inch and 16 inch PVC lines so that we can easily calculate the amount associated with the oversize. With the change fi.om ductile iron to PVC we were able to substantially reduce the City's contribution. As per our understanding of our October 31, 1995 meeting, we are anticipating this item being on the November 14, 1995 City Council agenda. We are also looking forward to the receipt of a letter fi'om your office detailing the fees associated with the development of Copperstone. Please contact me if you have any questions or need additional information. Sincerely, James P. Bfiscoe Partner ].F~ CLACK, INC. TO: 8'R[SCOE '- CLARK lT. 1, BOX [I?A 8300 DOUGLAS AVE. iADO0 MILLS, TEXAS 75[35 SUITE BOO 903)527-4445 (903)527-367~ OALL~5. T'EXRS 75225 SUBJECT':' A 130 ;OT RESIDENTIAL DEVELOPMENT C~T¥ OF ~OPPELL DALLAS'. COUNTY ;TEM~ OESCRIPT[ON UNIT' ~TY UNIT AMOUNT MEAS PRZCE ~6" PVC LF 2~8510C~ ~.$0 73907.50 [&" GATE VALVE EA ~.OO 8~00.00 ~00.00 C.I. FITTINGS TON ~.73 ~$0.00 5017.50 CONNECT TO EXISTING WATER EA CONCRETE ENCASEMENT LF TEST WATER LINE L$ [,.00 850.00 850.00 TRENCH SAFETY LF OTflL .. 96,0Z3.50 F'.~ ].F. CLACK, INC. TO: BRISCOE , CLARK RT. i, BOX 117A 8300 DOUGLAS AVE. CADOO MZLL$, TEXAS 75~35 SUITE 800 . (903)527-4445 (903)527-3679 OALLA$~. TEXAS 75225 SUB3ECT: COPPER STONE ]ATE= fl 130 LOT.RESIDENTIAL OEVELOPMENT CITY OF ~OPPELL DALLRS,. COUNTY ~TEM~ DESCRI'PT~ON' UNIT ~TY UNiT A.~:UNT MEA$ PRICE "' JATER: ' ' .'. ~2' PVC LF ~485.00 17.50 43487~50 [2" GATE VALVE EA [.3~ 800.00 800.00 C.~. F~TT[NG$ TON [..76 2250.00 30.60..00 CONNECT TO EXZST[NG WATER EA .'~.,0¢~ 900.00 [800.00 CONCRETE ENCASEMENT LF ~40.~0' 40.00 TEST WATER LINE L$ [.~.00 8S0.00 850.00 TRENCH SAFETY LF ~485~0~ 0.~0 OTAL $S,'84&.00 SUBDIVISION REGULATIONS - CITY OF COPPELL, TEXA~e APPENDIX A - WATER AND SEWER PRO RATA SECTION VH - COST OF ON-SITE MAINS SECTION VH - COST OF ON-SITE MAINS The Developer will bear the total cost of on-site mains throughout his subdivision, with sizes to be determined by the City of Coppell. The City of Coppell will refund the increment of cost of on-site water and sewer mains over twelve (12) inches in diameter. The increment of costs to be borne by the City shall be determined by breaking down the actual cost. END OF SECTION Page 47