Loading...
ST0301C-LR161003 (2)G • GEOTECHNICAL ENGINEERING E • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E o CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive Dallas, Texas 75229 0 (214) 352-5433 • Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: October 12, 2016 Test Date: October 3, 2016 Client: City of Coppell General Report No.: 68 Project Bethel and Coppell Rd. Project No.: 215-01.40 Identification Reinforcing Steel Observation Method of Test Visual Observation Results On October 3, 2016 reinforcing steel was observed at the following locations: 1) Retaining Wall in front of 305 There were no discrepancies. Technician: HP cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(&,coyt)elltx.go Ms. Halle Hernandez - City of Coppell via Email: hhernandez(q),coppelltx.gov Mr. George Marshall - City of Coppell via Email: zmarshaII(&CQWelltX.9QY Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(&,tiseot)aving.com All letters and reports are for the exclu our name must receive our prior written identical or similar products, Page I of I TBPE Firm: F-3212 Reviewed by: use of the client to whom they are addressed and shall not be reproduced without the full approval of OEE Consultants, Inc. The use of -oval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently