Loading...
Forest Cove 2-LR 980622ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE 6/22/98 C/O ROBERT POPE & ASSOC. PLANO, TEXAS PROJECT FOREST COVE ESTATES OUR REPORT NO. 98018-77A PHASE 1 & 2 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. i SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,~1 NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 521 6/22J98 FG I 17.2 107.4 17.8 106 98 1-A 522 6/22/98 FG I 17.2 107.4 17.7 107 99 1-A 523 6/22/98 FG 1 17.2 107.4 17.3 105 97 1-A 524 6/22/98 FG 1 17.2 107.4 17.3 106 99 1-A 525 6/22/98 FG 1 17.2 107.4 17.7 104 97 1-A 526 6/22/98 FG 1 17.2 107.4 17.2 103 96 1-A 527 6/22/98 FG I 17.2 107.4 18.2 106 98 1-A TEST LOCATION: 521 BLOCK "A" PAD #10 PHASE II 522 BLOCK"A" PAD #12 PHASE II 523 'BLOCK"A" PAD #13 PHASE II 524 BLOCK"A" PAD #14 PHASE II 525 BLOCK"A" PAD#15 PHASE II 526 BLOCK"A" PAD #16 PHASE II 527 BLOCK"A" PAD #18 PHASE II 1 FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D RETEST / ~'/~ Geotechnical Engineedng · Construction Materials Testing · Environmental Engi~ ~&~ ~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE 6/22/98 C/O ROBERT POPE & ASSOC. PLANO, TEXAS PROJECT FOREST COVE ESTATES OUR REPORT NO. 98018-77 PHASE 1 & 2 COPPELL, TEXAS TEST DATA: TEST '~. ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 514 6/22/98 FG-0.7 1 17.2 107.4 18.0 105 98 1-A 515 6/22/98 FG-0.5 I 17.2 107.4 17.4 106 99 1-A 516 6/22/98 FG-0.8 I 17.2 107.4 17.5 103 96 1-A 517 6/22/98 FG-0.9 1 17.2 107.4 18.1 103 96 1-A 518 6/22/98 FG-0.9 1 17.2 107.4 17.7 106 98 1-A 519 6/22/98 FG-O.6 1 17.2 107.4 17.8 106 99 1-A 520 6/22/98 FG 1 17.2 107.4 18.2 106 99 1-A TEST LOCATION: 514 BLOCK"A" PAD #33 PHASE II 515 BLOCK"A" PAD#37 PHASE II 516 BLOCK"A" PAD #38 PHASE II 517 BLOCK"A" PAD #39 PHASE II 518 BLOCK"B" PAD #1 PHASE II 519 BLOCK"B" PAD #2 PHASE II 520 BLOCK"A" PAD #8 PHASE II * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 1 FILL 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS J,.,, m, ,, A ..,r-~.-.~,,,,,-.-. ,kl~- 4 CEMENTTREATED D. RETEST Geotechnical Engineering · Construction Materials Testing · Environmental Enginee#ng~