Loading...
Forest Cove 2-LR 980618ALPHA TESTING, IRC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 DAILY FIELD REPORT TESTED FOR PROJECT PACIFIC UNITED DEV. CORP. C/O ROBERT POPE & ASSOC. PLANO, TEXAS FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS DATE OUR REPORT NO. 06/18/98 98018-76 WEATHER: CLEAR TEMPERATURE RANGE: N/A ALPHA Representative: K. C. TO: N/A THE ALPHA TECHNICIAlqTRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK A/qD PERFORM FIELD TESTING AS REQUESTED. SUBGRADE FOR BLOCK "B" PA/DS~BERED SIX THROUGH ELEVEN WAS OBSERVED TO VERIFY THAT AREAS HAD BEEN PREPARED IN ACCORDANCE WITH LOCALLY ACCEPTED STANDARDS. A TOTAL OF ELEVEN FIELD DENSITY TESTS WERE PERFORMED ON FILL AND NATURAL SUBGRADE SOILS FOR THE HOUSE PAD AREA. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS. THE SITE CONCRETE REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS ~ FIELD TEST RESULTS. AT THE COMPLETION OF SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CG01083-29