Loading...
Forest Cove 2-LR 980618 (2)ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE 6/18/98 C/O ROBERT POPE & ASSOC. PLANO, TEXAS PROJECT FOREST COVE ESTATES OUR REPORT NO. 98018-76A PHASE 1 & 2 COPPELL, TEXAS TEST DATA: TEST '~. ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 503 6/18/98 FG-0.5 I 17.2 107.4 17.3 103 96 1 -A 504 6/18/98 FG-0.7 I 17.2 107.4 17.3 106 99 1 -A 505 6/18/98 FG-I.0 1 17.2 107.4 17.9 105 98 1-A 506 6/18/98 FG-0.8 I 17.2 107.4 18.7 103 96 1-A 507 6/18~98 FG-0.9 I 17.2 107.4 17.5 105 98 1-A 508 6/18~98 FG-1.9 1 17.2 107.4 17.3 106 98 1-A 509 6/18~98 FG- 1.6 1 17.2 107.4 18.7 103 96 1 -A TEST LOCATION: 503 BLOCK"A" PAD #35 PHASE II 504 BLOCK "A" PAD ~Y36 PHASE II 505 BLOCK"A" PAD ~37 PHASE II 506 BLOCK "A" PAD #38 PHASE II 507 BLOCK"A" PAD #39 PHASE II 508 BLOCK"B" PAD #1 PHASE II 509 BLOCK"B" PAD #2 PHASE II ~A.IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 1 FILL 3 LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Geotechnical Engineering · ConslTucfion Moteriots Testing · Envfronmentol Engineeri~~ ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE 6/18/98 C/O ROBERT POPE & ASSOC. PIANO, TEXAS PROJECT FOREST COVE ESTATES OUR REPORT NO. 98018-76B PHASE I & 2 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPT~,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 510 6/18~98 FG-1.2 I 17.2 107.4 17.8 105 98 1-A 511 6/18/98 SG 1 17.2 107.4 18.2 103 96 2-A 512 6/18/98 SG I 17.2 107.4 17.6 104 97 2-A 513 6/18/98 SC, I 17.2 107.4 17.7 105 98 2-A TEST LOCATION: 510 BLOCK"B" PAD #3 PHASE II 511 BLOCK "B" PAD #7 PHASE II 512 BLOCK"B" PAD #9 PHASE II 513 BLOCK"B" PAD#11 PHASE II FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES N. OT COMPLY With SPECIFICATIONS 3 LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLYWITH SPECIFICATIONS f 4. CEMENT TREATED D RETEST ~//~. Geotechnicol Engineering · Construction Materials Testing · Environmental Engineering · Consutllr~g .