Forest Cove 2-LR 980526 (2)ALPHA TESTING, li~.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT uF CONCRETE
COMPRESSION TEST
PACIFIC UNITED DEVELOPMENT CORP.
TESTED FOR: PLANO, TEXAS DATE OF ISSUE:
MAY 26, 1998
PROJECT:
FOREST COVE ESTATES
PHASE I & 2
COPPELL, TEXAS i
OUR REPORT NO.:
98018-64
LOCATION OF CONCRETE PLACEMENT
FIELD DATA
PAVMENT: 30' WEST OF
FOREST RIDGE DRIVE
STATION 12+00
DATE PLACED
TIME
SLUMP (ASTM C-143)
AIR CONTENT (ASTM C-231 [~'OR C-173 [] )
AIR TEMPERATURE
CONCRETE TEMPERATURE
DATE RECEIVED
FIELD DATA SUBMITTED BY
MIX DATA SUBMITTED BY
05/26/98 PLANT
08: 55 DELIVER TICKET NO
2 M~X PROPORTIONS (SSD)
4.5 CEMENT
75 WATER,
7 8 FINE AGGREGATE
0 5 / 2 7 / 9 8 COARSE AGGREGATE
JOHNNY ROBERSON ADMIXTURE
SITE
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617~R C-1231 []
ON SITE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12")
(ASTM C-39)
~B TYPE DATE AGE TOTAL AREA COMPRESSIVE
NO. CURING TESTEDDAYS LOAD STRENGTH, PSI
73 LAB 06/02/98 7 81,225 28.27 2,870
74 LAB 06/23/98 28 28.27
75 ~ 06/23/98 28 28.27
76 LAB HOLD H 28.27
Specifications 9 R ~ ~ ~ ~
COMPUDATA-CG01083-34
REMARKS
[~ereplinders made by ALPHA
resentative.
[] Cylinders made by Amhitect's
or Contractor's representative,
[~lCa~linders picked up by ALPHA
oratory,
[] Cylinders delivered to ALPHA
laboratory.
[] Compressions test results comply with
applicable specifications.
[] Compression test results do not comply
with applicable specifications.
e~ctfully Submitted
TESTING, INC.
PAT STETTNER
ALPHA TESTING, i~.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT CONCRETE
COMPRESSION TEST
TESTED FOR:
PACIFIC UNITED
PLANO, TEXAS
PROJECT: FOREST COVE ES:
PHASE 1 & 2
COPPELL, TEXAS
DEVELOPMENT
CORPDATE OF ISSUE: MAY 26, 1998
?ATES OUR REPORT NO.: 98018--64
LOCATION OF CONCRETE PLACEMENT
DATE PLACED
TIME
SLUMP (ASTM C-143) ~/'C
AIR CONTENT (ASTM C-231 -173 [] )
AIR TEMPERATURE
CONCRETE TEMPERATURE
DATE RECEIVED
FIELD DATA SUBMITI'ED BY
MiX DATA SUBMI'CrED BY SITE /
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617~;~OR C-1231 []
FIEL[ DATA
,~AVMENT: 30' WE,~T OF STATION 12+00
~OREST RIDGE DR]iVE
05/26/98 PLANT ON SITE
08 = 5 5 DELIVER TICKET NO N/A
2 MiX PROPORTIONS (SSD) N/A
4.5 CEMENT N/A
7 5 WATER' N/A
7 8 FINE AGGREGATE N/A
05/27/98 ' COARSE AGGREGATE N/A
JOHNNY ROBERSON ADMIXTURE N/A
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12")
(ASTM C-39)
~B TYPE DATE A'E~GI TOTAL AREA COMPRESSIVE
NO. CURING TESTED DAYS LOAD STRENGTH. PSI
73 LAB 06/02/98 7 81,225 28.27 2,870
74 LAB 06/23/98 28 107,198 28.27 3,790
75 LAB 06/23/98 28 115,103 28.27 4,070
76 LAB HOLD H 28.27
Specifications 2 8 3,0 0 0
COMPUDATA-CG01083-34
irsREMARKS
made by ALPHA
representative.
[] Cylinders made by Architect's
or Contractor's representative.
.J~"~ylinylinders picked up by ALPHA
laboratory.
[] Cylinders delivered to ALPHA
~ Compressions test results comply with
applicable specifications.
'~ Compression test results do not comply
with applicable specifications.
Respectfully Submitted
ALPHA TESTING, INC.
ALPHA TESTING,
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT F CONCRETE
COMPRESSION TEST
PACIFIC UNITED DEVELOPMENT CORP.
TESTED FOR: PLANO, TEXAS DATE OF ISSUE:
M~Y 26, 1998
PROJECT:
FOREST COVE ESTATES
PHASE i & 2
COPPELL, TEXAS
OUR REPORT NO.:
98018-64
LOCATION OF CONCRETE PLACEMENT
RELD DATA
PAVMENT: 30' WEST OF
FOREST RIDGE DRIVE
STATION 12+00
DATE PLACED
TIME
SLUMP (ASTM C-143)
AIR CONTENT (ASTM C-231 [~'OR C-173 [] )
AIR TEMPERATURE
CONCRETE TEMPERATURE
DATE RECEIVED
FIELD DATA SUBMI'I-I'ED BY
MIX DATA SUBMI'UI'ED BY
05/2 6/98 PLANT
08: 55 DEMVER TICKET NO
2 M~X PROPORTIONS (SSD)
4.5 CEMENT
7 5 WATER
7 8 FINE AGGREGATE
0 5 / 2 7 / 9 8 COARSE AGGREGATE
JOHNNY ROBERSON ADMIXTURE
SITE
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 ~I~R C-1231 []
ON SITE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
COMPRESSION TEST RESULTS
(NOMINAL CYUNDER SIZE 6" X 12")
(ASTM C-39)
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE
NO. CURING TESTED DAYS LOAD STRENGTH, PSI
73 LAB 06/02/98 7 81,225 28.27 2,870
74 LAB 06/23/98 28 28.27
75 LAB 06/23/98 28 28.27
76 LAB HOLD H 28 . 27
Specifications ~ 8 ~ ~ ~ ~
REMARKS
~re~inders made by ALPHA
resentative.
[] Cylinders made by Architect's
or Contractor's representative.
a lindem picked up by ALPHA
oratory.
[] Cylinders delivered to ALPHA
laboratory.
[] Compressions test results comply with
applicable specifications.
[] Compression test results do not comply
with applicable specifications.
[ully Submitted
ESTING, INC.
PAT STETTNER
COMPUDATA-CG01083-34