Loading...
Forest Cove 2-LR 980513ALPHA TESTING, ~'~'C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR PACIFIC LTNITED DEV. CORP. C/O ROBERT POPE & ASSOC. PLANO, TEXAS DATE OF ISSUE 05/13/98 PROJECT FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS OUR REPORT NO. 98018-59 WEATHER: CLEAR TEMPERATURE RANGE: 7 0 ALPHA Representative: TO: 8 0 THE ALPHA TECHNICIANTRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIA/q OBTAINED TWO SOIL SAMPLES FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLES WERE OBTAINED FROM THE FOLLOWING LOCATIONS: FOREST RIDGE COVE, STATION 13+00. HICKORY RIDGE COVE, STATION 2+50. IN A/DDITION THE TECHNICIA/~ PERFORMED TEN FIELD GR3~DATION TESTS ON THE LIME STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST LOCATIONS ~ RESULTS. LABORATORY TEST RESULTSI FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPAI~ATE REPORT. AT THE COMPLETION OF SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. ALPHA TESTING, ~['C. 2209 Wisconsin St. Suite 100 Dallas, Texas 75229 (972) 620-8911 MECHANICAL STABILIZATION ! MODIFICATION FINAL MIX TESTED FOR PROJECT PACIFIC UNITED DEV. CORP. C/0 ROBERT POPE & ASSOC. PLANO, TEXAS~ FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS DATE 05/13/98 OUR REPORT NO. 98018-59A Area of Work: LOCATIONS AS LISTED BELOW Date cement [] lime [] initially applied 0 5/12/9 8 Average final compacted depth: Date of final mixing 05/13/98 Sample Location: STA. 11+75 FOREST RIDGE COVE STA. 14+75 FOREST RIDGE COVE STA. 1+50 FOREST BREEZE COVE STA. 4+50 FOREST BREEZE COVE STA. 2+00 HICKORY RIDGE COVE STA. 3+00 CHESTNUT COVE STA. 3+50 WOODLAND COVE STA. 2+00 ALLEY A-2 ~TA_ 5+00 ALL~Y A-2 STA_ 2+50 ALLEY A-3 8 inches. % Passing % Passing 1 3/4" Sieve #4 Sieve 100 60 100 61 100 60 100 64 100 63 100 62 100 63 100 64 100 62 100 61 Remarks: Respectfully Sub~ed