DAILY FIELD REPORT
TESTED FOR
PACIFIC LTNITED DEV. CORP.
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
DATE OF ISSUE
05/13/98
PROJECT
FOREST COVE ESTATES
PHASE 1 & 2
COPPELL, TEXAS
OUR REPORT NO.
98018-59
WEATHER: CLEAR
TEMPERATURE RANGE: 7 0
ALPHA Representative:
TO: 8 0
THE ALPHA TECHNICIANTRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO
MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIA/q OBTAINED TWO SOIL SAMPLES FOR LABORATORY PROCTOR
ANALYSIS. THE SAMPLES WERE OBTAINED FROM THE FOLLOWING LOCATIONS:
FOREST RIDGE COVE, STATION 13+00.
HICKORY RIDGE COVE, STATION 2+50.
IN A/DDITION THE TECHNICIA/~ PERFORMED TEN FIELD GR3~DATION TESTS ON THE LIME
STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST LOCATIONS ~ RESULTS.
LABORATORY TEST RESULTSI FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON
A SEPAI~ATE REPORT.
AT THE COMPLETION OF SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS
OFFICE.
ALPHA TESTING, ~['C.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(972) 620-8911
MECHANICAL
STABILIZATION ! MODIFICATION
FINAL MIX
TESTED FOR
PROJECT
PACIFIC UNITED DEV. CORP.
C/0 ROBERT POPE & ASSOC.
PLANO, TEXAS~
FOREST COVE ESTATES
PHASE 1 & 2
COPPELL, TEXAS
DATE 05/13/98
OUR REPORT NO.
98018-59A
Area of Work:
LOCATIONS AS LISTED BELOW
Date cement [] lime [] initially applied 0 5/12/9 8 Average final compacted depth:
Date of final mixing 05/13/98
Sample Location:
STA. 11+75 FOREST RIDGE COVE
STA. 14+75 FOREST RIDGE COVE
STA. 1+50 FOREST BREEZE COVE
STA. 4+50 FOREST BREEZE COVE
STA. 2+00 HICKORY RIDGE COVE
STA. 3+00 CHESTNUT COVE
STA. 3+50 WOODLAND COVE
STA. 2+00 ALLEY A-2
~TA_ 5+00 ALL~Y A-2
STA_ 2+50 ALLEY A-3
8 inches.
% Passing % Passing
1 3/4" Sieve #4 Sieve
100 60
100 61
100 60
100 64
100 63
100 62
100 63
100 64
100 62
100 61
Remarks:
Respectfully Sub~ed