Forest Cove 2-LR 980423 (4)ALPHA TESTING,
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT OF CONCRETE
COMPRESSION TEST
TESTED FOR: PACIFIC UNITED DEVELOPNENT CORPDATE OF ISSUE:
PLANO, TEXAS
APRIL 23, 1998
PROJECT:
FOREST COVE ESTATES
PHASE I & 2
COPPELL, TEXAS
OUR REPORT NO.:
98018-44
FIELD DATA
LOCATIONOFCONCRETEPLACEME~ FOREST BEND; STATION 5+00
DATE PLACED
TIME
SLUMP (ASTM C-143)
AIR CONTENT (ASTM C-231 [] OR C-173 ~
AIR TEMPERATURE
CONCRETE TEMPERATURE
DATE RECEIVED
FIELD DATA SUBMI'I-rED BY
04/23/98 PLANT
12: 4 5 DELIVER TICKET NO
1 · 7 5 MiX PROPORTIONS (SSD)
5.0 CEMENT
7 7 WATER
8 3 FINE AGGREGATE
0 4 / 2 4 / 9 8 COARSE AGGREGATE
G.E. ADMIXTURE
MIX DATA SUBMI'I-rED BY SITE/
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 ~ C-1231 []
ON SITE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12")
(ASTM C-39)
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE
NO. CURING TESTED DAYS LOAD STRENGTH, PSI
9 LAS 04/30/98 8 91,558 28.27 3,210
10 LAB 05/21/98 28 97,743 28.27 3,460
11 LAB 05/21/98 28 99,541 28.27 3,520
12 LAB HOLD H 28.27
Specifications 2 8 3,0 0 0
COMPUDATA-CG01083-34
REMARKS
,,[~nders made by ALPHA
representative.
~ Cylinders made by Architect's
or Contractor's representative.
,~Ca~llnders picked uP bY ALPHA
oratory.
[] Cylinders delivered to ALPHA
laboratory.
~'~"(~mpressions test results comply with
applicable specifications.
[] Compression test results do not comply
with applicable specifications.
ALPHA TESTING, INC.
2209 Wisconsin St.
Suite 100
Dallas, Texas 75229
(214) 620-8911
REPORT OF CONCRETE
COMPRESSION TEST
TESTED FOR:
PACIFIC UNITED DEVELOPMENT CORP.
PLANO, TEXAS DATE OF ISSUE:
APRIL 23, 1998
PROJECT:
FOREST COVE ESTATES
PHASE i & 2
COPPELL, TEXAS
OUR REPORT NO.:
98018-44
FIELD DATA
FOREST BEND; STATION 5+00
LOCATION OF CONCRETE PLACEMENT
DATE PLACED
TIME
SLUMP (ASTM C-143) /
AIR CONTENT (ASTM C-231 [] OR C-173
AIR TEMPERATURE
CONCRETE TEMPERATURE
DATE RECEIVED
FIELD DATA SUBMITTED BY
04/23/98
12: 45 PLANT
I. 7 5 DELIVER TICKET NO
5.0 MIX PROPORTIONS (SSD)
77 CEMENT
WATER
8 3 FINE AGGREGATE
0 4 / 2 4 / 9 8 COARSE AGGREGATE
G.E. ADMIXTURE
SITE
MIX DATA SUBMITTED BY /
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617[~'OR C-1231 []
ON SITE
N/A
N/A
N/A
N/A
N/A
N/A
N/A
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12")
(ASTM C-39)
LAB TYPE DATE AGE TOTAL AREA COMPRESSIVE
NO. CURING TESTED DAYS LOAD STRENGTH, PSI
9 LAB 04/30/98 8 91,558 28.27 3,210
10 LAB 05/21/98 28 28.27
11 LAB 05/21/98 28 28.27
12 LAB HOLD H 28.27
Specifications 2 8 3, 0 0 0
REMARKS
~Cylinders made by ALPHA
representative.
[] Cylinders made by Architect's
or Contractor's representative.
~Cylinders picked up by ALPHA
laboratory.
[] Cylinders delivered to ALPHA
laboratory.
[] Compression test results comply with
applicable specifications.
[] Compression test results do not comply
with applicable specifications.
~A TEIly Submitted
STING, INC.
PAT STETTNER