Loading...
Forest Cove 2-LR 980414ALPHA TESTING, ...... ~C. 2209 wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DALLY FIELD REPORT TESTED FOR PROJECT PACIFIC UNITED DEV. CORP. C/O ROBERT POPE & ASSOC. PLANO, TEXAS FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS DATE OF ISSUE OUR REPORT NO. 04/14/98 98018-38 WEATHER: CL]~ TEMPERATURE RANGE: 7 5 ALPHA Representative: G. E. TO: 75 THE ALPHATECHNICIANTRAVELED TO T~EABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED A SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: - CRESTWWOD COVE, STA. 1+00 IN ADDITION THE TECHNICIAN PERFORMED THREE GRADATION TESTS ON THE LIME STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS AND LOCATIONS. LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. ALPHA TESTING,/~"~C. 2209 wisconsin St. Suite 100 Dallas, Texas 75229 (972) 620-8911 ME("IANICAL STABILIZATION ! MODIFICATION FINAL MIX TESTED FOR PROJECT PACIFIC UNITED DEV. CORP. C/0 ROBERT POPE & ASSOC. PLANO, TEXAS FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS DATE 04/14/98 OUR REPORT NO. 98018-38A Area of Work: CRESTWOOD COVE Date cement [] lime {D/initially applied Date of final mixing 04/14/98 Sample Location: STA. 0+50 CRESTWOOD COVE STA. 3+50 CRESTWOOD COVE STA. 6+50 CRESTWOOD COVE 04/13/98 Average final compacted depth: 8 % Passing % Passing 1 3/4" Sieve #4 Sieve 100 61 100 60 100 63 inches. Remarks: ~MPl J I')ATA-[':,~O 1 Daybed P. ~Stettner----[ J