DALLY FIELD REPORT
TESTED FOR
PROJECT
PACIFIC UNITED DEV. CORP.
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
FOREST COVE ESTATES
PHASE 1 & 2
COPPELL, TEXAS
DATE OF ISSUE
OUR REPORT NO.
04/14/98
98018-38
WEATHER: CL]~
TEMPERATURE RANGE: 7 5
ALPHA Representative: G. E.
TO: 75
THE ALPHATECHNICIANTRAVELED TO T~EABOVE REFERENCED PROJECT AS REQUESTED TO
MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIAN OBTAINED A SOIL SAMPLE FOR LABORATORY PROCTOR
ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION:
- CRESTWWOD COVE, STA. 1+00
IN ADDITION THE TECHNICIAN PERFORMED THREE GRADATION TESTS ON THE LIME
STABILIZED MATERIALS. SEE ATTACHED REPORT FOR TEST RESULTS AND LOCATIONS.
LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW ON
A SEPARATE REPORT.
AT THE COMPLETION OF SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS
OFFICE.
ALPHA TESTING,/~"~C.
2209 wisconsin St.
Suite 100
Dallas, Texas 75229
(972) 620-8911
ME("IANICAL
STABILIZATION ! MODIFICATION
FINAL MIX
TESTED FOR
PROJECT
PACIFIC UNITED DEV. CORP.
C/0 ROBERT POPE & ASSOC.
PLANO, TEXAS
FOREST COVE ESTATES
PHASE 1 & 2
COPPELL, TEXAS
DATE 04/14/98
OUR REPORT NO.
98018-38A
Area of Work:
CRESTWOOD COVE
Date cement [] lime {D/initially applied
Date of final mixing 04/14/98
Sample Location:
STA. 0+50 CRESTWOOD COVE
STA. 3+50 CRESTWOOD COVE
STA. 6+50 CRESTWOOD COVE
04/13/98 Average final compacted depth: 8
% Passing % Passing
1 3/4" Sieve #4 Sieve
100 61
100 60
100 63
inches.
Remarks:
~MPl J I')ATA-[':,~O 1
Daybed P. ~Stettner----[ J