Forest Cove 2-LR 980324ALPHA TESTING,i n~C.
2209 Wisconsin St., S0ite 100
Dallas, Texas 75229
(214) 620-8911
DALLY FIELD REPORT
TESTED FOR PACIFIC UNIT~D{DEV. 'CORP. DATEOF.tSSUE 03/24/98
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
FOREST COVE ESTATES
PROJECT P[{ASE i & 2 OUR REPORT NO. 98018-30
COPPELL, 'i~EFuai~,
WEATHER:
PARTLY CLOUDY
TE~
ALF
~HE ALPHA TECHNICIAN TRA%
~ONITOR ON-GOING WORK ANE
IPERATURE RANGE: 7 0
HA Representative: K. C.
TO: 70
q~LED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO
PERFORM FIELD TESTING AS REQUESTED.
~UBGRADE FOR PHASE 2 BLOCK "A" LOTS 11, 12, 13, 14, 15, 18', 23, 22, 21, 25, 34,
[ND 35 WAS OBSERVED TO vERIFY THAT AREAS HAD BEEN PREPARED IN GENERAL ACCORDANCE
~ITH LOCALLY ACCEPTED STANDARDS.
* BLOCK "A" LOT 18 FORMER STOCK POND AREA HAS BEEN DRAINED AND MUCKED OUT.
~ TOTAL OF 20 FIELD DENSITY TESTS WERE PERFORMED ON FILL AND NATURAL SUBGRADE
~0ILS FOR HOUSE PADS AND ALLEY A-2. SEE ATTACHED REPORT OF FIELD COMPACTION
~ESTS.
~HE SITE CONCRETE REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST
~ESULTS. ;
IT THE COMPLETION OF SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS
~FFICE. :
ALPHA TESTIN(~* ,NC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
REPORT OF FIELD
COMPACTION TESTS
(972) 620-8911
TESTED FOR
PACIFIC UNITED
C/O ROBERT POPE
PLA.NO, TEXAS
DEV. CORP.
& ASSOC.
DATE
ATES
FOREST COVE ES~
PROJECT PHASE i & 2 OURREPORTNO.
COPPELL, TEXAS
03/24/98
98018-30A
TEST DATA:
TEST DA~ ~. ~L ID ~ISltJREOPTIMUM MAXIMUM~y ~LAB MOISTUREIN PLACE DRyIN ~NSITyPLACE COMPACTI~PERCE~ COMMENT*
NO. NUMBER % ~ % ~:~
i
290 03/24 FG-5.3 i 4 18.2 104.7 18.4 102 98 1-A
1
291 03/24 FG-4.2 i 4 18.2 104.7 19.1 102 97 1-A
i
292 03/24 SG ! 1 17.2 107.4 17.4 105 98 2-A
293 03/24 SG i 17.2 107.4 18.4 103 96 2-A
294 03/24 SG 1 17.2 107.4 18.0 105 97 2-A
295 03/24 FG-8.0 ! 4 18.2 104.7 19.2 102 97 1-A
i
296 03/24 SG i 1 17.2 107.4 19.1 103 96 2-A
TEST LOCATION: PHASE 2 :
290 BLOCK "A" PAD #14
291 BLOCK "A" PAD #14~
292 BLOCK "A" PAD #15
293 BLOCK "A" PAD #23i
294 BLOCK "A" PAD #131
295 BLOCK "A" PAD #13!
296 BLOCK "A" PAD #25
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
* A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIF . B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
ALPHA TESTIN([,~NC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR
PROJECT
PACIFIC UNITED DEV. CORP.
C/O ROBERT POPE & ASSOC.
PLAN0, TEXAS
FOREST COVE ESTATES
PHASE I a 2
COPPELL, TEXAS
DATE
03/24/98
OUR REPORT NO.
98018-30B
TEST DATA:
DA~
03/24
03/24
EG~2.9
[~-3.2
03/24
03/24
03/24
03/24
03/24
TEST LOCATION:
FG-2.1
SG
FG-4.5
FG-4.6
FG-3.6
PHASE 2
BLOCK "A" PAD #251
BLOCK "A" PAD #34
BLOCK "A" PAD #34i
o~m~u~ M~0aMU~ LAS ~ PL~CE ~ m.~CE ~RCra~ COMMENT*
18.2 104.7 20.2 102 98 1-A
18.2 104.7 20.0 102 97 1-A
18.2 104.7 18.9 103 98 1-A
17.2 107.4 17.6 105 98 2-A
18.5 105.6 19.4 102 97 1-A
18.5 105.6 21.0 101 96 1-A
18.5 105.6 19.4 101 96 1-A
298 I
299I
300I
301I
302 I
303 I
BLOCK "A" PAD #35
BLOCK "A" PAD #35
BLOCK "A" PAD #22
BLOCK "A" PAD #22
11 FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
* A. IN PLACE PERCE B. PERCENT COMP
C. PERCENTIN P~
D. RETEST
NT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~ _~
~.CTION DOES NOT COMPLY WITH SPECIFICATIONS / Respectfully Sub~itted~.-~
CE MO,STURE DOES NOT COMPLY W,TH SPEC,F,OATIONS / ~/
/_ ..
ALPHA TESTINCNC.
2200 Wisconsin St., Suite lOO
Dallas, Texas 75229
(972) 620-8911 I
REPORT OF FIELD
COMPACTION TESTS
TESTED FOR
PROJECT
I I I
PACIFIC UNITED
C/O ROBERT POPE
PLANO, TEXAS
FOREST COVE ESTATES
PHASE 1 & 2
COPPELL, TEXAS
DEV. CORP.
& ASSOC.
III I
DAT~
03/24/98
OUR REPORT NO.
98018-30C
TEST DATA:
3O4
305
306
307
308
309
03/24 SG
03/24 FG-5.8
03/24 SG
03/24 FG-4.0
03/24 FG-3.0
03/24 SG
K)IL ID
UMBER
2
2
2
OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT
MOISTURE DRY DENSITY MOI~TURE DRY DENSITY COMPACTION COMMENT*
17.2 107.4 17.6 104 97 2-A
18.5 105.6 20.0 102 96 1-A
17.2 107.4 17.4 104 96 2-A
18.5 105.6 18.7 102 97 1-A
18.5 105.6 20.2 101 96 1-A
17.2 107.4 17.3 104 97 2-A
TEST LOCATION: PHASE 2
305
I BLOCK "A" PAD #21
306 I ALLEY A-2 STA. 2+60
307 I ALLEY A-2 STA. 2+55
308 I ALLEY A-2 STA. 2+50
309 I BLOCK "A" PAD #18 FORMER STOCK POND AREA
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
* A. IN PLACE PERCI:
B. PERCENT COMP,
C. PERCENTIN PL~
D. RETEST
NT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFIC~
~CTION DOES NOT COMPLY WITH SPECIFICATIONS
CE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS