Loading...
Forest Cove 2-LR 980225TESTED FOR PROJECT Dallas, Texas 75229! (972) 620-8911 I PACIFIC UNITED C/O ROBERT POPt PLANO, TEXAS DEV. CORP. & ASSOC. FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS~ REPOHT OF FIELD COMPACTION TESTS DATE 02/25/98 OUR REPORT NO. 9 8 0 1 8 - 2 3 TEST DATA:  SOILID om~u~ MAXlMUMLAB INPI.ACE INPI.AC~ I~ERCE~ COMMENT* TEST DATE NO. lUMBER 230 02/25 FG-3.0 2 18.5 105.6 19.3 104 98 1-A 231 02/25 FG-2.0 2 18.5 105.6 21.1 100 95 1-A 232 02/25 FG-1.0 2 18.5 105.6 18.6 104 98 1-A 233 02/25 FG-4.0 2 18.5 105.6 20.8 101 96 1-A 234 02/25 FG-3.0 ! 2 18.5 105.6 20.6 103 97 1-A 235 02/25 FG-2 0 .I 2 18.5 105.6 19.2 103 97 1-A I I 236 02/25 FG-1.0 2 18.5 105.6 19.0 104 99 1-A TEST LOCATION: 230 SANITARY SEWER LINE i "A" STA. 5+50 231 SANITARY SEWER LINE "A" STA. 5+45 232 SANITJ~x~.Y SEWER LINE "A" STA. 5+40 I "A" STA. 8+20 233 SANITARY SEWER LII~i 234 SANITARY SEWER LINE i "A" STA. 8+15 I 235 SANITJ~-Y SEWER LINE "A" STA. 8+10 236 SANITARY SEWER LINE "A" STA. 8+05 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~ 2. NATURAL SUBGRADE B. PERCENT COMI ~ACTION DOES NOT COMPLY WITH SPECIFICATIONS .J~e~pectfully Su~l~itted 4. CEMENT TREATED D. RETEST LPH CG01083-18 Da'v'9.d._R,~,,,,,-S C/e 15 15'ri. er TESTED FOR ALPHA TESTIN~NC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 PACIFIC [/NITED C/O ROBERT POP~ PLANO, TEXAS REPOrlT OF FIELD COMPACTION TESTS DEV. CORP. DATE 02/25/98 & ASSOC. FOREST COVE ESTATES 98018-23A PROJECT P[.T. ASE 1 & 2 OURREPORTNO. COPPELL, TEXAS' TEST DATA: TEST DATE ~. ~OIL ID MOISTuREOPTIMUM MAYJMUMDRY DEN~ITyLAB MOISTUREIN PLACE DRyIN DENSITyPLACECOMPACTIoNPERCENT COMMENT* NO. ~lUMBER % ~F % PC, F 237 02/25 FG-3.0 ' 2 18.5 105.6 22.0 101 95 1-A 238 02/25 FG-2 . 0 2 18.5 105.6 19.6 105 99 1-A 239 02/25 FG-1.0 2 18.5 105.6 20.9 102 96 1-A 240 02/25 FG-2 . 0 3 13 . 6 113 . 6 13 . 9 111 98 1-A 241 02/25 FG-1.0 i 3 13.6 113.6 15.2 109 96 1-A 242 02/25 FG-2 . 0 3 13 . 6 113 . 6 14.9 109 96 1-A 243 02/25 FG-1.0 I 3 13.6 113.6 15.0 108 95 1-A TEST LOCATION: 237 SANITARY SEWER LINE i "A" STA. 10+20 238 SANITARY SEWER LINE! "A" STA. 10+15 239 SANITARY SEWER LINE i "A" STA. 10+10 240 SANITARY SEWER LINE "A" SERVICE TO BLOCK "D" LOT #2 241 SANITARY SEWER LINE! "A" SERVICE TO BLOCK "D" LOT #2 242 SANITARY SEWER LINE "A" SERVICE TO BLOCK "D" LOT #4 243 SANITARY SEWER LINE "A" SERVICE TO BLOCK "D" LOT #4 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMI ~ACTION DOES NOT COMPLY WITH SPECIFICATIONS ~.,~ - ~ ~,Resoec,#tdh~mitted , 3. LIME STABILIZED C. PERCENT IN PL ~CE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS _/ /~ 4. CEMENT TREATED D. RETEST ~~rc.N C. 0G01083-18 Da