Loading...
Forest Cove 2-LR 980130ALPHA TESTING, linC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 DAILY FIELD REPORT TESTED FOR PACIFIC UNITED DEV. CORP. C/O ROBERT POPE & ASSOC. PLANO, TEXAS O~E 01/30/98 PROJECT FOREST COVE ESTATES PHASE 1 & 2 COPPELL, TEXAS OUR REPORT NO. 98018-18 WEATHER: CLEAR TEMPERATURE RANGE: 5 0 ALPHA Representative: K. C. TO: 60 THE ALPHA TECENICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. SUBGRADE FOR PADS NUMBERED 1 THROUGH 8 ON BLOCK "C" WAS OBSERVED TO VERIFY THAT AREAS HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH LOCALLY ACCEPTED STANDARDS. · A TOTAL OF 14 FIELD DENSITY TESTS WERE PERFORMED ON FILL AND NATURAL !SUBGRADE SOILS FOR HOUSE PAD AREAS. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS. THE SITE REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CG01083-29 ALPHA TESTING~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPOh r OF FIELD COMPACTION TESTS I TESTED FOR PACIFIC UNITED DEV. CORP. DATE C/O ROBERT POPE & ASSOC. PLANO, TEXAS 01/30/98 FOREST COVE ESTATES PR~ECT PHASE i & 2 OURREPO~NO. 98018-18A COPPELL, TEXAS TEST DATA: TEST DATE SOIL ID om'~ M~ma~ L~ ~N ~ ~N mACE PF.~cr~rr COMMENT* MOISTURE DRY DENSIT~ MOISTURE DRY DEN~ COMPACTION NO. NUMBER % ~F % ~F 164 01/30 FG-0.8 i 17.2 107.4 19.1 103 96 1-A 165 01/30 FG i 17.2 107.4 18.3 105 98 1-A 166 01/30 FG i 17.2 107.4 19.6 107 99 2-A 167 01/30 FG i 17.2 107.4 19.5 104 97 2-A 168 01/30 FG i 17.2 107.4 19.1 104 97 2-A 169 01/30 SG 1 17.2 107.4 20.0 105 97 2-A 170 01/30 FG 1 17.2 107.4 20.7 102 95 2-A TEST LOCATION: 164 BLOCK "A" PAD #1 165 BLOCK "A" PAD #1 166 BLOCK "A" PAD #2 167 BLOCK "A" PAD #4 168 BLOCK "A" PAD #6 169 BLOCK "C" PAD #1 170 BLOCK "C" PAD #2 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPEClFICATl~bmitted B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS o. ALPHA TESTIN ,~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPO" T OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE 01/30/98 C/O ROBERT POPE & ASSOC. PLANO, TEXAS FOREST COVE ESTATES PROJECT PHASE i & 2 OURREPORTNO. 98018-18B COPPELL, TEXAS TEST DATA: TEST D~E ~ S~IL ID OPTIMUM MAXI~M LAB IN PLACE IN PLACE ~E~ COMMENT* ~IS~RE D~ D~J%SrFY MOISTURE DRY ~ COMPACTION NO. NUMBER % PcF % Pc~ 171 01/30 SG 1 17.2 107.4 19.8 104 97 2-A 172 01/30 FG-1.0 2 18.5 105.6 20.9 102 96 1-A 173 01/30 FG-0.5 2 18.5 105.6 21.0 102 97 1-A 174 01/30 FG-1.0 2 18.5 105.6 19.8 104 98 1-A 175 01/30 FG-0.5 2 18.5 105.6 19.7 104 99 1-A 176 01/30 FG-0.5 2 18.5 105.6 22.0 101 95 1-A 177 01/30 FG-1.2 2 18.5 105.6 20.4 105 99 1-A TEST LOCATION: 171 BLOCK "C" PAD #3 172 BLOCK "C" PAD #4 173 BLOCK "C" PAD # 8 174 BLOCK "C" PAD ~9 175 BLOCK "C" PAD #13 176 BLOCK "C" PAD #14 177 BLOCK "D" PAD #13 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4, CEMENT TREATED CG0t083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFIC~tt B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~ ed C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST C ~. ALPHA T~I~,JNC.