Forest Cove 2-LR 980128ALPHA TESTIN~C.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
REPOHT OF FIELD
COMPACTION TESTS
TESTED FOR PACIFIC UNITED DEV. CORP. DATE
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
01/28/98
FOREST COVE ESTATES
PROJECT PHASE 1 & 2 OURREPORTNO. 98018-16
COPPELL, TEXAS
TEST DATA:
TEST DATE n~"~---,~. SOILID OmqM~ MAXlMUMI.A~ IN PLACE IN PI.ACE PERCE~
~I~I'U~E ~ DEN~ MOt~'~I'URE DRY ~N$~ COMMENT*
NO. NUMBER % PcF % PcF c,o~c'rt~
139 01/28 FG-3.1 2 18.5 105.6 19.8 103 98 1-A
140 01/28 FG-1.9 2 18.5 105.6 19.6 104 98 1-A
141 01/28 FG-1.8 2 18.5 105.6 20.0 102 97 1-A
142 01/28 FG-0.5 2 18.5 105.6 19.9 103 97 1-A
143 01/28 FG-1.0 2 18.5 105.6 20.7 103 97 1-A
144 01/28 FG-1.2 2 18.5 105.6 20.3 104 99 1-A
145 01/28 FG-2.1 1 17.2 107.4 17.3 104 97 1-A
TEST LOCATION:
139 BLOCK "C" PAD #9
140 BLOCK "C" PAD #10
141 BLOCK "C" PAD #11
142 BLOCK "D" PAD #1
143, BLOCK "D" PAD #2
144 BLOCK "D" PAD #3
145 BLOCK "D" PAD #5
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS .....
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
~tner
ALPHA TESTIN~C.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
REPOHT OF FIELD
COMPACTION TESTS
TESTED FOR PACIFIC UNITED DEV. CORP. DATE
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
01/28/98
FOREST COVE ESTATES
PROJECT PHASE i & 2 OURREPO~NO.
COPPELL, TEXAS
98018-16A
TEST DATA:
TEST ~~ EL~. SOIL ID O~nMUU M,~MJU U~ IN ~ I, PUCE
NO. DATE MOiSTUrE DRY DEN~'I'~ MOISTURE DRY ~ ~RCENT
NUMBER % m=F % PC~ ~ COMMENT
146 01/28 FG-2.0 i 17.2 107.4 18.6 104 97 1-A
147 01/28 FG-2.0 1 17.2 107.4 17.9 106 98 1-A
148' 01/28 FG-1.0 1 17.2 107.4 19.8 103 96 1-A
149 01/28 FG-1.0 2 18.5 105.6 19.7 103 97 1-A
150 01/28 FG-0.8 2 18.5 105.6 20.4 102 97 1-A
151 01/28 FG-1.0 2 18.5 105.6 18.9 105 99 1-A
152 01/28 FG-0.6 2 18.5 105.6 19.9 102 97 1-A
TEST LOCATION:
146 BLOCK "D" PAD #6
147 BLOCK "D" PAD #7
148 BLOCK "D" PAD #8
149 BLOCK "D" PAD #14
150 BLOCK "D" PAD #15
151 BLOCK "D" PAD #16
152 BLOCK "D" PAD #17
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS~
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS