Loading...
Forest Cove 2-LR 980128ALPHA TESTIN~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPOHT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE C/O ROBERT POPE & ASSOC. PLANO, TEXAS 01/28/98 FOREST COVE ESTATES PROJECT PHASE 1 & 2 OURREPORTNO. 98018-16 COPPELL, TEXAS TEST DATA: TEST DATE n~"~---,~. SOILID OmqM~ MAXlMUMI.A~ IN PLACE IN PI.ACE PERCE~ ~I~I'U~E ~ DEN~ MOt~'~I'URE DRY ~N$~ COMMENT* NO. NUMBER % PcF % PcF c,o~c'rt~ 139 01/28 FG-3.1 2 18.5 105.6 19.8 103 98 1-A 140 01/28 FG-1.9 2 18.5 105.6 19.6 104 98 1-A 141 01/28 FG-1.8 2 18.5 105.6 20.0 102 97 1-A 142 01/28 FG-0.5 2 18.5 105.6 19.9 103 97 1-A 143 01/28 FG-1.0 2 18.5 105.6 20.7 103 97 1-A 144 01/28 FG-1.2 2 18.5 105.6 20.3 104 99 1-A 145 01/28 FG-2.1 1 17.2 107.4 17.3 104 97 1-A TEST LOCATION: 139 BLOCK "C" PAD #9 140 BLOCK "C" PAD #10 141 BLOCK "C" PAD #11 142 BLOCK "D" PAD #1 143, BLOCK "D" PAD #2 144 BLOCK "D" PAD #3 145 BLOCK "D" PAD #5 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ..... B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ~tner ALPHA TESTIN~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPOHT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE C/O ROBERT POPE & ASSOC. PLANO, TEXAS 01/28/98 FOREST COVE ESTATES PROJECT PHASE i & 2 OURREPO~NO. COPPELL, TEXAS 98018-16A TEST DATA: TEST ~~ EL~. SOIL ID O~nMUU M,~MJU U~ IN ~ I, PUCE NO. DATE MOiSTUrE DRY DEN~'I'~ MOISTURE DRY ~ ~RCENT NUMBER % m=F % PC~ ~ COMMENT 146 01/28 FG-2.0 i 17.2 107.4 18.6 104 97 1-A 147 01/28 FG-2.0 1 17.2 107.4 17.9 106 98 1-A 148' 01/28 FG-1.0 1 17.2 107.4 19.8 103 96 1-A 149 01/28 FG-1.0 2 18.5 105.6 19.7 103 97 1-A 150 01/28 FG-0.8 2 18.5 105.6 20.4 102 97 1-A 151 01/28 FG-1.0 2 18.5 105.6 18.9 105 99 1-A 152 01/28 FG-0.6 2 18.5 105.6 19.9 102 97 1-A TEST LOCATION: 146 BLOCK "D" PAD #6 147 BLOCK "D" PAD #7 148 BLOCK "D" PAD #8 149 BLOCK "D" PAD #14 150 BLOCK "D" PAD #15 151 BLOCK "D" PAD #16 152 BLOCK "D" PAD #17 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS~ B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS