Forest Cove 2-LR 980127ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
DAILY FIELD REPORT
TESTED FOR PACIFIC UNITED DEV. CORP.
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
DATE
01/27/98
PROJECT
FOREST COVE ESTATES
PHASE 1 & 2
COPPELL, TEXAS
OUR REPORT NO.
98018-15
WEATHER: PARTLY CLOUDY
TEMPERATURE RANGE: 5 0 TO:
ALPHA Representative: K. C.
65
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED
TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
SUBGRADE FOR PADS NUMBERED 5 THROUGH 8 ON BLOCK "C", AND LOTS 4 THROUGH 8
ON BLOCK "D" WAS OBSERVED TO VERIFY THAT AREAS HAD BEEN PREPARED IN GENERAL
ACCORDANCE WITH LOCALLY ACCEPTED STANDARDS.
A TOTAL OF 14 FIELD DENSITY TESTS WERE PERFORMED ON FILL AND NATURAL
SUBGRADE SOILS FOR HOUSE PAD AREAS. SEE ATTACHED REPORT OF FIELD COMPACTION
TESTS.
THE SITE REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST
RESULTS.
AT THE COMPLETION OF SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE
DALLAS OFFICE.
CG01083-29
ALPHA TESTINE'~C.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
REPO " ' OF FIELD
COMPACTION TESTS
TESTED FOR PACIFIC UNITED DEV. CORP. DATE
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
01/27/98
FOREST COVE ESTATES
PR~ECT PHASE i & 2 OURREPORTNO. 98018-15A
COPPELL, TEXAS
TEST DATA:
TEST DATE ~ SOIL ID oPmeJ~ MAXIMUM ~ IN PLACE IN PLACE PERC~ CO~MEl~rr*
MOt81~IRE DRY DENSn'Y MOI81'URE DRY DEN~n'Y COMP~TION
NO. NUMBER % PCF % PCF
125 01/27 SG 1 17.2 107.4 19.4 103 95 2-A
126 01/27 SG 1 17.2 107.4 17.6 105 98 2-A
127 01/27 SG 1 17.2 107.4 18.8 104 97 2-A
128 01/27 SG 1 17.2 107.4 20.5 103 96 2-A
129 01/27 FG-1.8 2 18.5 105.6 18.7 102 97 1-A
130 01/27 FG-2.0 2 18.5 105.6 19.9 102 96 1-A
131 01/27 FG-1.5 2 18.5 105.6 21.9 100 95 1-A
TEST LOCATION:
125 BLOCK "C" PAD #5
126 BLOCK "C" PAD #7
127 BLOCK "D" PAD #5
128 BLOCK "D" PAD #7
129 BLOCK "D" PAD #15
130 BLOCK "D" PAD #16
131 BLOCK "D" PAD #18
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
* A. IN PLACE PERCENT MOISTURE AND PERCENT C OM PACT ION COMPLY WITH SPECIFICATION~.Re~y u~
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS S
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
ALPHA TESTIN .~C.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
REPOrlT OF FIELD
COMPACTION TESTS
TESTED FOR
PACIFIC UNITED DEV. CORP. DATE 01/27/98
C/O ROBERT POPE & ASSOC.
PLANO, TEXAS
FOREST COVE ESTATES
PR~ECT PHASE i & 2 OURREPO~NO. 98018-15B
COPPELL, TEXAS
TEST DATA:
TEST D~E ~EL~. SOIL ID MOISTuREOFt'IM~ MAXlM~DRY DENS~ MOIS'rUREIN PLACE DRyIN ~NsrrYPL~CE co~aP~wx~Pr~"aw COMMENT*
NO.DEPTH'"'~ NUMBER % POF % PCF
132 01/27 FG-1.6 1 17.2 107.4 19.1 103 95 1-A
133 01/27 FG-3.0 1 17.2 107.4 17.9 105 98 1-A
134 01/27 FG-2.0 1 17.2 107.4 18.8 104 97 1-A
135 01/27 FG-1.5 2 18.5 105.6 21.0 101 96 1-A
136 01/27 FG-1.0 2 18.5 105.6 20.3 102 97 1-A
137 01/27 FG-1.5 2 18.5 105.6 20.4 102 97 1-A
138 01/27 FG-2.5 2 18.5 105.6 21.8 102 96 1-A
TEST LOCATION:
132 BLOCK "D" PAD #4
133 BLOCK "D" PAD #6
134 BLOCK "D" PAD #8
135 BLOCK "D" PAD #1
136 BLOCK "D" PAD # 1
137 BLOCK "C" PAD #6
138 BLOCK "C" PAD #8
1. FILL
2. NATURAL SUBGRADE
3.- LIME STABILIZED
4. CEMENT TREATED
CG01083-18
A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS,-~-~- ~~ ' ~', //~
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS _.......~pectfu~ed
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
./ ~.AL P HA.,?E,~T4N G, INC.
D. RETEST Day ~. ~ / ,tner~