Loading...
Forest Cove 2-LR 980121ALPHA TESTING~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 DAILY FIELD REPORT TESTED FOR PACIFIC UNITED DEV. CORP. C/O ROBERT POPE & ASSOC. PLANO, TEXAS DATE 01/21/98 PROJECT FOREST COVE ESTATES PHASE i & 2 COPPELL, TEXAS OUR REPORT NO. 98018-10 WEATHER: PARTLY CLOUDY TEMPERATURE RANGE: 5 0 TO: 5 0 ALPHA Representative: K.C. THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. SUBGRADE FOR FORMER STOCK POND NORTH OF BLOCK "D" LOT i AND ALLEY D-1 WAS OBSERVED TO VERIFY THAT AREAS HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH LOC3LLLY ACCEPTED STANDARDS. A TOTAL OF 11 FIELD DENSITY TESTS WERE PERFORMED ON FILL SOILS FOR HOUSE PAD AND ALLEY AREAS. SEE ATTACHED REPORT OF FIELD COMPACTION TESTS. THE SITE REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF SCHEDULED TESTING, THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CG01083-29 ALPHA TESTINg. INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPL, RT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. DATE C/O ROBERT POPE & ASSOC. PLANO, TEXAS 01/21/98 FOREST COVE ESTATES PROJECT PHASE i & 2 OURREPORTNO. 98018-10A COPPELL, TEXAS TEST DATA: TESTNo. DATE ~ NUMBERSOIL ID MOISTuREOPTIMUM% MAXlMIJMDRy PcFDENSITyLAB MOISTu~IN PLACE% DRY~ PcFDEN~I'yPtACE (Z)MPACTIoNPERCENT COMMENT* 45 01/21 FG-5.0 2 18.5 105.6 19.4 102 97 1-A 46 01/21 FG-12.8 2 18.5 105.6 19.0 105 99 1-A 47 01/21 FG-I0.0 2 18.5 105.6 20.8 103 98 1-A 48 01/21 FG-11.1 2 18.5 105.6 18.6 104 99 1-A 49 01/21 FG-12.0 1 17.2 107.4 17.4 108 100 1-A 50 01/21 FG-11.0 1 17.2 107.4 18.4 105 98 1-A 51 01/21 FG-11.8 2 18.5 105.6 21.0 103 97 1-A TEST LOCATION: 45 BLOCK "D" PAD #1 46 BLOCK "D" PAD # 15 47 BLOCK "D" PAD #14 48 BLOCK "D" PAD # 16 49 ALLEY D-1 STA. 2+00 50 ALLEY D-1 STA. 2+00 51 BLOCK "D" PAD #15 1. FILL 2. NATURAL SUBGRADE 3. LiME STABILIZED 4. CEMENT TREATED CG01083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS -~-~ B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS /.. ~, ,. ~R-'gsPeCffuIIy Subm~u/./ C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ,,' ALP HA T ESTINI~-_,,.4NC. D vid~~ner ALPHA TESTI~INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR PACIFIC UNITED DEV. CORP. D~E 01/21/98 C/O ROBERT POPE & ASSOC. PLANO, TEXAS FOREST COVE ESTATES OURREPO~NO. PR~ECT PHASE i & 2 98018-10B COPPELL, TEXAS TEST DATA:  SOIL ID O~UM M~X~U~ L~ ~N PriCE ~N P~CE P~RCENT COMMENT* MOISTURE DRY DENSl3~ M(N~FURE DRY DENSITY COMPACTION TEST DATE NUMBER PCF % PCF NO. % 52 01/21 FG-9.0 2 18.5 105.6 19.4 104 99 1-A 53 01/21 FG-10 . 1 2 18.5 105 . 6 20.9 102 97 1-A , 54 01/21 FG-10.0 2 18.5 105.6 20.6 103 98 1-A 55 01/21 FG-9.0 2 18.5 105.6 20.7 102 97 1-A TEST LOCATION: 52 BLOCK "D" PAD #14 53 BLOCK "D" PAD # 16 54 ALLEY D-1 STA. 1+75 55 ALLEY D-1 STA. 2+00 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONSm,,.~~,,,,i B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST