Forest Cove 2-LR 980117ALPHA TESTING, 'INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
DAILY FIELD REPORT
TESTED FOR
PACIFIC UNITED DEV. CORP
C/O ROBERT POPE & ASSOC.
DAlE
01/17/98
PROJECT
FOREST COVE ESTATES PH 1 & 2
COPPELL, TEXAS
OUR REPORT NO.
98018-7
WEATHER: CLEAR
TEMPERATURE RANGE: 5 0
At, HA Repmsen*a~Ne: K. C.
60
THE ALPHA TECHNICIA/~ TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED
TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
SUBGRADE FOR FOREST RIDGE DRIVE AT STATION #0+00 TO 5+00 WAS OBSERVED TO
VERIFY THAT AREA HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH LOCALLY
ACCEPTED STANDARDS.
A TOTAL OF 10 FIELD DENSITY TESTS WERE PERFORMED ON FILL AND NATURAL
SUBGRADE FOR HOUSE PAD AND STREET A/~EA. SEE ATTACHED REPORT FOR RESULTS OF
FIELD COMPACTION TESTING.
SITE EXCAVATION WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE
DALLAS OFFICE.
CG01083-29
///2' l
ALPHA TESTINF'"~NC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(972) 620-8911
REP " HT OF FIELD
COMPACTION TESTS
TESTED FOR
PACIFIC UNITED DEV. CORP
C/O ROBERT POPE & ASSOC.
DATE
01/17/98
PROJECT FOREST COVE ESTATES PH 1 & 2 OUR REPORT NO. 98018-7A
COPPELL, TEXAS
TEST DATA:
TEST DA~ ~[ ID ~K)~lURE~ ~O~W oeNsm,~ ~ m. ac~ D~, OENSn'y~N ~ co~e,~cT~mm(mm' COMMENT*
~. NUMBER % ~c~ % ;cF
8 01/17 FG-4.5 1 17.2 107.4 19.3 102 95 1-A
9 01/17 FG-5.5 1 17.2 107.4 18.3 106 98 1-A
10 01/17 FG-5.5 1 17.2 107.4 17.6 106 99 1-A
11 01/17 FG-6.2 2 18.5 105.6 20.4 102 .96 1-A
12 01/17 FG-3.8 2 18.5 105.6 19.5 102 95 1-A
. 1-A
13 01/17 FG-11.5 2 18.5 105.6 18 9 102
14 01/17 FG-5.0 3 13.6 113.6 15.0 113 100 1-A
TEST LOCATION:
8 BLOCK C, PAD 15
9 BLOCK C, PAD 14
10 BLOCK C, PAD 13
11 BLOCK C, PAD 12
12 BLOCK C, PAD 11
BLOCK D, PAD 1
13
1. FILL
2, NATURAL SUSGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
BLOCK D, PAD 2 O/~ ~F/~
* A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATI
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
D. RETEST
ALPHA TESTINf"~NC.
2209 Wisconsin St., SUite 100
Dallas, Texas 75229
(972) 620-8911
REP ?IT OF FIELD
COMPACTION TESTS
PACIFIC UNITED DEV. CORP 01/17/98
YESTEDFOR C/O ROBERT POPE & ASSOC. DATE
PROJECT FOREST COVE ESTATES PH 1 & 2 OUR REPORT NO. 98018-7B
COPPELL, TEXAS
TEST DATA:
TEST DATE ~' SOIL ID
~ ~Y ~ ~s~J~ ~ m~mT~ COMMENT*
NO. NUNEIER
15 01/17 FG-2 . 3 3 13.6 113.6 13.8 111 98 1-A
16 01/17 SG 1 17.2 107.4 18.3 106 99 2-A
17 01/17 SG 1 17.2 107.4 17.3 108 100 2-A
TEST LOCATION:
BLOCK D, PAD 3
FOREST RIDGE DRIVE CUL-DE-SAC AT STATION #1+50
FOREST RIDGE DRIVE CUL-DE-SAC AT STATION #3+00
// / ~ /
1. FILL
2. NATURAL SUBGRADE
3. LIME STABILIZED
4. CEMENT TREATED
CG01083-18
A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS
B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS
C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS
D. RETEST