Loading...
Four Seasons R-CS 990527DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Four Seasons Addition. Retdat. t° allow the subdivision of a 13. 701 acre tract of land into 2 separate lots located at the southeast corner of Sandy Lake Road and Royal Lane, at the request of Halff Associates, Ina DRC DATE: May27, 1999 and,lune 3, 1999 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-3679) COM3~ENT STATUS: PREL1M1NAR Y ~~ FlSA L 1. Additional R.O.W. will be needed for future widening of Sandy Lake Road.