Fountain Park 2-CS000627 MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To.'
From:
Date:
RE:
Lanny Allison, Construction Inspector
Garreth Campbell, Construction Inspector
Larry Davis, Construction Inspector
Debi Ingram, Engineering Secretary
June 27,2000
Expiring Maintenance Bond(s)
The following Maintenance Bond(s) will expire as follows.
Fountain Park II 8/26/00 (Larry Davis)
Please re-inspect the above mentioned project(s) to see that the public improvements
for this project are in satisfactory condition.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"