Loading...
WA8801-CS 860305GINN, INC. CONSULTING ENGINEERS March 5, 1986 Mr. Donald Baukos Baukos Construction Co., Inc. 6103 Bluff Point Drive Dallas, Texas 75248 Re:Miscellaneous Water Lines Coppe11, Texas Dear Mr. Baukos: A preconstruction conference was held on March 3, 1986, for the above referenced project, at the offices of Ginn, Inc., 16135 Preston Road, Dallas, Texas. The following persons were in attendance~ Don Baukos Haukos Construction Co., Inc. Ed Powell City of Coppell Steve Goram City of Coppell Tom Griffin City of Coppell Ted Brannan GTE Ronnie Bates Ginn, Inc. Randy Fleming Ginn, Inc. Gabe Fayre Ginn, Inc. The following items were discussed: 1. The Owner is the City of Coppell. All pay requests will be paid by the Owner, after approval by Ginn, Inc. Ginn, Inc. is the Engineer on the project and will administer the construction, provide inspection as needed, approve shop drawings, pay requests, field changes, etc., and all communications will be through Ginn, Inc. The Contractor is Baukos Construction Co., Inc./Dallas, Texas, and the person to direct correspondence to is Mr. Donald Baukos. 2. Notice to proceed was given as on or before March 10, 1986. The project length is 90 calendar days~ completion date is June 1, 1986. Liquidated damages are $250.00 per calendar day. 3. All communications in the field will be between Randy Fleming (Chief Inspector, Ginn, Inc.) and Contractor's designated superintendent. All City employees, subcontractors, etc., must go through proper channels. 16135 Preston Road · Suite 106 · Dallas, Texas 75248 · Phone 214,'386-6611 4. No verbal agreements by either party will be honored. Change orders will be approved, in writing, prior to work being done. 5. Any requests for extension of time on contract must be justified. Therefore, Contractor is to keep records of any times not able to prosecute work. Requests for time extensions will be held until end of project, unless approved by change order. 6. Prior to any work being started, we need a construction schedule (or sequence of construction) and a cash flow schedule tied to the construction schedule. Also need names and telephone numbers of all parties concerned with this project. 7. Payment requests will be submitted on forms provided by Ginn, Inc., in final typed form on or before the 10th of the month, including all work completed and accepted as of the last day of the previous month. Contractor will be paid after the 4th Tuesday Council meeting or within a shorter period of time after City Engineer approval. Work completed between the 1st and 10th of the month will go on the following month's estimate. 8. It is the Contractor's responsibility to contact utilities and have them verify location of their utilities and any conflicts which may occur. Contractor shall coordinate relocations/adjustments with individual utility company, as involved, as per specifications, especially the rail- road and gas pipeline companies. The railroad has been provided with an executed agreement, by the City, and should allow permission to bore as soon as possible. 9. Guarantee on completed work will be one year from final acceptance. 10. Area for storage of materials shall be responsibility of Contractor. 11. The Engineer will not advise the Contractor as to the means or methods of work or safety requirements during the project. Contractor is expected to comply with all coSes an8 safety practices rela~e8 ~o ~hiz ~ype construction. 12. Final acceptance will be as indicated in the specifications and contract documents. 13. Concrete will be paid for when complete in place and accepted, which means 3000 psi, as specified. Concrete poured within the last seven days of the month, not attaining 3000 psi or, as a minimum, 7-day break of 2100 psi, will not be allowed on that month's estimate. 14. Provide a concrete mix design for approval prior to placing any concrete. Also, asphalt design must be submitted. 15. We have provided six (6) copies of plans/specs to the Contractor. Any additional copies required by the Contractor will be paid for by the Contractor at direct cost or reproduction. Reproducibles required for as- builts paid for by the Contractor. 16. All required testing of concrete cylinders, densities, soils, etc., will be paid for by the City of Coppell. Contractor pays for fetesting. Contractor pays for water deposit for meter, or contractor's meter may be used. Meter must be left on job at all times. 17. Contractor to secure a permit from the City. There will be no charge. 18. Caution issued to Contractor to be aware of the high pressure gas lines along the railroad right-of-way and to coordinate with railroad and pipeline companies. 19. All valves will be operated by City forces. Notify in advance (24 hours preferrable -- 4 hours minimum). 20. Items requiring shop drawings: ' concrete vaults - Bilco doors - inlets with grates - tapping sleeve -a 11 valves, including boxes - fire hydrant assemblies - air relief valves assemblies - meter boxes 21. Coordinate construction with elevated tank people regarding piping, drives and work areas. 22. City requires that no construction work will be done on Sundays and that work hours be limited from 9:00 AM to 4:30 PM on Saturdays. During weekend (Saturday) work, if an emergency occurs or City forces are needed, contact the police dispatcher. 23. A question was raised concerning the "services" on Kaye Street, whether it was included in this contract. The City is requesting the contractor to provide a proposal for making the connections to all the "metered" properties along Kaye Street, Shadydale, and Oak Trail. This is addressed in a separate letter. 24. A water meter can be provided by the City, for a $1,000.00 deposit; or the contractor may use his own provided it is checked out with the City prior to placing on the project. Meter shall remain on the job at all times. Meter will be read by City and payment made based on those readings. 25. Police Chief Griffin mentioned a few items he felt were of concerns to the City. - emergency numbers for all parties concerned should be provided. - Ginn, Inc. will coordinate with City forces. - Should "traffic" be affected by construction, City requires minimum of 2 flagmen directing traffic in a safe manner (specifications identify this and address this to the contractor. - Whenever a street will be blocked, contractor shall notify the communications dispatcher at 462-1144, so all City departments will be aware of the situation. - Only street approved equipment will be allowed on City streets. Contractor indicated that he was going to use rubber-tired equipment. - Access to all property will be open at night or end of day's work. - Blocking of street intersection is prohibited. - Kaye Street is the main problem area, regarding residents and possible complaints. Please be sympathetic to their situation. 26. The City will send letters to Kaye Street residents to advise them of impending construction. Contractor was asked to also contact them so they will be aware. 27. At Sandy Lake and Shady Dale, Steve Goram indicated that the water line was an 8" line, not 10" as shown. '28. Ed Powell indicated that the City would prefer to "deflect" the pipe, in accordance with manufacturers' recommendations, in lieu of using fittings, if at all possible. Where it is obvious fittings are needed, then they shall be used. 29. City would allow Kaye Street to be "open cut" where services will be installed, as long as "trench" was not greater than 6" wide, backfill compacted and a minimum of 4" asphalt was replaced in the trench. 30. City indicated that the steel encasement on the local residential streets could be deleted and the 8" line could be bored directly. The cost of not having to install the encasement pipe should be returned to the City. This will be addressed in a separate letter. 31. Steve Goram indicated that the City would like to have approximately 34 - 40 services provided on Kaye Street; and all the services (unknown quantity) on Shady Dale and Oak Trail should be included. Coordinate numbers and locations with City personnel. This is a request for pricing. The above items enumerated are noted and concurred with, but understood not to be a modification of any existing contracts or agreements. Please return one signed copy to us. If you have any questions, please contact us. Sincerely, ~ CONCURRENCE: HAUKOS CONSTRUCTION CO., INC. Gabe Favre /st cc: Frank Proct~ BY: Ed Powell Steve Goram TITLE: Randy Fleming Ronnie Bates DATE: Wayne Ginn