ST9902-CS140626 (2)
Halie Hernandez
From:Chetan Raval <ravalc@hotmail.com>
Sent:Thursday, June 26, 2014 2:10 PM
To:Keith Marvin
Cc:ravalsejal@gmail.com; Rick Odell
Subject:Re: Sandy Lake construction
Hi Keith,
I will see you at 3 PM.
Thanks,
Chetan
Sent from my iPhone
On Jun 26, 2014, at 1:38 PM, "Keith Marvin" <KMarvin@coppelltx.gov> wrote:
Today at 3:00 would work well for us.
Keith Marvin
City of Coppell
On Jun 26, 2014, at 1:26 PM, "Chetan Raval" <ravalc@hotmail.com> wrote:
Hi Keith,
Thank you for getting back to me quickly. Yes we did talk about adding a little
piece to one side. Would love to meet you there. I can be home today after 3 PM
or tomorrow between 1 and 3 PM. Please let me know when you can do it.
Thanks,
Chetan
From: KMarvin@coppelltx.gov
To: ravalc@hotmail.com
CC: ravalsejal@gmail.com; ROdell@coppelltx.gov
Subject: RE: Sandy Lake construction
Date: Thu, 26 Jun 2014 13:12:13 +0000
Chetan,
1
We will make every effort to match the color and texture of the driveway. Didn’t we
talk about changing your driveway configuration a little too? Do you have time to meet
out there and talk about both of these issues?
Keith
From: Chetan Raval [mailto:ravalc@hotmail.com]
Sent: Wednesday, June 25, 2014 12:08 AM
To: Keith Marvin
Cc: Chetan Raval; ravalsejal@gmail.com
Subject: Sandy Lake construction
Hi Keith,
Hope you are doing good. Regarding the Sandy Lake construction, they have
now broken my driveway and the part of Georgian Drive with the ramp going
down towards Sandy Lake.
As they have broken my driveway, one very important thing that comes to mind
is that when they do the reconstruction, they need to match the texture and the
color of my driveway. The reason I am mentioning this is because there is a
special texture and color on my driveway and I would not like my driveway look
like two different pieces when all the work is completed. That will certainly
reduce the value of my house significantly.
Can you please assure me of the same?
Thanks
Chetan
2