ST9902-LR131029ra
Consulting Engineering * Geotechnical Engineering * Construction Materials
3228 Halifax Street, Suite A, Dallas, Texas 75247
Phone: (972) 444 -8889 Fax: (972) 444 -8893
Acct ID: 1770 File No: C13 -0634
Report Date: 10/29/2013
Project: West Sandy Lake Road
Location: densities on box culvert; conc on inlet
Client: City of Coppell
REPORT. Job Cancellation
Date Sampled: 10/28/2013
Sampled By: Richard Jones
By Order Of:
Order Number: 1770
LAB NO: 153819
TEST RESULTS Report No: 153819
Page 1 of 1
On this date, a representative of Alliance Geotechnical Group visited the above referenced project site to perform the
scheduled testing. After arrival to the job site, the testing was canceled and /or postponed for the reasons noted.
• The density tests and concrete placement were cancelled.
Thank you for allowing Alliance Geotechnical Group the opportunity to provide construction materials testing services for
this project. Should you have any questions and /or comments, please contact our office.
Client: City of Coppell Attn: Mr. Rick O'Dell (1 -cc copy)
Orig: City of Coppell (Coppell, TX) Attn: Mr. Keith Marvin, P.E.
Respectfully Submitted,
Alliance Geotechnical Group
— /&- 1-at<_
Perry C. Kakara, CME Department Manager
THIS REPORT APPLIES ONLY TO THE STANDARDS OR PROCEDURES INDICATED AND TO THE SAMPLE(S) TESTED AND /OR OBSERVED AND ARE NOT NECESSARILY INDICATIVE OF
THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS OR PROCEDURES. NOR DO THEY REPRESENT AN ONGOING QUALITY ASSURANCE PROGRAM UNLESS SO
NOTED. THESE REPORTS ARE FOR THE EXCLUSIVE USE OF THE ADDRESSED CLIENT AND ARE NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION.