Loading...
ST9902-CS131014 Rhonda Adloo From:Rick Odell Sent:Monday, October 14, 2013 10:23 AM To:Rhonda Adloo Subject:Fwd: Submittals Sent from my iPhone Begin forwarded message: From: <ROdell@coppelltx.gov> Date: October 14, 2013, 10:20:20 AM CDT To: "jwilliams_rkm@yahoo.com" <jwilliams_rkm@yahoo.com> Cc: Michael Garza <MGarza@coppelltx.gov> Subject:Submittals The submitals look ok to me with the exception that we only allow full size DI fittings. Not compact fittings unless necessary All fittings are DI and no cast iron fittings allowed. Sent from my iPhone 1 Rhonda Adloo From:Rick Odell Sent:Monday, October 14, 2013 10:22 AM To:Rhonda Adloo Subject:Fwd: west sandy lake electrical submittal Sent from my iPhone Begin forwarded message: From: Rick Odell <ROdell@coppelltx.gov> Date: October 14, 2013, 10:21:19 AM CDT To: Rick Odell <ROdell@coppelltx.gov> Subject: Fwd: west sandy lake electrical submittal Sent from my iPhone Begin forwarded message: From: Keith Marvin <KMarvin@coppelltx.gov> Date: October 14, 2013, 10:09:15 AM CDT To: "Lance Smith (lsmith@TiseoPaving.com)" <lsmith@TiseoPaving.com> Cc: Rick Odell <ROdell@coppelltx.gov> Subject: FW: west sandy lake electrical submittal Lance, This is all I see for comments on the Mels submittals. I don’t know if this was just a traffic signal submittal, or if there were electrical items in it as well. Keith Marvin, P.E. City of Coppell 972-304-3681 From: George Marshall Sent: Friday, September 06, 2013 3:06 PM To: Rick Odell Cc: Keith Marvin Subject: RE: west sandy lake electrical submittal Rick, We have reviewed the attached submittal and would like to add the following comments: 1)UPS battery backup – 1 a.We utilize the 51Ah batteries and not the 41Ah. b.Item 56 mentions a 4 battery cabinet but the 72 volt system requires 6 batteries. c.We would like to verify that the battery cabinet will be attached to the controller cabinet and not installed with a separate pad. 2)Signal Poles – We will need to see a color sample for the powder coat finish. Thank You, George S. Marshall, P.E. Civil Engineer City of Coppell 265 Parkway Blvd. Note we have moved P.O. Box 9478 Coppell, TX 75019 972-304-3562 Customer Service Survey: http://www.surveymonkey.com/s/RVXVDH6 From: Rick Odell Sent: Wednesday, August 28, 2013 8:19 AM To: George Marshall Subject: Fwd: west sandy lake electrical submittal Sent from my iPhone Begin forwarded message: From: "Robert Caudill" <rcaudill@TiseoPaving.com> To: "Rick Odell" <ROdell@coppelltx.gov> Cc: "Keith Marvin" <KMarvin@coppelltx.gov> Subject: FW: west sandy lake electrical submittal Rick; Please find attached the electrical and traffic submittals. Review and respond. Robert Caudill Vice President Tiseo Paving Company (972) 289-0723 From: David Gonzales [mailto:david@melselectric.com] Sent: Tuesday, August 27, 2013 9:51 AM To: Robert Caudill; Shane Pate Cc: Johnny Heine Subject: west sandy lake electrical submittal Robert / Shane, I have attached the electrical & traffic Signal submittal for this project, please let me know when it is approved so that we can release materials. 2 Thanks, David R. Gonzales Mels Electric, L. P. 6305 South I.H. - 45 Wilmer, Texas 75172 972-441-6208 ( phone ) 972-441-6394 ( fax ) david@melselectric.com 3