Loading...
ST9902-LR130909 (2)ALLIANCE GEOTECHNICAL GROUP CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS 7970 W. Main Street, Frisco TX 97033 Phone:214- 618 -4100 Fax: 214 - 618 -4110 DRILLED PIER INSPECTION REPORT CLIENT: PROJECT: AGG REPORT M REPORT DATE: INSPECTOR /DATE: DRILLING COMPANY: STRUCTURE: City of Coppell West Sandy Lake C13-0634-151120 09/09/13 Duce Roberts /9 -5 -13 DISTRIBUTION: Rick O'Dell - City of Coppell Keith Marvin, P.E. - City of Coppell Paae 1 of 1 Pier Location (Grid Lines) 4H 4K Design Shaft Diameter (inches) 36.0 inches 36.0 inches Design Penetration (feet) 5.0 feet 5.0 feet Elevation of Top of Pier 479.4 inches 479.0 inches Ground Elevation 481.3 inches 481.3 inches Actual Shaft Diameter 36.0 feet 18.0 feet Depth to Bearing Stratum (Very Hard Gray Sandy Shale) * 39.5 feet 38.1 feet Required Pier Depth 44.5 feet 43.1 feet Actual Pier Depth 47.3 feet 44.2 feet Actual Pier Penetration 7.8 feet 6.1 feet Elevation of Top of Bearing Stratum 441.8 feet 443.2 feet Elevation of Bottom of Pier 434.0 feet 437.1 feet Pier Location within Tolerance yes yes Pier Plumb within Specifications yes yes Casing Required yes yes Length of Casing 32.4 feet 32.1 feet Depth to Top of Casing ( " -" (minus) if above ground) -2.0 feet -2.6 feet Depth to Bottom of Casing 30.4 feet 29.5 feet Depth Required due to Casing na na Water Present in Hole at Concrete Pour no no Pier Bottom Clean yes yes Vertical Bars (Number & Size 10- #9's 646's Horizontal Ties (Size & Spacing) #3 @6 #3 @6 Steel Cage Diameter 30.0 inches 12.0 inches Length of Steel Cage 47.0 feet 41.9 feet Concrete Placed in Center of Pier Hole with a Hopper or Inverted Chute Inverted Chute Inverted Chute REMARKS ALLIANCE GEOTECHNICAL GROUP /_��