ST9902-LR130905ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
7970 W. Main Street, Frisco TX 97033 Phone:214 -618 -4100 Fax: 214 - 618 -4110
DRILLED PIER INSPECTION REPORT
CLIENT:
PROJECT:
AGG REPORT #:
REPORT DATE:
INSPECTOR/DATE:
DRILLING COMPANY:
STRUCTURE:
City of Coppell
West Sandy Lake
C13-0634-150986-1
09/05/13
Duce Roberts /9 -3 -13
DISTRIBUTIUN:
Rick O'Dell - City of Coppell
Keith Marvin, P.E. - City of Coppell
Page 1 of 1
Pier Location (Grid Lines)
3E
3F
Design Shaft Diameter (inches)
36.0 inches
36.0 inches
Design Penetration (feet)
5.0 feet
5.0 feet
Elevation of Top of Pier
468.9 inches
469.0 inches
Ground Elevation
471.8 inches
471.8 inches
Actual Shaft Diameter
36.0 feet
36.0 feet
Depth to Bearing Stratum
(Very Hard Gray Sandy Shale)
32.8 feet
32.5 feet
Required Pier Depth
37.8 feet
37.5 feet
Actual Pier Depth
38.0 feet
37.6 feet
Actual Pier Penetration
5.2 feet
5.1 feet
Elevation of Top of Bearing Stratum
439.0 feet
439.3 feet
Elevation of Bottom of Pier
433.8 feet
434.2 feet
Pier Location within Tolerance
yes
yes
Pier Plumb within Specifications
yes
yes
Casing Required
yes
yes
Length of Casing
19.6 feet
19.6 feet
Depth to Top of Casing
( " -" (minus) if above ground)
-1.8 feet
-1.6 feet
Depth to Bottom of Casing
17.8 feet
18.0 feet
Depth Required due to Casing
na
na
Water Present in Hole at Concrete Pour
no
no
Pier Bottom Clean
yes
yes
Vertical Bars (Number & Size
10- #9's
10- #9's
Horizontal Ties (Size & Spacing)
#3 @6
#3 @6
Steel Cage Diameter
30.0 inches
30.0 inches
Length of Steel Cage
39.0 feet
39.0 feet
Concrete Placed in Center of Pier Hole with a
Hopper or Inverted Chute
Inverted Chute
Inverted Chute
REMARKS:
ALLIANCE GEOTECHNICAL GROUP
ALLIANCE GEOTECHNICAL GROUP
CONSULTING ENGINEERING * GEOTECHNICAL ENGINEERING * CONSTRUCTION MATERIALS
7970 W. Main Street, Frisco TX 97033 Phone:214 -618 -4100 Fax: 214 - 618 -4110
DRILLED PIER INSPECTION REPORT
CLIENT:
City of Coppell DISTRIBUTION:
PROJECT:
West Sandy Lake Rick O'Dell - City of Coppell
AGG REPORT #:
C13- 0634 - 151071 -1 Keith Marvin, P.E. - City of Coppell
REPORT DATE:
09/05/13
INSPECTOR/DATE:
Duce Roberts /9 -4 -13
DRILLING COMPANY:
STRUCTURE:
5.0 feet
Paqe 1 of 1
Pier Location (Grid Lines)
4J
Design Shaft Diameter (inches)
36.0 inches
Design Penetration (feet)
5.0 feet
Elevation of Top of Pier
479.2 inches
Ground Elevation
481.3 inches
Actual Shaft Diameter
36.0 feet
Depth to Bearing Stratum
(Very Hard Gray Sandy Shale) *
38.8 feet
Required Pier Depth
43.8 feet
Actual Pier Depth
47.4 feet
Actual Pier Penetration
8.6 feet
Elevation of Top of Bearing Stratum
442.5 feet
Elevation of Bottom of Pier
433.9 feet
Pier Location within Tolerance
yes
Pier Plumb within Specifications
yes
Casing Required
yes
Length of Casing
32.4 feet
Depth to Top of Casing
( "" (minus) if above ground)
-1.95 feet
Depth to Bottom of Casing
30.5 feet
Depth Required due to Casing
na
Water Present in Hole at Concrete Pour
no
Pier Bottom Clean
yes
Vertical Bars Number & Size
10- #9's
Horizontal Ties Size & Spacing
#3 @6
Steel Cage Diameter
30.0 inches
Length of Steel Cage
46.8 feet
Concrete Placed in Center of Pier Hole with a
Hopper or Inverted Chute
Inverted Chute
REMARKS
ALLIANCE GEOTECHNICAL GROUP