Frank Addition-CS 901105Municipal'a-~i'~ltility Contractor's Services
A'hter~'tior~-'- Larry Davis
RE: Ai,- 're.r.~ &
11/5/90
Dear Sir:
I~o wa~ c:orr~rao~d to perform
footage
standards
9 Line One,
On 10-...17-- 0
re.mb for Ae'ro Valley Constructioil. The job locatiol~
Lake & Hear'tz. We tested one 6" line, with a lir~ea'r
approximately 150'. This li~e passed well withir~ the
the C:i. ty (:)f Coppell.
Also a't 'Ll'~is 'Lime we com01e'l;ed a mar,al'tel 'test or~ the marne
l:Lne. Once aaait'~ bhe lithe p~s~ed w~ bh ~o problems.
We app'reoia~e 'the o[~por'~ur~i'Ly to a~ie~t the City of Copp~ll
and look forward
Vice
(214) 436-4568
515 N. Kealy Street
Lewisville, Texas 75057
19350 FM 1093
· Richmond, Texas 77469 (713) 579-0074