RE: sewer crossing-freeport parkway (2)Mike/Keith,
Yes…please note the attached exhibit. I’d hoped to send to you last
week but we had an electrical fire in the building and shut down all
power Wed afternoon – Sunday morning. Bet you’ve never heard that excuse
before!
We’ve indicated the WSEL for several storm events in the channel which
it turns out will inundate the pipe in just about every event. After
visiting with Keith last week we decide to look at an option of
providing a minimum of 5’ clearance at the pilot channel. Doing so will
place the line close to the top of the shelf with minimum cover but a
little concrete encasement should take care of that. If necessary we can
even add a toe to the cap.
Please review and let me know if you have any comments. I can stop by
late this afternoon if you are available to discuss.
Thanks
Chris
Chris Schmitt, P.E.
Principal
17304 Preston Road, Suite 1340
Dallas, Texas 75252
214.461.9867 Main
214.988.9913 Direct
903.421.1897 Mobile
214.461.9864 Fax
cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com>
From: Michael Garza [mailto:MGarza@coppelltx.gov]
Sent: Monday, August 04, 2014 4:15 PM
To: Chris Schmitt
Subject: sewer crossing-freeport parkway
Do you have anything for Keith and I to look at?
Thanks,
Michael Garza, P.E.
Assistant Director of Engineering
Engineering Department
City of Coppell, TX
www.coppelltx.gov <http://www.coppelltx.gov>
972-304-7019 (office)
<http://www.coppelltx.gov/>
<https://www.facebook.com/pages/City-of-Coppell-TX-Municipal-Government/
324357528624> <https://twitter.com/CityofCoppell>
<http://www.youtube.com/CityOfCoppellTX>
<http://www.coppelltx.gov/ecocoppell-522.html>
Please take our customer service survey