RE: Street Light - Drilled Shaft Foundation Design depths for Freeport Parkway and Sandy LakeKeith/George, Please note the revised foundation detail attached to this e-mail. Based on our calculations, the overall depth of the foundations should be increased from 6’ (as noted in the original plan set) to 10’. As such the total amount of steel reinforcing should also be increased. We did develop a solution which would salvage the existing cages and allow for lapping of the extension and additional reinforcing steel. Additionally, after visiting with Robert it’s my understanding that the bolt pattern is still unresolved. As this detail needs to be resolved soon please let us know how we can assist further. Please review and let me know if you need a sealed drawing/narrative to issue to the contractor(s) or have any further questions. Chris Chris Schmitt, P.E. Principal 17304 Preston Road, Suite 1340 Dallas, Texas 75252 214.461.9867 Main 214.988.9913 Direct 903.421.1897 Mobile 214.461.9864 Fax cschmitt@tnpinc.com <mailto:cschmitt@tnpinc.com> From: Robert Jenkins Sent: Monday, August 04, 2014 2:03 PM To: George Marshall, PE (gmarshall@coppelltx.gov) Cc: Chris Schmitt; Keith Marvin; Keith Burkholder; Michael Garza (MGarza@coppelltx.gov); Mike Jones Subject: FW: Street Light - Drilled Shaft Foundation Design depths for Freeport Parkway and Sandy Lake George, In support of your Option A to use the 24” foundation, I asked Keith Burkholder, our structural lead, to perform the analysis for the light pole foundations on Freeport Parkway and Sandy Lake using our available Geotech data. It resulted in a 16’ depth for a heavier 24” foundation as defined below. As you can see, he also included what might be expected in terms of cost at $1,146 per foundation using TxDOT Dallas’s average bid experience. Let me know if have questions. Thanks, Robert From: Keith Burkholder Sent: Friday, August 01, 2014 2:22 PM To: Robert Jenkins Cc: Chris Schmitt Subject: RE: Street Light - Drilled Shaft Foundation Design depths for Freeport Parkway and Sandy Lake Robert, using the TxDOT average bid price index for the Dallas District the unit price for a 24” D.S. is $71.57/ LF x 16 Ft. length = $1,146 per light pole foundation. Keith Burkholder, P.E. Senior Structural Engineer 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7177 Direct 214.675.1704 Mobile 817.336.2813 Fax KBurkholder@tnpinc.com <mailto:KBurkholder@tnpinc.com> From: Keith Burkholder Sent: Friday, August 01, 2014 2:05 PM To: Robert Jenkins Cc: Chris Schmitt; Mitch Holmes; Zegeye Gurmu; Mike Jones Subject: RE: Street Light - Drilled Shaft Foundation Design depths for Freeport Parkway and Sandy Lake Robert, I finished the design for a 24” diameter straight sided drilled shaft foundation to support the proposed typical 35’ tall double armed street light pole and came up with a drilled shaft embedment depth of 16 ft. into the existing grade and reinforced with 8- #7 bars with #3 spiral ties with a 6” pitch, one flat turn top & bottom. Let me know how you want to present this design to the City, in regards to a sketch or by notes. Also, let me know if you have any further questions. Sincerely, Keith Burkholder, P.E. Senior Structural Engineer 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7177 Direct 214.675.1704 Mobile 817.336.2813 Fax KBurkholder@tnpinc.com <mailto:KBurkholder@tnpinc.com> From: Robert Jenkins Sent: Thursday, July 31, 2014 2:08 PM To: Keith Burkholder Cc: Chris Schmitt; Zegeye Gurmu; Suki Y. Hay; Mitch Holmes; Mike Jones Subject: Design of Foundation depths for Freeport Parkway and Sandy Lake Keith, I am requesting your assistance in determining the subject depths that will be needed. Since our early discussions, George has recently expressed desire to stay with the 24” piers. We will be providing a transformer base, 35’ poles and two - 8’ arms with 2 - 25 to 35 # fixtures on them. I will bring you the boring data from the bridge areas that we looked at previously. Let me know if more data is needed. If possible I need the design depth early next week. Let me know if that is not possible. You may charge to CPL14191 – Task 2. Thanks for your help. Robert Robert W. Jenkins, P.E. Traffic Engineering Manager 1100 Macon Street Fort Worth, Texas 76102 817.336.5773 Main 817.665.7160 Direct 817.404.2938 Mobile 817.336.2813 Fax rjenkins@tnpinc.com <mailto:rjenkins@tnpinc.com>