Loading...
WA8801-CS 860121 BID TABULATION MISCELLANEOUS WATERLINES COPPELL, TEXAS January 21, 1986 10:00 AM BIDDER PHASE A PHASE B PHASE C TOTAL B & B Consultant Co. P.O. Box 280357 Dallas, TX 75228 Bid bond 5% GAB Insurance Company: -' Great American Insur. $392,440.16 $96,575.24 $138,803.32 $627,818.72 Charles Cohen, Inc. P.O. Box 29409 Dallas, TX 75229 Bid bond 5% GAB Insurance company: Fidelity & Deposit Co. $305,417.00 $103,625.39 $111,813.51 $520,855.90 Stimson Contracting P.O. Box 18027 Dallas, TX 75218 Bid bond 5% GAB Insurance company: American Nat. Fire Insur. $328,517.99 $129,388.13 $160,210.37 $618,116.49 Greenwood Construction 105 W. Willow Nocona, TX 76255 Bid bond 5% GAB Insurance company: Aetna Life & Casualty $265,188.14 $81,682.00 $95,078.58 $441,948.72 Haukos Construction 6103 Bluff Point Dallas, TX 75248 Bid bond 5% GAB Insurance company: Fidelity & Deposit Co. $219,753.52 $67,716.79 $106,325.99 $393,796.30 I certify this to be a true and correct tabulation of bids for the above project as taken on January 21, 1986. ~~~-~-~---- January 22, 1986 Ginn, Inc. - Consulting Engineers Date · ~,., I 1 .... IF ......... l ....