RE: Final Acceptance Letter
Prologis Park One Twenty One
Lot 4 Blk A (Subaru)
Dear Mr. Ward:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. Please note that the infrastructure package will be
under a different acceptance letter. The two-year maintenance bonds have been received.
Maturity on the bonds will be two years from the date of this letter. Maturity on the
Erosion Control Bond LC will also be two years from the date of this letter.
You may notify MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow up inspection of the facilities will be conducted prior to the lapse of the two-
year bond period. If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
Marcus M n6n
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
cc: Ken Griffin, P.E., Director of Engineering and Public Works
Kent Collins, P.E., Assistant Director of Engineering
Michael Garza, P.E., Assistant Director of Public Works
Suzanne Arnold, Chief Building Official
Tim Oates, Deputy Fire Chief
Jennifer Miller, Finance Director
T H E - C I T Y - O F
COPPELL
L �
8 A a 8
October 13, 2016 I )
Tim Ward
The Conlan Company
1501 LBJ Freeway, Suite 550
Farmers Branch, TX 75234
RE: Final Acceptance Letter
Prologis Park One Twenty One
Lot 4 Blk A (Subaru)
`J
Dear Mr. Ward: v�
Representatives of the City of Coppell have confirmed a final inspection of paving and O
utilities for the referenced project. Please note that the infrastructure package will be
unde ifferent acceptanceletter The two-year maintenance on s ave een received.
Maturity on the bonds will be two years from the date of this letter. Maturity on the
Erosion Control Bond LC will also be two years from the date of this letter.
You may notify MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow up inspection of the facilities will be conducted prior to the lapse of the two-
year bond period. If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
Marcus Marion
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
cc: Ken Griffin, P.E., Director of Engineering and Public Works
Kent Collins, P.E., Assistant Director of Engineering
Michael Garza, P.E., Assistant Director of Public Works
Suzanne Arnold, Chief Building Official
Tim Oates, Deputy Fire Chief
Jennifer Miller, Finance Director