Loading...
Subaru- CS161013T H B - C I T Y - O F COPPELL e fir': a October 13, 2016 Tim Ward The Conlan Company 1501 LBJ Freeway, Suite 550 Farmers Branch, TX 75234 RE: Final Acceptance Letter Prologis Park One Twenty One Lot 4 Blk A (Subaru) Dear Mr. Ward: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. Please note that the infrastructure package will be under a different acceptance letter. The two-year maintenance bonds have been received. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond LC will also be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection of the facilities will be conducted prior to the lapse of the two- year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Marcus M n6n Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering and Public Works Kent Collins, P.E., Assistant Director of Engineering Michael Garza, P.E., Assistant Director of Public Works Suzanne Arnold, Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director T H E - C I T Y - O F COPPELL L � 8 A a 8 October 13, 2016 I ) Tim Ward The Conlan Company 1501 LBJ Freeway, Suite 550 Farmers Branch, TX 75234 RE: Final Acceptance Letter Prologis Park One Twenty One Lot 4 Blk A (Subaru) `J Dear Mr. Ward: v� Representatives of the City of Coppell have confirmed a final inspection of paving and O utilities for the referenced project. Please note that the infrastructure package will be unde ifferent acceptanceletter The two-year maintenance on s ave een received. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond LC will also be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection of the facilities will be conducted prior to the lapse of the two- year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Marcus Marion Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering and Public Works Kent Collins, P.E., Assistant Director of Engineering Michael Garza, P.E., Assistant Director of Public Works Suzanne Arnold, Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director