Loading...
Prologis Park-160912T ,R i c 1 ir 'Y' 0 F iQOFP,E�".� LIL INSPECTION FEE CALCULATION SHEET Project Name Prologis Park 121 - Building 3 Date 9/12/16 Page 3 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected b) the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineerin€ Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of both colored fields) (51AQ) p(vVl imk- ?&(n 4 p 43,391.46 C4 Id - 3 i 1.�11R pR� v�UaR .�w�a,1 Submit by E-mail Print Farm PUBLIC IMPROVEMENTS CONTRACT AMOUNT X4%= ° _ PRIVATE IMPROVEMENTS CONTRACT AMOUNT X2%= Paving 24,749.00 989.96 1,505,886.00 30,117.72 Water 8,800.00 352.00 212,545.00 4,250.90 Sanitary Sewer 0.00 0.00 7,680.00 153.60 Storm Sewer 23,895.00 955.80 234,803.00 4,696.06 Alleys 0.00 0.00 0.00 0.00 Sidewalks 23,547.00 941.88 46,677.00 933.54 Other 0.00 0.00 0.00 0.00 Total 80,991.00 3,23J,64 2,007,591.00 q15 8 - Grand Total (total of both colored fields) (51AQ) p(vVl imk- ?&(n 4 p 43,391.46 C4 Id - 3 i 1.�11R pR� v�UaR .�w�a,1 Submit by E-mail Print Farm