Loading...
Freeport NIP(3)-LR 951116reed engineering GEOTECHNICAL CONSULTANTS November 16, 1995 Project No. 2~17.2/Report No. 9 M.E.P.C. American Properties, Inc. 15303 Dallas Parkway, Suite 100, LB-10 Dallas, Texas 75248 ATTN: Mr. Rob Ahmuty Re: Construction Materials Testing Craftmade Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities of November 7 and 10, 1995. On the referenced dates, a total of 11 field density tests were taken on paving subgrade and electrical line backfill. Test results are shown on Plate 1. Where tested, materials were found to be in compliance with project specifications. Additional reports will be submitted as work progresses. any questions, do not hesitate to call. If you have Sincerely, REED ENGINEERING INC. Ronald F. Reed, P E. BES/RFR/msm copies submitted: (1) M.E.P.C. American Properties, Inc./ Mr. Rob Ahmuty (1) Gromatzky Dupree and Associates/ Mr. Scott McCrary (1) McFadden & Miller/Mr. Jon Jacobsen (1) Eckland Consultants/Mr. Jerry Holstrom (1) City of Coppell/Mr. Lee Stone ~1) City of Coppell/Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 reed engineering CRAFTMADE COPPELL, TEXAS REPORT NO. 9 Field Density Tests Depth Below Final Test S.G. Date No. Location (feet) Unit Dry Moisture Weight Content (pcf) (%) 11-07-95 325 326 120'S, 20'E(1,2) 0 327 60'N, 40'W(1,2) 0 328 210'N, 25'W(1,2) 0 329 370'N, 23'W(1,2) 0 11-10-95 330 300'N, 20'W(1,3) 3 331 280'N, 20'W(1,3) 3 332 260'N, 20'W(1,3) 2 333 240'N, 20'W(1,3) 2 334 200'N, 20'W(1,3) 2 335 120'S, 20'W(2,4) 0 40'S, 50'E(1,2) 0 0 0 0 0 0 0 0 5 5 0 0 91.5 91.2 91.7 103 4 106 7 92 0 92 0 90 2 91 0 91 0 91 2 Com- pac- tion Curve Level No. (%) 26.7 I 99.4 24.9 1 99.1 25.3 1 99.0 25.5 2 95.4 25.7 2 98.4 22.8 1 99.1 26.0 1 99.1 26.3 1 97.1 24.7 1 98.0 25.8 1 98.0 27.0 1 98.2 Footnote~: (1) Location referenced from S.W. building corner. (2) Test taken on paving subgrade. (3) Test paving on electrical line backfill. (4) Location referenced from N.W. building corner. GEOTECHNICAL CONSULTAN~ PLATE 1