Prologis Park-CS161020T H E. C I T Y O F
COPPELL
r a
September 8, 2016
Robert Gossett, P.E.
Halff and Associates, Inc.
1201 North Bowser Road
Richardson, Texas 75081
RE: Prologis Park lot 1 Blh B (IPrnilcpaeit; 6)
Fee Assessment Letter
Dear Mr. Gossett
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount f $69,033.60 an orward
to the Engineering Department along with a copy of the Fee Assessment table. T r portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer
Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the
Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified.
The construction inspection fees must be paid prior to scheduling a pre -construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerel
George S. Marshall, P.E.
Engineering Manager
cc: Jennifer Miller, Finance Director
Rachel Evans, Administrative Technician, Building Inspections
Michael Garza, P.E., Assistant Director of Public Works
Tim Oates, Deputy Chief/Prevention
Brad Reid, Director of Parks and Recreation
Suzanne Arnold, Chief Building Official
?,-4-(?X— (?,( o" 6
Project: Prologis Park 121 Lot IR Bllr B (Building 6)
Date: 9/9/2016
-
TOTAL
AMOUI`\\IT DU
FEES DUE
I'MOR TO
I'IL1[14G
wu,AT_
Water Impact Fee
_
$11,844.00—
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$882.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$882.00
T
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$4,797.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$69,033.60
$69,033.60
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL IF
$87,858.60 11
$69,033.60
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
ROADWAY IMPACT IF' EE CALCULAT(Ofl,'
PROJECT: Prologis Pork 121 Lot IR 61Ir B (/Building 6)
DATE: 9/9/2016
ROADWAY IMPACT FEE:
Service Area *
I
Category **
Light Industrial
Land Use **
General Light Industrial
Building Areas
143,820
Development Units **
143.82
Vehicle Miles per Development Unit **
3.2
Fee per Vehicle Mile ***
$150
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit x Fee per Vehicle Mile = $69,033.60
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4. 10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)
DEVELOPMENT FEE WORKSHEET
PROJECT: Nologis Purlr 121 Lot IR B& B (Building 6)
DATE: 9/9/2016
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 5.33 ESU's
Irrigation Meter(s): 1 - 2 inch = 5.33 ESU's
0 = 0 ESU's
Fireline Meter(s): 2 - 8 inch = 2.5 ESU's
Total #: 13.16 ESU's @ $900.00 ea. $11,844.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea. $200.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Wate►• Meter Fee:
Total #: 1 Domestic Meter(s) @ $882.00
$882.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
(This fee may change at the time of pick up)
IL•rigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $882.00
$882.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
$0.00
Total #: 2 Fireline Meter(s) @ n/a
meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
L•rigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5.33 @ $900.00 ea.
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
$30.00
$90.00
$4,797.00
$50.00
$50.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
Single-family @ $0.00 per lot
Multi -family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Lnpact Fee:
(See attached fee calculations)
Street Ligl►tiug Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
$0.00
$69,033.60
Information not Available
Information not Available
Information not Available
x
00
t74�b
O
o
CD a
.
r
�
z
m
m
p 0
H
Mi
O
*
a
00
Oi
0
o
zs
H
m
z
5�
n
as
T,
O
x
m
m
z
»
D
m:
m
�p
D
m
c
w
pi
-z
-1
x'
y
x
�i
Ln
Z)
N
Uloo
i
rn
J
w
o.
p;
f
��