Loading...
Frontier-PT161028RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval  Date of Submittal: Applicant’s Job # / Work Order # PERMIT FEE:$100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Utility Company Represented: Oncor Electric Delivery Atmos Energy Verizon SBC/ AT&T Time Warner Cable CoServ Electric/Gas Other Estimated Start Date Estimated Completion Date* * Completion requires submittal of Completion Verification Notice (see page 4) Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: Yes No Is removal of existing streets, alleys, or sidewalks necessary? Yes No  CC: Applicant Public Works Permit File Orig. to Project File Page 1 of 4 Rev. 06/2012 A copy of the approved permit must be on the job site at all times. Yes No                       Right-of-Way Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600  Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 Attach barricade plan / trench safety plan if a lane or street closure is required. NOTE:   Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work.   NOTE:Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. Comments   DateSignature of City Representative DateSignature of Contractor Representative DateSignature of Utility Company Representative   Scott Latta 28 October 2016 UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: 1.A copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. 5.Sod is to be replaced when necessary. 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. 8.Repair existing utilities that are damaged, including but not limited to clean-outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utility-operations-division 972/ 462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/ 304-3678 (Planning Department) TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN. 214/ 320-5455 (Mike Rasmussen)940/ 898-5138 AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY 214/ 215-3031 (Rich Millenman)817/ 588-5800 COSERV Gas & Electric DENTON CO. LEVEE DISTRICT 940/ 321-7800 x 7624 (Greg Ward)214/ 352-5118 (Richard Hightower) EXPLORER PIPELINE Atmos Energy 918/ 493-5100 (Patrick Nwakoby)972/360-4428 (Gary Dickinson) ONCOR Electric Delivery 972/ 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 1 800 DIG TESS for line locates 972/ 318-5277 (344 - 8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16.“Clean-up” requires returning work area to pre-project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) Page 3 of 4 Page 4 of 4 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's Work Order # (if applicable) Sub-contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL      Follow-up needed? Follow-up scheduled for Yes No and found to be acceptable / not acceptable because of Streets Maintenance Division on Inspected by and found to be acceptable / not acceptable because of Utilities Maintenance Division on Inspected by Follow-up needed? Follow-up scheduled for Yes No 