Loading...
Park West Crossing-LR161028STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:94151183.0313 Service Date:10/28/16 * Report Contains Deviation(s)8901 Carpenter Fwy Ste 100 Report Date:10/31/16 Dallas, TX 75247-4547 214-630-1010 Reg No: F-3272 Client Project ML Realty Partners Park West Crossing - Phase 2 Attn: Timothy Geisler SEC Freeport Pkwy & Southwestern Blvd One Pierce Pl Ste 450W Coppell, TX Itasca, IL 60143 Project Number: 94151183 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 2 sbv On this date, Terracon's representative arrived at the above referenced job site as scheduled for structural steel observations. A visual observation was performed as noted below. A.Building F, Roof Level Framing @ A-E/1-14. Re-observation Item From Report 94151183.0302: 1.Joist bridging was now determined to be compliant. B.Building F, Roof Level Framing @ A-E/1-14: 1.Tilt wall panel to panel welded connections were determined to be compliant. 2.Joist to girder mid-span ST Brace installations were determined to be compliant. C.Building G, Roof Level Framing @ A-E/1-10. Re-observation Items From Reports 94151183.0295 & 94151183.0302: 1.Tilt wall panel to pier cap, leaveout panel at west wall line 1, welds were determined to be compliant. 2.Joist bridging was now determined to be compliant. D.Building G, Roof Level Framing @ A-E/1-5: 1.Perimeter metal deck support angle installations, stitch welds were determined to be compliant. *2.Metal Deck Installation a.Side lap screws were determined to be compliant. *b.Puddle welds, fifteen (15) locations were found to be incomplete. E.Building G, Roof Level Framing @ A-E/1-10: *1.Tilt wall panel to panel welded connections, one (1) location @ E/10 was found to be incomplete (northeast corner). *2.Joist to girder mid-span ST Brace installations not complete. STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:94151183.0313 Service Date:10/28/16 * Report Contains Deviation(s)8901 Carpenter Fwy Ste 100 Report Date:10/31/16 Dallas, TX 75247-4547 214-630-1010 Reg No: F-3272 Client Project ML Realty Partners Park West Crossing - Phase 2 Attn: Timothy Geisler SEC Freeport Pkwy & Southwestern Blvd One Pierce Pl Ste 450W Coppell, TX Itasca, IL 60143 Project Number: 94151183 Services: Structural steel observations. Terracon Rep.: Randy T. Walcker, C.W.I. Reported To: Contractor:Structure Tone Southwest Report Distribution: (1) ML Realty Partners, Timothy Geisler (1) City of Coppell TX, Matthew Mabry (1) Halff Associates Inc, Hunter Starkey (1) ML Realty Partners, John Benson Reviewed By:____________________________________ (1) O?Brien Architects , Richard Nordyke (1) Structure Tone Southwest Inc., Damon Renaud James D. Baze (1) Structure Tone Southwest Inc., Robin Povey (1) TechniStructures, Jason Owens Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 2 of 2 sbv F.Building H, Roof Level Framing @ A-E/1-11: 1.Foundation level, tilt wall panel to pier cap welded connections were determined to be compliant. 2.Column anchor bolts were determined to be compliant. 3.Joist and girder seat welds were determined to be compliant. 4.Joist bridging was determined to be compliant. 5.Joist seat support lug weldments at the tilt wall panel embed plates were determined to be compliant. 6.Tilt wall panel to panel welded connections were determined to be compliant. *Noted discrepancies and/or incomplete work.