Loading...
WA8801-CS 850923GINN, INC. CONSULTING ENGINEERS September 23, 1985 Mayor Lou Duggan Members of City Council P.O. Box 478 Coppell, TX 75019 Re: MacArthur Boulevard Water Line Reimbursement Gentlemen: Enclosed is a request from Tetra for the reimbursement of $92,430.50 for the installation of a 24" water line in MacArthur Boulevard in lieu of a 12". We have reviewed this request and find that: 1. The installation of the 24" water line conforms to the Master Plan 2. The cost appears to be reasonable for this type of utility work 3. The payment of this "difference in cost" will save the City future funds by not having to construct the line at the City's sole expense It is our recommendation that the City approve this expenditure and that one payment be made upon the safisfactory installation and acceptance of the water line. This payment is to be made with funds appropriated from the recent bond sales. Sincerely, H. Wayne Ginn, P.E. /sr Enclosure Road · Skiire 106 · I)alk,,, Texas, 7524M · Phone 214,'386-6611 T E R R A RECEIVE5 SE::' I ? 1985 August 8, 1985 NDM: 84-7-038 Ginn, Inc. 16135 Preston Road Suite 106 Dallas, Texas 75248 Re: Water Main - MacArthur Boulevard - Riverchase Dear Wayne: As requested by your office, bids were taken for both a 12" Dia. and a 24" Dia. water.main. The difference in the cost $92,430.50; this figure is based on our low bidder. If we are required to install the 24" main, we request that the City Of Coppell pay the difference in the cost of the 12" and the 24" Dia. water main. If you have any questions or require any additional information, please do not hesitate to call. Sincere~~_~.~. ~~a~atterson President JP/sal TERRA COMPANIES TWO LINCOLN C[,NTR5 ',Ui1[ 1370 t:.l:)O LBI FR[[V~/AY ['AL',Ab T,;Y.A% 752-:C+