Loading...
DCT Fellowship-LR161017 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF PIER OBSERVATION DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5310 Harvest Hill Road, Suite 270 Dallas, Texas 75230 ATTN: Mr. Joe Williams REPORT NO. 94 REPORT DATE: 10-17-16 REG PROJECT NO. 20922 TECHNICIAN: N. Hernandez PAGE: 1 of 1 CONTRACTOR: FCL Builders Texas Date Pier No. Pier Diameter (inches) Bell Diameter (inches) Depth Before Bell (feet) Final Depth of Pier (feet) Concrete Length (feet) 09-22-16 J.7/0.9 18 36 16.6 16.6 14.0 J.7/0.8 18 36 16.0 16.1 13.7 J.7/0.7 18 36 16.0 16.4 14.0 J.7/0.6 18 36 16.0 16.3 14.0 Reinforcing Steel: 18” 5 #7 vertical bars with #3 ties at 12 inches O.C. E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/ Mr. Drew Hanlon (1) Pross Design Group/ Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Kevin Roberts (1) DCT Industrial/Ms. Lisa Gajewski Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Ronald F. Reed, P.E. BW/jm