Loading...
DCT Fellowship-LR160922 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5310 Harvest Hill Road, Suite 270 Dallas, Texas 75230 ATTN: Mr. Joe Williams REPORT NO. 92 REG PROJECT NO. 20922 SAMPLE DATE: 09-22-16 TECHNICIAN: N. Hernandez PAGE: 1 of 1 CONTRACTOR: FCL Builders Texas Location of Sample Set Number Location Quantity Represented (c.y.) 1 Screen wall: J.7-0.6, J.7-0.7, J.7-0.8 and J.7-0.9 8/8 Design Information Source of Concrete Mix Identification Specified Strength (psi) WG N/A 3000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 4657 09-29-16 7 61470 4890 4657 10-20-16 28 67300 5360 4657 10-20-16 28 77530 6170 4657 10-20-16 28 71830 5720 5750 4657 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 4657 5.25 12:45 PM 87 94 2.1 149.8 N/A Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Kevin Roberts (1) DCT Industrial/Ms. Lisa Gajewski Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn