DCT Fellowship-LR160922
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
CONCRETE CYLINDER TEST REPORT
DCT Freeport West
Bethel Road and Creekview Drive
Coppell, Texas
REPORTED TO: DCT Industrial Trust
5310 Harvest Hill Road, Suite 270
Dallas, Texas 75230
ATTN: Mr. Joe Williams
REPORT NO. 92
REG PROJECT NO. 20922
SAMPLE DATE: 09-22-16
TECHNICIAN: N. Hernandez
PAGE: 1 of 1
CONTRACTOR: FCL Builders Texas
Location of Sample
Set Number Location Quantity Represented (c.y.)
1 Screen wall: J.7-0.6, J.7-0.7, J.7-0.8 and J.7-0.9 8/8
Design Information
Source of Concrete Mix Identification Specified Strength (psi)
WG N/A 3000
Test Results
Set
No.
Cylinder
ID
Date Tested
Age @
Test
Total Load
(lbs.)
Compressive
Strength (psi)
Average Strength
(psi)
1 4657 09-29-16 7 61470 4890
4657 10-20-16 28 67300 5360
4657 10-20-16 28 77530 6170
4657 10-20-16 28 71830 5720 5750
4657 Hold H
Cylinder Data
Set
No.
Cylinder
ID
Slump
(inches)
Time of
Sample
Air
Temp.
(°F)
Concrete
Temp.
(°F)
Air
Entrainment
(%)
Unit
Weight
(lbs/ft3)
Ticket
Number
1 4657 5.25 12:45 PM 87 94 2.1 149.8 N/A
Note: (1) Concrete was sampled in accordance with ASTM C-31
(2) Concrete cylinders were tested in accordance with ASTM C-39
E-Mail
Distribution: (1) DCT Industrial Trust/
Mr. Joe Williams
(1) DCT Industrial Trust/
Mr. Sophia Montemayor
(1) FCL Builders Texas/Mr. Drew Hanlon
(1) Pross Design Group/Mr. Bobby Pross
(1) City of Coppell/Mr. Marcus Marion
(1) Pacheco Koch/Mr. Clayton Strolle
(1) McHale Engineering/Mr. Matt Skaggs
(1) FCL Builders Texas/
Mr. Kevin Roberts
(1) DCT Industrial/Ms. Lisa Gajewski
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Cary Tipps
Project Manager, CMT
CT/cn