Prologis Park-CS161020 (2)T N it - c 1 T Y . o Pr
COPPELL
a
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
Mame of Applicant Casey DillonDate Submitted 10/20/16
Address of Applicant 2501 N Harwood #2450 Street Dallas TX 75201
Phone Number 4692361434 1 Fax Number
Location of Construction (address, if available): Park 121 - Sandy Lake & Freeport
Subdivision Prologis Park 121 Section # Block # [B=—]l,ol # 1 R
OR Survey/Abstract # �— Acreage
Location description (attach vicinity map): Building 6
1. Type of proposed construction or development:
l: Residential C Alteration of a natural waterway drainage course
C' Non -Residential C' Other (describe & attach drawing or sketch)
C Placement of Fill (in right-of-way or on private property)
2. Description of Construction Permit requested:
X❑ Paving 0 Median or Landscape
0 Sidewalk ❑X Water Main
❑X Drive Approach R.C.P.
❑ Excavation Sanitary Sewer Main
N Fire Lane ❑ Flume
❑ Bridge ❑X Inlet
❑ Box Culvert
❑ Rip Rap
❑ Fill Area
0 Drainage Channel Excavation
Slope Protection/Retaining Wall
Parking Lot
Provide an tjttgthment containing the name and 24 -hr, contact phone number
of supervisor(s) for every contractor working under this general permit.
3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision
Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The
contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance.
4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or
contract for the purpose of permit fee calculation verification.
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION page 2
5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with
the City of Coppell Fee Ordinance. See Page 3 for calculation formula.
Amount Due: $ Z-8, 7,4p .9 6 Date Paid:
NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the
right-of-way not approved by the City Engineer.
➢Any work requiring closure of a lane of traffic, street, or alley must be approved ill
advance by the Engineering Dept., with notification to the following prior to
closure:
Police Department @ 972-304-3600 Street Department a 972-462-5150
Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679
➢Attach barricade plan / trench safety plan of a lane or street closure. (Required)
➢It is a requirement of this permit that As -Built Drawings be turned in at the end of
this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a
CD with Autocad.dwg files.
NOTE: Street closures are allowed from 9:00 a.m. until3_-__30 p.mONLY
unless otherwise approved by City Engineer.
➢A pre -construction meeting is required prior to beginning work related to this permit.
Contact the inspector assigned to your project to schedule the meeting.
Printing your name indicates your acceptance of the terms and conditions of this form;
f
as
Dillon 4692361434
1� D
Signature of App is i Contact Number
I
Signature of Inspector Contact Number
FOR CITY USE ONLY
Is the sill area located in an identified flood hazard area? (' Yes C" --No
If YES, a Floodplain Development Permit is required before any construction can begin.
Is additional information required? C' Yes K No
Are other federal, state, or local permits required? C Yes C;(No
C' PERMIT APPLICATION APPROVED r' PERMIT APPLICATION DENIED
-1 //
Ap Date
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or otter work by the applicant under permit from the City, if such
permit is granted.
Page 3
COPPELL
}5%�•I._. }�'�. 4�l.�rTf 'ems' i � - [�yl
15.
A's
INSPECTION FEE CALCULATION SHEET
Project Name Prologis Park 121 - Building 6 Date 10/13/16
As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected b}
the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering
Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are
due on or before the date of the Pre -construction Meeting.
In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with
completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following
improvements:
Grand Total (total of 28,290.98
both colored fields)
Submit by E-mail I Print Form
PUBLIC 1MPROVF.MENTS
CONTRACT AMOUNT
X A�� —
PRIVATE IMPROVEMENTS
CONTRACT AMOUNT
X 2 _
Paving
4,624.00
184.96
665,421.00
13,308.42
Water
46,200.00
1,848.00
139,495.00
2,789.90
Sanitary Sewer
0.00
0.00
8,400.00
168.00
Storm Sewer
172,892.00
6,915.68
118,958.00
2,379.16
Alleys
0.00
0.00
0.00
0.00
622.54
Sidewalks
1,858.00
74.32
31,127
Other
0.00
0.00
0.00
0.00
Total
225,574.00
9';022;96
963,401.00
19,268:02 `'
Grand Total (total of 28,290.98
both colored fields)
Submit by E-mail I Print Form
Part( 121 - Building 6
CalHar- TotalSanitaryValue
@
4.00%
_ $
�.
Prologls
$ 46,200,00
Thus,CalHar- Private Sanitary
4,00%
_ $
1,848.00
Sanitary
Coppell, TX
Public Storrs
4,00%
— $
Storm
L
Cost of Public Work
Description
Quaritity
Unit
$ 1,858.00
Unit Price
Extended Cost
02530-01
54" Class lit, RCP Storm Drain
45.00
LF
MVCOlV
SITE UTILITIES
$ 12,190.00
02630-02
48" Class III, RCP Storm Drain
494,00
LF
$
Public Water
$ 80,028.00
02530-03
42" Class III, RCP Storm Drain
216,00
LF
$
Item No.
Description
Quanitit
Unit
149.00
Unit Price
Extended Cost
02510-01
Unplug & Conned to Ex. 6"
1.00
Each
S
2,320.00 $
2,320.00
02510.03
17'x8" Cul -In Tee! 17'x6" Cul -In Tee
1.00
Each
S
4,852.00 $
4,852.00
02510-04
17'Gate Valve
1,00
Each
S
1,347.00 $
1,347,00
02510.05
8" Gate Valve
1.00
Each
$
972.00 $
972.00
02510.06
8" Water Main
33,00
LF
$
35,00 $
1,155,00
02510-07
8" DDc & Valve
2,00
Each
$
14,096.00 $
28,192.00
02510-08
Remove & Relocate Ex, Fire Hydrant
4,00
Each
$
2,480.00 $
2,4B0,00
02510.09
2' Irrigation Service ITap Meter PVC)
100
Lot
$
4 882 60 $
4,882.00
SUB -TOTAL: Public Water
$
46,200.00
CalHar - Total Water Value
$
185,695,00
Thus, CalHar- Private Water
S
139,495.00
Public Sanitary
Item No. Description Quanifit Unit Unit Price Extended Cosl
NONE
SUB -TOTAL: Public Sanitary $
SITE CONCRETE
Public Paving
Item No. Description Quanifi Unit Unit Price Extended Cost
02710-01 8" Reinforced Concrete Paving 678.00 SF $ 8.00 $ 4,624.00
at Freeport Pkwy. Approach
SUB -TOTAL: PubllcPaving $ 4,624.00
TAS -Total Paving Value S 670,045.00
Thus, TAS - Private Paving $ 665,421.00
Public Sidewalks
Item No. Description Quanitit Unit Unit Price Extended Cost
02720-01 4" Sidewalk 305.00 SF $ 4.80 $ 1,464.00
02720-02 ADA Ramps 2.00 Each $ 197.00 S 394.00
SUB -TOTAL: Public Sidewalks 6 1,858.00
TAS- Total Sidewalk Value S 32,985.00
Thus, TAS - Private Sidewalk S 31,127.00
INSPECTION FEES
Public
Paving
CalHar- TotalSanitaryValue
@
4.00%
_ $
184,96
$ 8,400,00
$ 46,200,00
Thus,CalHar- Private Sanitary
4,00%
_ $
1,848.00
Sanitary
$ 6,400,00
Public Storrs
4,00%
— $
Storm
$ 172,892.00
Item
Description
Quaritity
Unit
$ 1,858.00
Unit Price
Extended Cost
02530-01
54" Class lit, RCP Storm Drain
45.00
LF
$
265,00
$ 12,190.00
02630-02
48" Class III, RCP Storm Drain
494,00
LF
$
162.00
$ 80,028.00
02530-03
42" Class III, RCP Storm Drain
216,00
LF
$
141,00
S 30,456.00
02530-04
36" Class III, RCP Storm Drain
149.00
LF
$
108,00
$ 16,092.00
02530-07
18" Class III, RCP Storm Drain
116,00
LF
$
55,00
$ 6,380.00
02530-11
4'x4' Wye Inlet
1,00
Each
$
3,872,00
$ 3,872,00
02530-12
6'x 6' Junction Box
1.00
Each
$
6,886,00
S 6,886,00
02530-13
48" Headwall
1.00
Each
$
4,684.00
$ 4,684,00
02530-14
54" Headwall
2.00
Each
$
6,202.00
$ 12 404.00
SUB -TOTAL: Public Sanitary
$ 172,892.00
CalHer- TotalStormValue
$ 291,850.00
Thus,CalHar- Private Storm
$ 118,958.00
SITE CONCRETE
Public Paving
Item No. Description Quanifi Unit Unit Price Extended Cost
02710-01 8" Reinforced Concrete Paving 678.00 SF $ 8.00 $ 4,624.00
at Freeport Pkwy. Approach
SUB -TOTAL: PubllcPaving $ 4,624.00
TAS -Total Paving Value S 670,045.00
Thus, TAS - Private Paving $ 665,421.00
Public Sidewalks
Item No. Description Quanitit Unit Unit Price Extended Cost
02720-01 4" Sidewalk 305.00 SF $ 4.80 $ 1,464.00
02720-02 ADA Ramps 2.00 Each $ 197.00 S 394.00
SUB -TOTAL: Public Sidewalks 6 1,858.00
TAS- Total Sidewalk Value S 32,985.00
Thus, TAS - Private Sidewalk S 31,127.00
INSPECTION FEES
Public
Paving
$ 4,624,00
@
4.00%
_ $
184,96
Water
$ 46,200,00
@
4,00%
_ $
1,848.00
Sanitary
$ -
4,00%
— $
Storm
$ 172,892.00
4.00%
_ $
6,915,68
Sidewalks
$ 1,858.00
@
4,00%
— $
74.32
SUB -TOTAL: Public Inspection Fees
$
9,022.96
Private
Paving
S 665,421.00
2.009%
> $
13,308,42
Water
$ 139,495.(I0
@
2,00%
_ $
2,789,90
Sanitary
$ 8,400.00
@
2.00%
_ $
168,00
Storm
$ 118,958,00
2,00%
e S
2,379,16
Sidewalks
S 31,127,00
A)
2.00%
— $
62254
SUB -TOTAL: Public Inspection Fees
$
19,268,02