Loading...
Prologis Park-CS161020 (2)T N it - c 1 T Y . o Pr COPPELL a CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Mame of Applicant Casey DillonDate Submitted 10/20/16 Address of Applicant 2501 N Harwood #2450 Street Dallas TX 75201 Phone Number 4692361434 1 Fax Number Location of Construction (address, if available): Park 121 - Sandy Lake & Freeport Subdivision Prologis Park 121 Section # Block # [B=—]l,ol # 1 R OR Survey/Abstract # �— Acreage Location description (attach vicinity map): Building 6 1. Type of proposed construction or development: l: Residential C Alteration of a natural waterway drainage course C' Non -Residential C' Other (describe & attach drawing or sketch) C Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: X❑ Paving 0 Median or Landscape 0 Sidewalk ❑X Water Main ❑X Drive Approach R.C.P. ❑ Excavation Sanitary Sewer Main N Fire Lane ❑ Flume ❑ Bridge ❑X Inlet ❑ Box Culvert ❑ Rip Rap ❑ Fill Area 0 Drainage Channel Excavation Slope Protection/Retaining Wall Parking Lot Provide an tjttgthment containing the name and 24 -hr, contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ Z-8, 7,4p .9 6 Date Paid: NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. ➢Any work requiring closure of a lane of traffic, street, or alley must be approved ill advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department a 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 ➢Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. until3_-__30 p.mONLY unless otherwise approved by City Engineer. ➢A pre -construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form; f as Dillon 4692361434 1� D Signature of App is i Contact Number I Signature of Inspector Contact Number FOR CITY USE ONLY Is the sill area located in an identified flood hazard area? (' Yes C" --No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C' Yes K No Are other federal, state, or local permits required? C Yes C;(No C' PERMIT APPLICATION APPROVED r' PERMIT APPLICATION DENIED -1 // Ap Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or otter work by the applicant under permit from the City, if such permit is granted. Page 3 COPPELL }5%�•I._. }�'�. 4�l.�rTf 'ems' i � - [�yl 15. A's INSPECTION FEE CALCULATION SHEET Project Name Prologis Park 121 - Building 6 Date 10/13/16 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected b} the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of 28,290.98 both colored fields) Submit by E-mail I Print Form PUBLIC 1MPROVF.MENTS CONTRACT AMOUNT X A�� — PRIVATE IMPROVEMENTS CONTRACT AMOUNT X 2 _ Paving 4,624.00 184.96 665,421.00 13,308.42 Water 46,200.00 1,848.00 139,495.00 2,789.90 Sanitary Sewer 0.00 0.00 8,400.00 168.00 Storm Sewer 172,892.00 6,915.68 118,958.00 2,379.16 Alleys 0.00 0.00 0.00 0.00 622.54 Sidewalks 1,858.00 74.32 31,127 Other 0.00 0.00 0.00 0.00 Total 225,574.00 9';022;96 963,401.00 19,268:02 `' Grand Total (total of 28,290.98 both colored fields) Submit by E-mail I Print Form Part( 121 - Building 6 CalHar- TotalSanitaryValue @ 4.00% _ $ �. Prologls $ 46,200,00 Thus,CalHar- Private Sanitary 4,00% _ $ 1,848.00 Sanitary Coppell, TX Public Storrs 4,00% — $ Storm L Cost of Public Work Description Quaritity Unit $ 1,858.00 Unit Price Extended Cost 02530-01 54" Class lit, RCP Storm Drain 45.00 LF MVCOlV SITE UTILITIES $ 12,190.00 02630-02 48" Class III, RCP Storm Drain 494,00 LF $ Public Water $ 80,028.00 02530-03 42" Class III, RCP Storm Drain 216,00 LF $ Item No. Description Quanitit Unit 149.00 Unit Price Extended Cost 02510-01 Unplug & Conned to Ex. 6" 1.00 Each S 2,320.00 $ 2,320.00 02510.03 17'x8" Cul -In Tee! 17'x6" Cul -In Tee 1.00 Each S 4,852.00 $ 4,852.00 02510-04 17'Gate Valve 1,00 Each S 1,347.00 $ 1,347,00 02510.05 8" Gate Valve 1.00 Each $ 972.00 $ 972.00 02510.06 8" Water Main 33,00 LF $ 35,00 $ 1,155,00 02510-07 8" DDc & Valve 2,00 Each $ 14,096.00 $ 28,192.00 02510-08 Remove & Relocate Ex, Fire Hydrant 4,00 Each $ 2,480.00 $ 2,4B0,00 02510.09 2' Irrigation Service ITap Meter PVC) 100 Lot $ 4 882 60 $ 4,882.00 SUB -TOTAL: Public Water $ 46,200.00 CalHar - Total Water Value $ 185,695,00 Thus, CalHar- Private Water S 139,495.00 Public Sanitary Item No. Description Quanifit Unit Unit Price Extended Cosl NONE SUB -TOTAL: Public Sanitary $ SITE CONCRETE Public Paving Item No. Description Quanifi Unit Unit Price Extended Cost 02710-01 8" Reinforced Concrete Paving 678.00 SF $ 8.00 $ 4,624.00 at Freeport Pkwy. Approach SUB -TOTAL: PubllcPaving $ 4,624.00 TAS -Total Paving Value S 670,045.00 Thus, TAS - Private Paving $ 665,421.00 Public Sidewalks Item No. Description Quanitit Unit Unit Price Extended Cost 02720-01 4" Sidewalk 305.00 SF $ 4.80 $ 1,464.00 02720-02 ADA Ramps 2.00 Each $ 197.00 S 394.00 SUB -TOTAL: Public Sidewalks 6 1,858.00 TAS- Total Sidewalk Value S 32,985.00 Thus, TAS - Private Sidewalk S 31,127.00 INSPECTION FEES Public Paving CalHar- TotalSanitaryValue @ 4.00% _ $ 184,96 $ 8,400,00 $ 46,200,00 Thus,CalHar- Private Sanitary 4,00% _ $ 1,848.00 Sanitary $ 6,400,00 Public Storrs 4,00% — $ Storm $ 172,892.00 Item Description Quaritity Unit $ 1,858.00 Unit Price Extended Cost 02530-01 54" Class lit, RCP Storm Drain 45.00 LF $ 265,00 $ 12,190.00 02630-02 48" Class III, RCP Storm Drain 494,00 LF $ 162.00 $ 80,028.00 02530-03 42" Class III, RCP Storm Drain 216,00 LF $ 141,00 S 30,456.00 02530-04 36" Class III, RCP Storm Drain 149.00 LF $ 108,00 $ 16,092.00 02530-07 18" Class III, RCP Storm Drain 116,00 LF $ 55,00 $ 6,380.00 02530-11 4'x4' Wye Inlet 1,00 Each $ 3,872,00 $ 3,872,00 02530-12 6'x 6' Junction Box 1.00 Each $ 6,886,00 S 6,886,00 02530-13 48" Headwall 1.00 Each $ 4,684.00 $ 4,684,00 02530-14 54" Headwall 2.00 Each $ 6,202.00 $ 12 404.00 SUB -TOTAL: Public Sanitary $ 172,892.00 CalHer- TotalStormValue $ 291,850.00 Thus,CalHar- Private Storm $ 118,958.00 SITE CONCRETE Public Paving Item No. Description Quanifi Unit Unit Price Extended Cost 02710-01 8" Reinforced Concrete Paving 678.00 SF $ 8.00 $ 4,624.00 at Freeport Pkwy. Approach SUB -TOTAL: PubllcPaving $ 4,624.00 TAS -Total Paving Value S 670,045.00 Thus, TAS - Private Paving $ 665,421.00 Public Sidewalks Item No. Description Quanitit Unit Unit Price Extended Cost 02720-01 4" Sidewalk 305.00 SF $ 4.80 $ 1,464.00 02720-02 ADA Ramps 2.00 Each $ 197.00 S 394.00 SUB -TOTAL: Public Sidewalks 6 1,858.00 TAS- Total Sidewalk Value S 32,985.00 Thus, TAS - Private Sidewalk S 31,127.00 INSPECTION FEES Public Paving $ 4,624,00 @ 4.00% _ $ 184,96 Water $ 46,200,00 @ 4,00% _ $ 1,848.00 Sanitary $ - 4,00% — $ Storm $ 172,892.00 4.00% _ $ 6,915,68 Sidewalks $ 1,858.00 @ 4,00% — $ 74.32 SUB -TOTAL: Public Inspection Fees $ 9,022.96 Private Paving S 665,421.00 2.009% > $ 13,308,42 Water $ 139,495.(I0 @ 2,00% _ $ 2,789,90 Sanitary $ 8,400.00 @ 2.00% _ $ 168,00 Storm $ 118,958,00 2,00% e S 2,379,16 Sidewalks S 31,127,00 A) 2.00% — $ 62254 SUB -TOTAL: Public Inspection Fees $ 19,268,02 TOTAL INSPECTION FEES S 29,290.99