Loading...
Prologis Park-PT161020T M 9 - C 1 T Y - O F COFFELL r v E n CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant (Casey Dillon Date Submitted 10/20/16 Address of Applicant 2501 N Harwood #2450 Street Dallas TX 75201 Phone Number 4692361434 Y Fax Number L Location of Construction (address, if available): park 121 - Sandy Lake & Freeport Subdivision Prologis Park 121 Section N � Block # [B_ — i! 1 R OR Survey/Abstract // Acreage Location description (attach vicinity Wrap): Northwest Drive 1. Type of proposed construction or development: C Residential C Alteration of a natural waterway drainage course Ce Non -Residential C' Other (describe & attach drawing or sketch) C Placement of Fill (in right-of-way or on private property) 2. Description of Construction Permit requested: 0 Paving E Median or Landscape ❑ Box Culvert E Sidewalk E Water Main ❑ Rip Rap Q Drive Approach 0 R.C.P. ❑ Fill Area ❑ Excavation 0 Sanitary Sewer Main Q Drainage Channel Excavation E Fire Lane ❑ Flume ❑ Slope Protection/Retaining Wall ❑ Bridge E Inlet ❑ Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4.Applicant shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5.A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $33, 484.80 Date Paid: NOTE: A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. ➢Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 ➢Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. unt113:30 p.m. ONLY unless otherwise approved by City Engineer. ➢A pre -construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. Printing your name indicates your acceptance of the terms and conditions of this form: Casey Dillon 4692361434 Signature of Applica Contact Number T i Signature of lns&6f Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? C` Yes C' No If YES, a Floodplain Development Permit is required before any construction can begin. Is additional information required? C' Yes C No Are other federal, state, or local permits required? C' Yes C' No C PERMIT APPLICATION APPROVED C PERMIT APPLICATION DENIED ity Approval" Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. C t T V,.=O F Page 3 COPPELL i A ) INSPECTION FEE CALCULATION SHEET Project Name Prologis Park 121 - Northwest Drive I Date 10/13/16 As per the City of Coppell Subdivision Regulations, the Developer shall pay 4% of the cost of the items to be permitted and inspected by the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineering Department, but not dedicated to the City such as parking lots, private utilities, private drainage systems and so forth. Inspection fees art due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following Improvements: Grand Total (total of 33,484.80 both colored fields) I Submit by li-mail I Print Form PUBLIC IMPROVEMENTS CONTRACTAMOUNT X�%_ PRIVATE IMPROVEMENTS CONTRACTAMOUNT o X2lu Paving 371,954.00 14,878.16 0.00 0.00 Water 132,628.00 5,305.12 0.00 0.00 Sanitary Sewer 120,934.00 4,837.36 0.00 0.00 Storm Sewer Alleys 128,108.00 5,124.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Sidewalks 83,496.00 3,339.84 Other Total 0.00 837,120.00 , 0.00 0.00 0.00 33,484.80 0.00 0,100 Grand Total (total of 33,484.80 both colored fields) I Submit by li-mail I Print Form Park 121 _ Northwest Drive S 371.054,00 9 4,00% IF Prologis Description Ouanlel Unit Unit Price Extended Cosl / Coppell, TIC 1,855,00 LF S 30.00 S 55,850.00 02520.02 (/vJ 30.00 LF S Cost of Public Work 640,00 02520-03 8'Cleanoul 5,00 SITE ununes 500.00 S 2,500,00 02520.04 Sid, 4' Diam, Manhole (8'-13' Deep) 0,00 MVCON Public Water 44,100,00 02520.05 Connecta to Existing Manhole (17' Deep) 1.00 Each S 3,500.00 S Item o Descdolion Ouen'liUn8 58.00 LF $ Unit Price Extended Cosl 02510.01 8" DR -14 Water 1,613,00 LF S 21,00 S 33,873.00 02510.02 Bu DR -14 Water (Fire Hydrant Lead) 45.00 LF S 19.00 S 855.00 02510-03 12" Gate Valve 1.00 Each S 2,650.00 S 2,650.00 02510-04 W Gale Valve 25.00 Each $ 1,700.00 S 42,500,00 02610-05 6"Gale VeNe 4.00 Each S 1,250.00 S 5,000.00 02510.06 12' Fillings 2.00 Each S 1,425.00 S 2,850.00 02510.07 8' Fillings 29,00 Each S 1,000.00 S 29,000.00 02510.06Standard Fire Hydrant wi Starz Adapter 4.00 Each S 3,050.00 S 12,200.00 02510.00 Barricades 1.00 LS S 1,000.00 S 1,000,00 0251 DA Connect to 8' Stuboul 1.00 Each $ 700.00 S 700,00 02510.11 Cut To. let. 12' Lina 1.00 Each S 2,000.00 5 2,000.00 SUB -TOTAL: Public Water S 132,628.00 Ce War- Total Water Value S 132,92e.00 Thus, CalHar"Private Water $ Public Sanitary S 371.054,00 9 4,00% lam No It.. No Description Ouanlel Unit Unit Price Extended Cosl 02520-01 8'SDR-28 1,855,00 LF S 30.00 S 55,850.00 02520.02 8'SDR-26 30.00 LF S 28.00 S 640,00 02520-03 8'Cleanoul 5,00 Each $ 500.00 S 2,500,00 02520.04 Sid, 4' Diam, Manhole (8'-13' Deep) 0,00 Each S 4,900,00 S 44,100,00 02520.05 Connecta to Existing Manhole (17' Deep) 1.00 Each S 3,500.00 S 3,500.00 02520.05 CSS Embedment 49 W41er line Crossinu 58.00 LF $ 163.00 $ 14344.00 02530-07 SUB -TOTAL: Public Sanitary 1,00 Each 5 120,934.00 Caesar- Total Sanitary Value 5 120,934.00 Thus, CalHar- Private Sanitary $ Public Storm S 371.054,00 9 4,00% lam No here No Description quartlill Unit Unit Price Extended Co. 02530-01 38' Class III, RCP Storm Drain 95,00 LF S 107.00 S 10,165,00 02530-02 24" Class III, RCP Storm Drain 204,00 LF $ 66,00 S 13,464,00 02530-03 18" Class III, RCP storm Drain 762,00 LF S 52,00 S 39,624.00 02530.04 36' HDPE (Temporary) 100.00 LF S 56.00 $ 5,60D.00 02530-05 36' Sloped Headwall 3.00 Each S 3,000,00 $ 9,800.00 02530-0616" Thick Rock Rip -Rap at Headwall 13.00 CY $ 135,00 $ 1,755.00 02530-07 IV Curb Inlet w7 Extenclon(7'Deep) 1,00 Each $ 4,000.00 $ 4,600,00 0253408 Precast 10' Curb Inlet (4' Deep) 6.00 Each $ 2,950,00 $ 17,700.00 02530.09 Precast 4'x4'Junction Box (W Deep) 1.00 Each $ 5,500.00 $ 5,500.00 0253410 Precast 4'x4' Drop Intel wl Apron (4' Deep) 2.00 Each S 4,150.00 $ 8,300.00 0253411 Barricades 1.00 LS $ 2,000.00 $ 2,000,00 0253412 Canned to Existing Inlet 1,00 Each S 1,000,00 S 1,000,00 02530-13 Remove Curb InlellReplace wl Type C 2 -Grate Inlet (7' Deep) 1.00 Each S 4,400.00 $ 4,400,00 02530.14 Remove/Replace TxDOT Pavement 200,00 SF S 15.00 S 3,000,00 0253415 Prep inial Protection a,06 Each $ 25000 S 200000 SUBTOTAL: Pubilc Sanitary S 120,108.00 CalHar - Total Blom Value $ 126,10&00 Thus, Ca1Har-Private Storm It SITE CONCRETE Public Paving Rem No, Descralion Quanill Unit Price Extended Cast 02710-01 10"-S,SOOpsI TkOOTTl,-In Paving la8.00 BY 5 127,61 5 24,110,00 02710-02 5'-4,O;It,' Conc T 5,44500 BY S 6367 $ 347836.00 SUB -TOTAL: Public Paving S 371,954.00 Pavecon- Total Paving Value S 371,954.00 Thus, Pavecon - Private Paving $ Public Sidewalks S 371.054,00 9 4,00% lam No Descriolion Out Unit Unit Price Extended Cue[ 02720-01 5'X4"- 3,000psi Conc. Sidewalk 2,507,00 LF $ 28,62 $ 73,468.00 02720-02 Banter Free Ramps (S' SWi 4.00 Each S 1,481.00 S 5,824.00 02720.03 Bnmer Free Ramps(10'WB) 2,00 Each S 2.052.00 S 4.104,00 jSidewalks SUB -TOTAL: Public Sidewalks $ $3,495.00 Pavecon-Total Sidewalk Value S 83,495.00 Thus, Pavecon -Private Sidewalk $ - INSPECTION FEES Public Paving S 371.054,00 9 4,00% 5 14,076.10 WaterS 132,828,00 @ 4.00% = S 5,305,12 SanBary S 120,034,00 4.00% . 3 4,837,36 Storm $ 128,108,00 Q 4.00% $ 5,124.32 Sidewalks jSidewalks 83.485.004,00% - $ $ 3.338.84- 3.330.84 SUBTOTAL: Public Inspection Fees $ 33,484.80 Private Paving S - @ 2,00% Water S - 2,00% _ S SanBary S - @ 2,D0% $ slarm S 2.00116 s Sidewalks Sidewalks S�200X, - S- S SUB -TOTAL- Public Inspection Fees $ _ TOTAL INSPECTION FEES S 73,484.80