Loading...
CRDC1401-CS161108T H E C I T Y O F COFFELL x A s i a 9 Chris Schmitt November 8, 2016 Teague, Nall & Perkins 17304 Preston Road Suite 1340 Dallas, Texas 75252 RE: CRDC 14-01 Denton Tap Sandy Lake Streetseape (Incurred Costs) Dear Mr. Schmitt: We are contacting you regarding the Denton Tap & Sandy Lake Streetscape project. Our records show an amount of $16,463.46 is owed due to errors in plan quantities on this project. Attached is the itemized invoice, please submit payment in person or by mail to 265 E. Parkway Blvd Coppell, TX 75019 at your earliest convenience. If you have any questions or comments pertaining to this invoice or payment please feel free to contact me via email or by phone. Sincerely, George Marshall Engineering Manager Office Phone: (972) 304-3562 cc: Ken Griffin, P.E., Director of Engineering and Public Works Kent Collins, P.E., Assistant Director of Engineering Jennifer Miller, Finance Director A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV Bill To: Chris Schmitt Teague Nall & Perkins 17304 Preston Road Ste.140 Dallas, Texas 75252 T H E C I T Y O F COPPELL DESCRIPTION CO3-1 Admin Fee for Reevaluation Incurred Costs - quanity Change Item 66 Incurred Costs - quanity Change Item 77 Incurred Costs - quanity Change Item 79 Incurred Costs - quanity Change Item 80 Incurred Costs - quanity Change Item 86 Make all checks payable to City of Coppell If you have any questions concerning this invoice, contact: George Marshall 972.304.3562 gmarshall@coppelltx.gov THANK YOU FOR YOUR BUSINESS! A FAMILY COMMUNITY FOR A LIFETIME AMOUNT $1,837.83 $4,200.00 $3,340.65 $2,964.72 $650.76 $3,469.50 TOTAL $ 16,463.46 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV CITY OF COPPELL CHANGE OR EXTRA WORK ORDER - PROJECT: Denton Tap / Sandy Lake Streetscape CRDC 14-01 CONTRACTOR: Pavecon OWNER: City of Coppell CHANGE ORDER NO.: 3 DATE: August 25, 2016 Item Description Quantity Unit Unit Price Total ADD: Remove and Properly Dispose of 3 Existing Concrete Pavement 26.66 SY $16.32 $435.09 Drive Approach and Reinforced 17 Parking Lot Concrete Pavement 35.4 SY $71.30 $2,524.02 Replacement 6" Reinforced Stamped Concrete 20 Pavement 26.66 SY $98.80 $2,634.01 Concrete Retaining Wall Integral with 21 Sidewalk 92 LF $200.50 $18,446.00 31 4" Schedule 40 PVC Conduit by Bore 40 LF $27.00 $1,080.00 Furnish/Install 12" Mow Band as 64 Shown 5 LF $14.49 $72.45 Furnish/Install Bomanite Integral 65 Color Conc. Flatwork as detailed in -46 SF $16.05 -$738.30 Tans 66 Furnish/Install Boulders as labeled 15 EA $161.00 $2,415.00 and detailed in plans 67 Furnish/Install Boulders as labeled in -195 EA $161.00 -$31,395.00 detailed in plans 68 Furnish/Install Decomposed Granite 6,266 SF $2.76 $17294.16 at 4" depth ' Furnish/Install Dry Creek Bed as 69 labeled and details 1,427 SF $42.73 $60,975.71 Furnish/Install Ameristar 5' Height 70 Ornamental Fence (8' Panels) as 13 LF $95.45 $1,240.85 detailed Furnish/Install (65 Gal) Chinquapin 73 Oak -3 EA $687.70 -$2,063.10 74 Furnish/Install (65 Gal) Cedar Elm 5 EA $667.00 $3,335.00 75 Furnish/Install (30 Gal) Texas Redbud 11 EA $411.70 $4,528.70 CITY OF COPPELL CHANGE OR EXTRA WORK ORDER Delete: 76 Furnish/Install (25 Gal) Red Rocket Crape Myrtle -15 EA $354.20 -$5,313.00 77 Furnish/Install (5 Gal) Dwarf Crape M rtle -169 EA $29.90 -$5,053.10 78 Furnish/Install 5 Gal) Dwarf Abelia -74 EA $29.90 -$2,212.60 79 Furnish/Install (5 Gal) Seep Muhly Grass -599 EA $28.75 -$17,221.25 80 Furnish/Install (5 Gal) Pink Flamingo Grass _ 187 EA $29.90 -$5,591.30 81 (3 Gal) Red Autumn Suarneish/Install _5 EA $29.90 -$149.50 82 Furnish/Install (3 Gal) Henry Duelberg Sage -184 EA $32.20 -$5,924.80 83 Furnish/Install (3 Gal) Red Yucca 45 EA $28.75 $1,293.75 84 Furnish/Install (3 Gal) Rosemary -78 EA $31.05 -$2,421.90 85 Furnish/Install (3 Gal) Soft Leaf Yucca -32 EA $28.75 -$920.00 86 Furnish/Install (1 Gal) Mexican Feather Grass -2,245 EA $9.78 -$21,956.10 87 Furnish/Install (1 Gal) Blackeyed Susan -401 EA $9.78 -$3,921.78 88 Furnish/Install Harwood Mulch at 3" Depth -9,149 SF $0.46 -$4,208.54 89 Furnish/Install Solid Sod Buffalograss as shown on plans 3,403 SF $0.58 $1,973.74 Water Meter relocations to median Al along Denton Tap Road Streetscape 1 EA $4,025.00 $4,025.00 (Ref. IR.35 Detail 1); CO3-1 Admin Fee for Reevaluation 1 LS $1,837.83 $1,837.83 CO3-2 Inured Costs - quanity Change Item 1 LS $4,200.00 $4,200.00 66 CO3-3 Incured Costs - quanity Change Item 1 LS $3,340.65 $3,340.65 77 CO3-4 Inc9 ured Costs - quanity Change Item I LS $2,964.72 $2,964.72 CO3-5 Inc0 ured Costs - quanity Change Item 1 LS $650.76 $650.76 CO3-6 In ured Costs - quanity Change Item 1 LS $3,469.50 $3,469.50 CO3-7 Brick Veneer for Retaining Walls 600 SF $28.40 $17,040.00 CO3-8 Hydro -excavation for Pole 4 EA $800.00 $3,200.00 Foundations Note Items CO3-1 through CO3-6 shall be charged back to the Engineer on the project: $16,463.46 Total Additions $49,886.67 Delete: CITY OF COPPELL CHANGE OR EXTRA WORK ORDER Total Deletions $0.00 Total Revision to Contract Amount: $49,886.67 Original contract amount $3,811,825.07 Net increase in contract amount $49,886.67 Previously approved changes $181,885.40 Revised contract amount $4,043,597.14 Cumulative increase in TOTAL change order amount (Percentage) Net increase in contract time of completion 6.1% A,G /SJA,YJ ()/tZ Revised Contract The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of this revision to the Contract.