Duke Lesley 2RC-CS161104
Halie Hernandez
From:Marcus Marion
Sent:Friday, November 04, 2016 9:43 AM
To:Halie Hernandez
Subject:Fwd: Four Points Hotel and Conference Center
Attachments:image001.png
Hey Ms Haley, Can we add this email to the conversation section of Laserfish?
Marcus Marion
MMarion@coppelltx.gov
469.576.7707
Begin forwarded message:
From:
Marcus Marion <MMarion@coppelltx.gov>
Date:
November 4, 2016 at 9:38:44 AM CDT
To:
Matthew Blaxton <matt@d-c-solutions.com>
Subject:Re: Four Points Hotel and Conference Center
Sorry for the late reply, I was off yesterday. Bonds are for the work done in The City ROW.
The asbuilts look good except for the 4" meter and vault on the westside of the property. It
needs to show 2-2"meters. That needs to be changed prior to me accepting them.
Marcus Marion
MMarion@coppelltx.gov
469.576.7707
On Nov 3, 2016, at 7:58 AM, Matthew Blaxton <matt@d-c-solutions.com> wrote:
Marcus,
Good morning.
1.
Bond - With respect to the paving bond I assume this is just for the approaches
within the right of way? Please confirm. I need to know what the description of
work in blanks of the example of the bond need to say to meet your
requirements. “…a written contract with the said _______ to build and
construct _______ which contract and the plans and specifications therein
mentioned, adopted by the _______ are hereby expressly made a part…”
2.
As-Built Drawings – Are you wanting just civils or the full set? Do you need a
hard copy full size or electronic set? If you are needing a full set electronic I have
provided a link below. If you need a hard set please let me know if you need
more than one copy and if you want a full set or just civils.
3.
Punch – the guys are working there tail ends off again this morning removing
final debris, hydrant got raised last night, cleaning, finishing striping on new
concrete, sealants, etc. and working to be ready mid-day today I understand
from being on site yesterday evening.
1
ShareFile Attachments
Expires December 3, 2016
4 Points As-Built Set
322.8 MB
Download Attachments
Matthew Blaxton uses ShareFile to share documents securely. Learn More.
Sincerely,
Matthew D. Blaxton
Design & Construction Solutions, LLC
office (817) 886-3454
cell (817) 797-1463
<image001.png>
From: Marcus Marion \[mailto:MMarion@coppelltx.gov\]
Sent: November 2, 2016 1:32 PM
To: Matthew Blaxton <matt@d-c-solutions.com>
Cc: Suhas Naik <suhas@savaone.com>; Michelle Rourke <michellerourke@d-c-
solutions.com>; Avnish Shah <avnish@savaone.com>; Ajay Kothari (ajay@savaone.com)
<ajay@savaone.com>
Subject: Re: Four Points Hotel and Conference Center
I'll need any punch list items complete. I'll need you pavement contractors bond.
I'll also need the as builds.
Marcus D. Marion
City of Coppell
(469)576-7707
mmarion@coppelltx.gov
On Nov 2, 2016, at 12:46 PM, Matthew Blaxton <matt@d-c-solutions.com>
wrote:
2
Marcus, reminder that I have not received the bond examples. But, if
you’ve already got the bond in place with KCK is there anything further
you’re needing?
Matt
From: Matthew Blaxton
Sent: November 1, 2016 7:32 AM
To: 'Marcus Marion' <MMarion@coppelltx.gov>
Cc: Suhas Naik <suhas@savaone.com>; Michelle Rourke
<michellerourke@d-c-solutions.com>; Avnish Shah
<avnish@savaone.com>; Ajay Kothari (ajay@savaone.com)
<ajay@savaone.com>
Subject: RE: Four Points Hotel and Conference Center
Marcus, good morning,
Can you please try to resend? The images/attachments didn’t come
through on my end.
Sincerely,
Matthew D. Blaxton
Design & Construction Solutions, LLC
office (817) 886-3454
cell (817) 797-1463
<image004.png>
From: Marcus Marion \[mailto:MMarion@coppelltx.gov\]
Sent: October 31, 2016 3:42 PM
To: Matthew Blaxton <matt@d-c-solutions.com>
Cc: Suhas Naik <suhas@savaone.com>; Michelle Rourke
<michellerourke@d-c-solutions.com>; Avnish Shah
<avnish@savaone.com>; Ajay Kothari (ajay@savaone.com)
<ajay@savaone.com>
Subject: Re: Four Points Hotel and Conference Center
3
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
4
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
These are the examples in our Pre-Con Package
Marcus D. Marion
City of Coppell
(469)576-7707
mmarion@coppelltx.gov
5
On Oct 31, 2016, at 3:12 PM, Matthew Blaxton <matt@d-c-
solutions.com> wrote:
Marcus, so has KCK taken care of this completely or is
there more requirements that we are required to satisfy
to this regard? Attached is the Pre-Construction
package we received and it did not include the example
or list this as a requirement that I see.
Thanks again for all your help.
Sincerely,
Matthew D. Blaxton
Design & Construction Solutions, LLC
office (817) 886-3454
cell (817) 797-1463
<image005.png>
From: Marcus Marion \[mailto:MMarion@coppelltx.gov\]
Sent: October 31, 2016 2:43 PM
To: Avnish Shah <avnish@savaone.com>
Cc: Matthew Blaxton <matt@d-c-solutions.com>; Suhas
Naik <suhas@savaone.com>; Michelle Rourke
<michellerourke@d-c-solutions.com>
Subject: Re: Four Points Hotel and Conference Center
We have an example of one in our Pre-
Construction Package. I have one from the utility
contractor already.
Marcus D. Marion
City of Coppell
(469)576-7707
mmarion@coppelltx.gov
On Oct 31, 2016, at 12:18 PM, Avnish Shah
<avnish@savaone.com> wrote:
Mr. Marion
Is there a specific
format/requirement for this
maintenance bond? Let me know so
6
I can provide the details to my
insurance company.
Thanks
Avnish Shah
Chief Financial Officer
<image001.jpg>
2311 Texas Drive, Ste 105
Irving, TX 75062
T. 972-255-9464
F. 972-255-9795
Email: avnish@savaone.com
From: Michelle Rourke
<michellerourke@d-c-
solutions.com>
Date: Wednesday, September 21,
2016 at 3:16 PM
To: "'Avnish Shah
(avnish@savaone.com)'"
<avnish@savaone.com>
Cc: Marcus Marion
<MMarion@coppelltx.gov>,
"Matthew D. Blaxton" <matt@d-c-
solutions.com>
Subject: Four Points Hotel and
Conference Center
Avnish,
I am getting all our files in
order in anticipation of Four
Points closing soon. Marcus
Marion, with the City of
Coppell will need the 2year
maintenance bond for the city
right of way. I am assuming
you would be the one to take
care of this.
I've copied Marcus in case
you have any questions. Let
me know if there is anything
I can do to assist.
Thank you,
Michelle Rourke
Design & Construction
Solutions, LLC
2250 Pool Road, Suite 202
Grapevine, Texas 76051
7
office (817) 886-3454
\[D&CS-final logo-image\]
<image001.jpg>
<2014-11-13 Pre-Const Mtg Notes and
Attendees.pdf>
<2014-11-13 Commerical Const Requirements.pdf>
<Attachments.html>