Loading...
Duke Lesley 2RC-CS161104 Halie Hernandez From:Marcus Marion Sent:Friday, November 04, 2016 9:43 AM To:Halie Hernandez Subject:Fwd: Four Points Hotel and Conference Center Attachments:image001.png Hey Ms Haley, Can we add this email to the conversation section of Laserfish? Marcus Marion MMarion@coppelltx.gov 469.576.7707 Begin forwarded message: From: Marcus Marion <MMarion@coppelltx.gov> Date: November 4, 2016 at 9:38:44 AM CDT To: Matthew Blaxton <matt@d-c-solutions.com> Subject:Re: Four Points Hotel and Conference Center Sorry for the late reply, I was off yesterday. Bonds are for the work done in The City ROW. The asbuilts look good except for the 4" meter and vault on the westside of the property. It needs to show 2-2"meters. That needs to be changed prior to me accepting them. Marcus Marion MMarion@coppelltx.gov 469.576.7707 On Nov 3, 2016, at 7:58 AM, Matthew Blaxton <matt@d-c-solutions.com> wrote: Marcus, Good morning. 1. Bond - With respect to the paving bond I assume this is just for the approaches within the right of way? Please confirm. I need to know what the description of work in blanks of the example of the bond need to say to meet your requirements. “…a written contract with the said _______ to build and construct _______ which contract and the plans and specifications therein mentioned, adopted by the _______ are hereby expressly made a part…” 2. As-Built Drawings – Are you wanting just civils or the full set? Do you need a hard copy full size or electronic set? If you are needing a full set electronic I have provided a link below. If you need a hard set please let me know if you need more than one copy and if you want a full set or just civils. 3. Punch – the guys are working there tail ends off again this morning removing final debris, hydrant got raised last night, cleaning, finishing striping on new concrete, sealants, etc. and working to be ready mid-day today I understand from being on site yesterday evening. 1 ShareFile Attachments Expires December 3, 2016 4 Points As-Built Set 322.8 MB Download Attachments Matthew Blaxton uses ShareFile to share documents securely. Learn More. Sincerely, Matthew D. Blaxton Design & Construction Solutions, LLC office (817) 886-3454 cell (817) 797-1463 <image001.png> From: Marcus Marion \[mailto:MMarion@coppelltx.gov\] Sent: November 2, 2016 1:32 PM To: Matthew Blaxton <matt@d-c-solutions.com> Cc: Suhas Naik <suhas@savaone.com>; Michelle Rourke <michellerourke@d-c- solutions.com>; Avnish Shah <avnish@savaone.com>; Ajay Kothari (ajay@savaone.com) <ajay@savaone.com> Subject: Re: Four Points Hotel and Conference Center I'll need any punch list items complete. I'll need you pavement contractors bond. I'll also need the as builds. Marcus D. Marion City of Coppell (469)576-7707 mmarion@coppelltx.gov On Nov 2, 2016, at 12:46 PM, Matthew Blaxton <matt@d-c-solutions.com> wrote: 2 Marcus, reminder that I have not received the bond examples. But, if you’ve already got the bond in place with KCK is there anything further you’re needing? Matt From: Matthew Blaxton Sent: November 1, 2016 7:32 AM To: 'Marcus Marion' <MMarion@coppelltx.gov> Cc: Suhas Naik <suhas@savaone.com>; Michelle Rourke <michellerourke@d-c-solutions.com>; Avnish Shah <avnish@savaone.com>; Ajay Kothari (ajay@savaone.com) <ajay@savaone.com> Subject: RE: Four Points Hotel and Conference Center Marcus, good morning, Can you please try to resend? The images/attachments didn’t come through on my end. Sincerely, Matthew D. Blaxton Design & Construction Solutions, LLC office (817) 886-3454 cell (817) 797-1463 <image004.png> From: Marcus Marion \[mailto:MMarion@coppelltx.gov\] Sent: October 31, 2016 3:42 PM To: Matthew Blaxton <matt@d-c-solutions.com> Cc: Suhas Naik <suhas@savaone.com>; Michelle Rourke <michellerourke@d-c-solutions.com>; Avnish Shah <avnish@savaone.com>; Ajay Kothari (ajay@savaone.com) <ajay@savaone.com> Subject: Re: Four Points Hotel and Conference Center 3 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. 4 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. These are the examples in our Pre-Con Package Marcus D. Marion City of Coppell (469)576-7707 mmarion@coppelltx.gov 5 On Oct 31, 2016, at 3:12 PM, Matthew Blaxton <matt@d-c- solutions.com> wrote: Marcus, so has KCK taken care of this completely or is there more requirements that we are required to satisfy to this regard? Attached is the Pre-Construction package we received and it did not include the example or list this as a requirement that I see. Thanks again for all your help. Sincerely, Matthew D. Blaxton Design & Construction Solutions, LLC office (817) 886-3454 cell (817) 797-1463 <image005.png> From: Marcus Marion \[mailto:MMarion@coppelltx.gov\] Sent: October 31, 2016 2:43 PM To: Avnish Shah <avnish@savaone.com> Cc: Matthew Blaxton <matt@d-c-solutions.com>; Suhas Naik <suhas@savaone.com>; Michelle Rourke <michellerourke@d-c-solutions.com> Subject: Re: Four Points Hotel and Conference Center We have an example of one in our Pre- Construction Package. I have one from the utility contractor already. Marcus D. Marion City of Coppell (469)576-7707 mmarion@coppelltx.gov On Oct 31, 2016, at 12:18 PM, Avnish Shah <avnish@savaone.com> wrote: Mr. Marion Is there a specific format/requirement for this maintenance bond? Let me know so 6 I can provide the details to my insurance company. Thanks Avnish Shah Chief Financial Officer <image001.jpg> 2311 Texas Drive, Ste 105 Irving, TX 75062 T. 972-255-9464 F. 972-255-9795 Email: avnish@savaone.com From: Michelle Rourke <michellerourke@d-c- solutions.com> Date: Wednesday, September 21, 2016 at 3:16 PM To: "'Avnish Shah (avnish@savaone.com)'" <avnish@savaone.com> Cc: Marcus Marion <MMarion@coppelltx.gov>, "Matthew D. Blaxton" <matt@d-c- solutions.com> Subject: Four Points Hotel and Conference Center Avnish, I am getting all our files in order in anticipation of Four Points closing soon. Marcus Marion, with the City of Coppell will need the 2year maintenance bond for the city right of way. I am assuming you would be the one to take care of this. I've copied Marcus in case you have any questions. Let me know if there is anything I can do to assist. Thank you, Michelle Rourke Design & Construction Solutions, LLC 2250 Pool Road, Suite 202 Grapevine, Texas 76051 7 office (817) 886-3454 \[D&CS-final logo-image\] <image001.jpg> <2014-11-13 Pre-Const Mtg Notes and Attendees.pdf> <2014-11-13 Commerical Const Requirements.pdf> <Attachments.html> 8