Freeport NIP(3)-LR 950817
reed engineering GEOTE~HNIC~/CONSULT~NT~ August 17, 1995 Project No. 2317.2 Report No. 4 M.E.P.C. American Properties, Inc. 15303 Dallas Parkway, Suite 100, LB-10 Dallas, Texas 75248 ATTN: Mr. Rob Ahmuty Re: Construction Materials Testing Craftmade Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities for the period of July 21 through August 12, 1995. Water pressure injection operations continued on July 21 and 24, 1995, and were observed full-time. Injections were performed to a depth of 10 feet below present grade and extended 5 feet beyond the building line. Upon completion of the second pass of water on the northern portion of the pad, the soil moisture was evaluated by drilling and sampling 11 core borings. Borings were drilled on July 26, 1995. Continuous three-inch diameter samples were obtained to a depth of 10 feet. All samples were evaluated for consistency by use of a pocket penetrometer. Pocket penetrometer test results are summarized on Plate 1. Based on the test results and full-time observation, additional injections were not considered necessary and the building pad was approved for placement of lime and recompaction. Periodic inspections were conducted during the lime spreading operations to verify placement of 22 pounds hydrated lime per square yard. During the period of July 21 through August 12, 1995, a total of 45 field density tests were taken on the lime'-treated building pad subgrade, utility trench backfill and paving subgrade. Test results are shown on Plates 2 through 4. Where tested, materials were.found to be in compliance with project specifications, except as noted. Where materials were not in compliance, the soils were reworked and retested. Test failures and retests are noted in lower and upper case letters, respectively. 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 2141350-5600 · (FAX) 214/35G-(X)19 M.E.P.C. American Properties, Inc. Project No. 2317.2/Report No. 4 Au~st 17, 1995 Page 2 Construction of piers was initiated on July .24, 1995. Pier construction was observed and the piers were found to be in compliance with project plans and specifications. Pier designations and depths are shown on Plates 5 through 9. Pier designations provided on the pier log were shown on Sheet No. S-1 of the project plans. Samples of the pier concrete were obtained on a daily basis. Compressive strength test results will be submitted under separate cover. If you have any questions, do not hesitate to call. Sincerely, REED GINEERING GROU INC. RFR/msm copies submitted: (1) M.E.P.C. American Properties, Inc./ Mr. Rob Ahmuty (1) Gromatzky Dupree and Associates/ Mr. Scott'McCrary ~(1) McFadden & Miller/Mr. Jon Jacobson (1) Eckland Consultants/Mr. Jerry Holstrom CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date Sampled 07 -26-95 Pocket Penetrometer Test Results Boring Depth (feet) W-14 W-15 W-16 W-17 W-18 0.0 - 1.5 1.5 - 3.0 3.0 - 4.5 4.5 - 6.0 6.0 - 7.5 7.5 - 9.0 9.0 - 10.0 1.8 3.1 2.6 4.4 1.9 2.3 3.6 3.5 2.2 1.9 2.0 3.1 1.9 1.6 1.7 1.8 1.9 1.9 1.5 2.1 2.4 1.8 2.6 1.9 2.3 2.3 2.2 4.3 2.3 2.7 3.7 3.2 3.9 2.8 2.9 Date Sampled 07-26-95 Boring Depth (feet) 0.0 - 1.5 1.5 - 3.0 3.0 - 4.5 4.5 - 6.0 6.0 - 7.5 7.5 - '9.0 9.0 - 10.0 W-19 W-20 W-21 W-22 W-23 3.3 2.5 1.7 2.0 2.2 2.7 3.2 3.6 3.0 2.1 1.8 1.7 2.5 1.6 2.8 2.5 2.4 1.4 1.6 2.2 2.0 2.2 2.5 2.2 2.6 3.5 2.9 3.6 3.6 2.8 3.7 3.3 2.9 3.6 2.8 Date Sampled 07-26-95 Boring Depth (feet) 0.0 - 1.5 1.5 - 3.0 3.0 - 4.5 4.5 - 6.0 6.0 - 7.5 7.5 - 9.0 9.0 - 10.0 W-24 3.2 3.0 2.2 2.0 2.1 2.3 2.3 GEOTECHNICAL CONSULTANTS . PLATE I ~ engineeri .rig CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 07-21-95 07-29-95 08-04-95 08-05-95 08-07-95 Test No. Location 177 Line A-l/ STA 0+50 178 Line A-l/ STA 1+75 179 Line A-i/ STA 2+50 180 Line A-l/ STA 3+00 181 Lat. A-2/ 182 183 184 185 186 187 188 189 190 191 192 Field 193 194 195 196 197 198 199 200 201 202 203 N. side of inlet 460'N, 60'W(1) 520'N, 60'W(1) 480'N, 120'W(1) 520'N, 120'W(1) 520'N, 210'W(1) 480'N, 210'W(1) 520'N, 310'W(1) 480'N, 320'W(1) Line B/ STA 0+15 Line B/ STA 0+40 Line B/ STA 1+40 200' S, 50'E(2) 200' S, 150'E (2) 200'S,250'E(2) 200'S, 350'E(2) 280'S, 350'E (2) 280'S,250'E(2) 280'S, 150'E(2) 280' S, 50'E (2) 50'S, 50'W(3) 75'S, 100'W(3) 100' S, 125'W(3) Density Tests Depth Below Unit Final Dry S.G. Weight (feet) (pcf) Com- pac- Moisture tion Content Curve Level (%) No, (%) 1.5 89.4 27.0 1 96.3 1.0 90.9 26.7 1 98.0 1.0 88.9 26.8 1 95.8 0.5 89.7 25.6 1 96.7 2.0 91.0 23.6 1 98.1 0.0 89.8 26.7 3 95.7 0.0 89.3 28.6 3 95.2 0.0 89.1 30.0 3 95.0 0.0 89.3 29.9 3 95.2 0.0 89.7 29.9 3 95.6 0.0 91.5 27.3 3 97.5 0.0 92.5 27.0 3 98.6 0.0 89.1 29.7 3 95.0 12.0 91.3 27.1 1 98.4 11.0 90.2 24.5 1 97.2 10.0 91.4 26.3 1 98.5 0.0 94.8 26.1 3 101.1 0.0 89.9 29.7 3 95.8 0.0 93.1 26.2 3 99.3 0.0 91.6 29.8 3 97.7 0.0 92.1 30.3 3 98.2 0.0 89.8 28.3 3 95.7 0.0 91.1 27.8 3 97.1 0.0 89.1 32.2 3 95.0 0.0 87.7 29.5 3 93.5 0.0 87.8 31.0 3 93.6 0.0 88.8 30.0 3 94.7 GEOTECHNICAL CONSULTANTS · PLATE 2 CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 08-07-95 08-08-95 08-09-95 08-10-95 08-12-95 Test No. 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 Field Density Tests (Continued) Location Depth Below Unit Final Dry S.G. Weight (feet) (PCf) Line B/ STA 1+30 8.0 Line B/ STA 1+55 9.0 90'S,150'E(4,5) 0.0 90'S,200'E(4,5) 0.0 8" Water line/ 10'S,200'W(1,6) 2.0 Line B/ STA 1+80 5.0 Line B/ STA 0+60 4.0 350'S, 25'E(2,7) 2.0 400'S, 10'E(2,7) 3.5 10'S, 30'W(1,6) 1.0 10'N, 35'E(1,6) 1.0 350'S, 25'E(2,7) 2.0 400'S, 10'E(2,7) 3.5 Line B/ STA 2+60 5.5 Line B/ STA 3+00 6.0 160'S, 20'E(2,7) 2.5 275'S, 20'E(2,7) 1.5 15'S, 20'E(2,7) 2.5 Moisture Content (%) Com- pac- tion Curve Level No. (%) 92.4 25.6 1 99.6 92.8 25.9 I 10.0 89.9 26.8 1 96.9 90.9 28.6 1 98.0 88.2 29.9 1 95.0 95.6 24.0 1/2 95.0 97.2 78 0 76 7 93 0 88 3 91 7 85 9 23.8 34.5 35.2 27.1 28.1 26.7 29.5 24.6 28.0 24.2 25.1 24.9 92.9 94.0 89.6 91.2 88.9 1/2 96.6 1 87.0a 1 82.7b 1 100.2 1 95.2 1 99.8A 1 92.6B 1 100.1 I 101.3 I 96.6 1 98.3 1 95.8 GEOTECHNICAL CONSULTANTS ' PLATE 3 reed engineeri .rig CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Field Density Tests (Continued) Footnotes: (~) (2) (3) (4) (5) (6) (7) Measurements referenced from S.E. corner of building pad. Measurements referenced from N.W. corner of building pad. Measurements referenced from N.E. corner of building pad. Measurements referenced from S.W. corner of building pad. Test performed on paving subgrade. Test performed on 8" water line backfill. Test performed on interior plumbing backfill. Notes: Test areas that were not in compliance with project specifications are indicated by a lower case letter. Passing retests are designated by the corresponding upper case letter. GEOTECHNICAL CONSULTANTS · PLATE 4 '"~ ""~ reed engineerin, g CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 07-24-95 07-25-95 Pier No. Pier Summary Depth Final Pier Bell Before Pier Diameter Size B~ll Depth (in.) (in.) (ft.) (ft.) A.5-1.5 18 48 15.6 15.7 A.5-2 18 48 15.5 15.7 A.5-2.5 18 48 15.4 15.6 A.5-3 18 48 15.4 15.5 A.5-3.5 18 48 15.7 15.7 A.5-3.7 18 48 15.3 15.7' B-1.5 18 48 15.3 15.5 B-2.5 18 48 16.6 16.3 B-4 18 48 15.3 15.4 B-5 18 48 15.5 16.0 B-6 18 48 15.2 15.2 B-7 18 48 15.7 15.9 B-8 18 48 14.9 15.3 B-9 18 48 15.1 15.4 B-10 18 48 15.0 15.1 B-3.5 18 48 15.8 16.2 B-II 18 48 15.4 15.5 B-12 18 48 15.0 15.1 A.5-3.7' 18 48 17.4 17.9 B-2 24 60 16.2 16.2 B-3 24 60 15.2 15.2 C-2 24 60 14.9 14.9 C-3 24 60 15.2 15.2 K-2 18 48 15.0 15.3 K-3 18 48 14.0 14.3 K-4 18 48 14.7 14.9 K-5 18 48 14.7 15.2 K-6 18 48 15.0 15.2 K-7 18 48 14.8 14.9 K-8 18 48 14.7 15.2 K-9 18 48 15.0 15.7 K-10 18 48 14.9 15.1 K-ii 18 48 15.2 15.5 K-12 18 48 15.5 15.8 J-12 18 48 14.9 15.0 J-11 18 48 14.8 15.0 GEOTECHNICAL CONSULTANTS , · PLATE 5 reed enginee~i .ng CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 07-26-95 07-27-95 Pier No. Pier $~----ry (Continued) Pier Bell Diameter Size (in. ) (in. J-10 18 48 J-9 18 48 J-8 18 48 J-7 18 48 J-6 18 48 J-5 18 48 J-4 18 48 J-3 18 48 J-2 18 48 H-2 18 48 H-3 18 48 H-4 18 48 H-5 18 48 H-7 18 48 H-8 18 48 H-9 18 48 H-10 18 48 H-II 18 48 G-12 24 60 H-12 24 60 H-6 24 60 G-6 24 60 C-II 18 48 C-10 18 48 C-9 18 48 C-8 18 48 C-7 18 48 C-5 18 48 C-4 18 48 C-3.5 18 48 C-2.5 18 48 B.5-1.5 18 48 B.5-2 18 48 B.5-2.5 18 48 B.5-3 18 48 B.5-3.5 18 48 Depth Before Bell (ft.) 15.0 15.2 15.0 15.0 15.2 15.0 15.0 15.1 15.1 15.0 15.1 14.7 15.1 15.1 15.0 15.0 15.0 14.8 16.0 15.1 15.4 15.1 15.1 15.3 14.9 15.0 15.3 15.2 15.1 15.2 15.1 15.2 15.3 15.2 15.2 15.2 Final Pier Depth (ft.) 15.4 15.2 15.1 15.2 15.2 15.3 15.2 15.3 15:1 15.1 15.1 15.0 15.2 15.5 15.0 15.0 15.2 15.0 16.0 15.1 15.4 15.1 15.1 15.3 14.9 15.0 15.3 15.2 15.2 15.2 15.2 15.4 15.3 15.3 15.3 15.3 GEOTECHNICAL CONSULTANTS PLATE 6 CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 07-27-95 07-28-95 Pier No. C-1.5 C.5-1.5 C.5-2 C.5-2.5 C.5-3 C.5-3.5 D-6 C-6 C-12 D-12 D-11 D-10 D-9 D-8 D-7 D-5 D-4 D-3 D-2 E-2 E-3 E-4 E-5 E-6 E-7 E-8 E-9 E-10 E-11 E-12 F-12 F-ii F-10 F-9 F-8 F-7 Pier Summary (Continued) Pier Diameter (in.) 18 18 18 18 18 18 24 24 24 24 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 Bell Size (in.) 48 48 48 48 48 48 60 60 60 60 48 48 48 48 48 48 48 48 48 48 48 48 .48 48 48 48 48 48 48 48 48 48 48 48 48 48 Depth Before Bell (ft.) 15.4 15.1 15.0 17.9 15.2 15.5 15.7 15.4 15.4 15.4 15.5 15.6 15.3 15.2 15.1 15.0 15.2 15.3 15.3 15.0 15.2 15.4 15.5 15.2 15.2 15.3 15.0 15.3 15.5 15.3 15.3 15.1 15.2 14.7 14.7 15.4 Final Pier Depth (ft,) 15.4 15.1 15.1 17.9 15.3 15.5 15.9 15.5 15.6 15.5 15.5 15.6 15.5 15.3 15.2 15.1 15.2 15.3 15.3 15.0 15.2 15.4 15.6 15.3 15.2 15.4 15.1 15.4 15.5 15.3 15.3 15.2 15.3 14.8 14.9 15.7 GEOTECHNICAL CONSULTANTS , PLATE 7 CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 07-28-95 08-04-95 08-07-95 08-08-95 Pier No. Pier Summary (Continued) Pier Bell Diameter Size (in.) (in, F-6 18 48 F-5 18 48 F-2 18 48 G-2 18 48 G-3 18 48 A.4-2.1 18 36 A.4-2.3 18 36 A.6-2.1 18 36 A.6-2.3 18 36 C.7-2.5 18 48 C.7-3 18 48 G-4 18 48 G-5 18 48 G-7 18 48 G-8 18 48 G-9 18 48 G-10 18 48 G-ii 18 48 K-12 18 48 J-12 18 48 H-12 18 48 G-12 18 48 F-12 18 48 E-12 18 48 D-12 18 48 C-12 18 48 B-12 18 48 F-4 24 60 F-3 24 60 L-1 24 60 K.5-1 24 60 K-1 24 60 J.5-1 24 60 J-1 24 60 H.5-1 24 60 H-1 24 60 Depth Before Bell (ft.) 15.3 14.8 15.2 15.7 14.9 14.8 14.7 14.8 15.0 15.0 14.5 14.9 14.7 14.2 13.8 14.3 14.8 14.3 15.0 15.1 16.3 16.4 15 .1 15.0 15.0 15.7 15.3 14.5 15.2 14.8 13.4 13.9 14.0 13.8 14.1 14.2 Final Pier Depth (ft.) 15.5 15.0 15.4 15.7 15.2 14.8 15.0 15.1 15.0 15.0 14.9 14.8 14.8 14.4 13.8 14.5 14.9 14.5 15.0 15.1 16.4 16.5 15 .1 15.1 15.0 15.7 15.3 14.6 15.1 15.0 13.5 13.8 14.0 13.8 14.3 14.2 GEOTECHNICAL CONSUL'~e, NTS , PLATE 8 CRAFTMADE COPPELL, TEXAS REPORT NO. 4 Date 08-08-95 Pier S%umnary (Continued) Depth Final Pier Bell Before Pier Pier Diameter Size Bell Depth No. (in.) (in.) (ft.) (ft.) G.5-1 24 60 14.3 14.3 G-1 24 60 14.0 14.0 F.5-1 24 60 15.0 15.0 F-1 24 60 14.7 14.7 E.5-1 24 60 14.1 14.4 * Pier was improperly laid out. 1995. Redrilled on July 25, Ail measurements referenced from drilling grade. GEOTECHNICAL CONSULTAN~ . PLATE 9