Loading...
Duke Lesley 2RC -CS161107 MEMORANDUM TO: Marcus Marion, Engineering FROM: Dan Dimafelix, Wastewater DATE: November 7, 2016 REF: Sheraton - Wastewater Punch List 1.Three rain pans need to be stainless. 2.Raise manhole to grade. 3.Paint MH in green on curb for manholes. 4.Seal the crack inside the manhole.