Duke Lesley 2RC -CS161107
MEMORANDUM
TO: Marcus Marion, Engineering
FROM: Dan Dimafelix, Wastewater
DATE: November 7, 2016
REF: Sheraton - Wastewater Punch List
1.Three rain pans need to be stainless.
2.Raise manhole to grade.
3.Paint MH in green on curb for manholes.
4.Seal the crack inside the manhole.