ATTN: Mr. John Fisher
Re:
Construction Materials Testing
Proposed Four Seasons Distribution Center
Sandy Lake Road and Royal Lane
Coppell, Texas
Gentlemen:
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses activities for the period of December 13, through 16, 1991.
During the period of December 13, through 16, a total of 16 field
density tests were taken on the imported "select" fill placed within
the panel leaveout areas. Test results are shown on Plate 1. Where
tested, the fill was found to be in compliance with project
specifications.
If any questions arise, do not hesitate to call.
Sincerely,
Ronald F. Reed, P.E.
GROUP
BES/RFR/kea
copies submitted:
(1) NATCON, Inc./Mr. John Fisher
(1) Bradford Companies/Mr. Subash Gaitonde
(1) Brockette'Davis'Drake, Inc./Mr. Gary McHale
(1) WSI Architects/Mr. Ray Garrison
(1) Slider & Associates/Mr. Tim Slider
(1) City of Coppell Building Inspection
Department/Mr. Travis Crump
2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019
reed engineering-
PROPOSED FOUR 8EABON8 DISTRIBUTION CENTER
8ANDY LAKE ROAD AND ROYAL LANE
COPPELL, TEXAS
REPORT NO. 8
Date
12-13-91
12-16-91
Test
No.
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
Field Density Tests
Location
Depth Com-
Below Unit pac-
Final Dry Moisture tion
S.G. Weight Content Curve Level
(feet) (Dcf) (%) No. (%)
50'S, 2'E(1) 0.0 108.2 19.0 4 97.7
200'S, 2'E(1) 0.0 108.8 18.7 4 98.2
300'S, 2'E(1) 0.0 106.8 19.5 4 96.5
130'S, 2'E(1) 0.0 107.9 19.4 4 97.5
55'S, 2'W(2) 0.0 107.0 19.9 4 96.7
150'S, 2'W(2) 0.0 108.3 19.5 4 97.8
250'S, 2'W(2) 0.0 114.5 15.7 3 97.9
345'S, 2'W(2) 0.0 113.2 16.0 3 96.8
2'N, 50'W(3) 0.6 108.7 18.9 4 98.2
2'N,150'W(3) 2.0 109.7 18.8 4 99.1
2'S,385'W(2) 0.0 108.5 19.2 4 98.0
2'S,295'W(2) 0.0 108.8 19.1 4 98.3
2'S,200'W(2) 0.0 108.7 20.3 4 98.2
2'S, 95'W(2) 0.0 109.3 19.8 4 98.7
i'N, 60'W(3) 0.0 111.5 19.8 3 98.4
l'N,150'W(3) 0.0 106.5 20.5 4 96.2
Footnotes:
(1) Measurements referenced from N.W. building
corner.
(2) Measurements referenced from N.E. building
corner.
(3) Measurements referenced from S.E. building
corner.
PI ate 1