Loading...
Four Seasons 1-LR 920115Engineering engineering GEOTECHNICAL CONSULTANTS January 15, 1992 Project No. 556.2/Report No. 8 NATCON, Inc. 2777 Stemmons Freeway, Suite 353 Dallas, Texas 75207 ATTN: Mr. John Fisher Re: Construction Materials Testing Proposed Four Seasons Distribution Center Sandy Lake Road and Royal Lane Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities for the period of December 13, through 16, 1991. During the period of December 13, through 16, a total of 16 field density tests were taken on the imported "select" fill placed within the panel leaveout areas. Test results are shown on Plate 1. Where tested, the fill was found to be in compliance with project specifications. If any questions arise, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. GROUP BES/RFR/kea copies submitted: (1) NATCON, Inc./Mr. John Fisher (1) Bradford Companies/Mr. Subash Gaitonde (1) Brockette'Davis'Drake, Inc./Mr. Gary McHale (1) WSI Architects/Mr. Ray Garrison (1) Slider & Associates/Mr. Tim Slider (1) City of Coppell Building Inspection Department/Mr. Travis Crump 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 reed engineering- PROPOSED FOUR 8EABON8 DISTRIBUTION CENTER 8ANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO. 8 Date 12-13-91 12-16-91 Test No. 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 Field Density Tests Location Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (Dcf) (%) No. (%) 50'S, 2'E(1) 0.0 108.2 19.0 4 97.7 200'S, 2'E(1) 0.0 108.8 18.7 4 98.2 300'S, 2'E(1) 0.0 106.8 19.5 4 96.5 130'S, 2'E(1) 0.0 107.9 19.4 4 97.5 55'S, 2'W(2) 0.0 107.0 19.9 4 96.7 150'S, 2'W(2) 0.0 108.3 19.5 4 97.8 250'S, 2'W(2) 0.0 114.5 15.7 3 97.9 345'S, 2'W(2) 0.0 113.2 16.0 3 96.8 2'N, 50'W(3) 0.6 108.7 18.9 4 98.2 2'N,150'W(3) 2.0 109.7 18.8 4 99.1 2'S,385'W(2) 0.0 108.5 19.2 4 98.0 2'S,295'W(2) 0.0 108.8 19.1 4 98.3 2'S,200'W(2) 0.0 108.7 20.3 4 98.2 2'S, 95'W(2) 0.0 109.3 19.8 4 98.7 i'N, 60'W(3) 0.0 111.5 19.8 3 98.4 l'N,150'W(3) 0.0 106.5 20.5 4 96.2 Footnotes: (1) Measurements referenced from N.W. building corner. (2) Measurements referenced from N.E. building corner. (3) Measurements referenced from S.E. building corner. PI ate 1 GEOTECHNICAL CONSULTANTS --