Four Seasons 1-LR 920112reed engineering__ PROPOSED FOUR BEASONS DISTRIBUTION CENTER 8i%NDY LAKE ROAD J%ND ROYAL LANE COPPELL, TEXAS REPORT NO, 7 .Date 11-06-91 11-08-91 11-11-91 11-12-91 Test No, 134 135 136 137 138 139 140 141 142 Field Density Tests Location Depth C0m- Below Unit pac- Final Dry Moisture tion $. G. Weight Content Curve Level [feet) CDcf) (%~ No. (%) 97'N, 20'E(1) 0.0 80'N, 15'E(1) 0.0 70'N, 70'E(1) 0.0 170'N,250'E(1) 0.0 185'N,170'E(1) 0.0 185'N,170'E(1) 0.0 170'N,250'E(1) 0.0 170'N,250'E(1) 0.0 170'N,250'E(1) 0.0 110.8 16.2 4 100.1 104.6 17.9 4 95.1 108.1 18.2 4 97.7 98.6 25.3 4 89.1a 104.3 18.2 4 94.2b 105.0 18.6 4 95.0B 99.8 23.4 4 90.2a 100.8 21.6 4 91.la 105.9 19.7 4 95.7A Footnotes: (1) Measurements referenced from S.W. building corner. Note: Materials were found to be in compliance with project specifications, except as noted. Where materials were not in compliance, the soil was reworked and retested. Test failures and retests are noted in lower and upper case letters, respectively. P1 ate 1 GEOTECHNICAL CONSULTANTS reed engineering__ PROPOSED FOUR BF~8ON8 DISTRIBUTION CENTER BANDY LAKE ROAD AND ROYAL LANE COPPELLv TEXA~ REPORT NO. 7 Date 11-07-91 11-08-91 Summary of Drilled Piers Pier Depth Depth Pier Pier Bell To Bearing After Designa- Diameter Diameter Strata Belling tion ~inches) (inches) (feet) (feet) J.5-8 24 66 16.5 16.9 J -8 24 66 18.0 18.0 H.5-8 24 66 18.0 18.0 G.5-8 24 66 17.7 18.0 F.5-8 24 66 18.7 18.7 A -8 18 54 16.8 16.9 A -2.6 18 54 14.3 14.3 A -2.2 24 60 15.4 15.4 A -1.6 18 54 14.0 14.0 A -1.3 18 42 14.3 14.3 A -1 18 54 15.4 15.4 A.7-1 24 60 15.2 15.2 * 1 24 36 12.6 12.6 2 24 36 13.5 13.5 3 24 36 13.5 13.5 4 24 36 14.1 14.1 * Pier Numbers 1 through 4 are for the screen wall and are numbered 1 through 4, north to south, respectively. P1 ate 2 GEOTECHNICAL CONSULTANTS