Freeport NIP(3)-LR 950630June 30, 1995 Project No. 2317.2 Report No. 2 reed engineering GEOTECHNICAL CONSULTANTS M.E.P.C. American Properties, Inc. 15303 Dallas Parkway, Suite 100, LB-10 Dallas, Texas 75248 ATTN: Mr. Rob Ahmuty Re: Construction Materials Testing M.E.P.C. - Royal Lane Specialty Building Royal Lane at Creekview Drive Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities of June 14 and 15, 1995. On the above referenced dates, nine field density tests were taken on the paving subgrade and on-site fill placed within the building pad. Test results are shown on Plate 1. Where tested, materials were found to be in compliance with project specifications. If you have any questiohs, do not hesitate to call. Sincerely, REED ENGINEERING GR~gl~ INC. Ronald F. Reed, P.E. RFR/msm copies submitted: (1) M.E.P.C. American Properties, Inc./ Mr. Rob Ahmuty (1) Meinhardt & Quintana/Mr. David Meinhardt Al) McFadden & Miller/Mr. Jon Jacobson 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · {FAX) 214/350-0019 * ~ '~ reed engi,neeri _rig Test Date No. 06-14-95 134 135 136 137 06-15-95 138 139 140 141 142 Footnotes: M.E.P.C. - ROYAL LANE SPECIALITY BUILDING ROYAL LANE AT CREE~I~ DRIVE COPPELL, TEXAS REPORT NO. 2 Field Density Tests Location Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (pcf) (%) No. (%) 50'S, 50'W(1) 1.5 90.9 28.6 1 98.0 60'S, 50'W (1) 1.5 90.1 28.2 1 97.1 60'S, 250'W(1) 1.5 92.4 27.9 1 99.6 50'S, 350'W(1) 1.0 88.3 28.5 1 95.2 20'N, 380'E(2) 0.4 87.9 29.1 1 94.7 70'N, 380'E(2) 0.4 86.7 29.8 1 93.4 90'S, 380'E(2) 0.4 88.6 28.1 1 95.5 150'N, 380'E(2) 0.5 87.4 29.3 1 94.2 175'N,380'E(2) 0.5 87.9 29.8 1 94.7 (1) (2) Measurements referenced from S.E. proposed building. Measurements referenced from S.W. proposed building. corner of corner of GEOTECHNICAL CONSULTAN~ , PLATE !