Four Seasons 1-LR 911130lilY: I reed engineering .- GEOTECHNICAL CONSULTAN'T ~ November 30, 1991 Project No. 556.2 Report No. 6 NATCON, Inc. 2777 Stemmons Freeway, Suite 353 Dallas, Texas 75207 ATTN: Mr. John Fisher Re: Construction Materials Testing Proposed Four Seasons Distribution Center Sandy Lake Road and Royal Lane Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities for the period of September 23 through October 25, 1991. On October 2 and 10, 1991, two samples of the select fill material were obtained and returned to the laboratory for development of optimum moisture-density relationships (Standard Proctor Curves). Test results of the Atterberg Limit test are shown on the moisture- density curve, Plates 1 and 2, Curve Nos. 4 and 5. During the period of September 23 through October 18, 1991, a total of 93 field density tests were taken on the subgrade and natural fill. Test results are shown on Plates 3 through 6. Materials were found to be in compliance with project specifications, except as. noted. Where materials were not in compliance, the soils were reworked and retested. Test failures and retests are noted in lower and upper case letters, respectively. Construction of piers was initiated on October 16, 1991. Pier construction was observed and the piers were found to be in compliance with project plans and specifications. Pier depths are summarized on Plates 7 through 10. Pier designations provided on the pier log were shown on Sheet No. S1.2/S1.1 of the project plans. Tests of the pier concrete were obtained on a daily basis. Compressive strength test results will be submitted under separate cover. 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-001~ NATCON, Inc. Project No. 556.2/Report No. 6 November 30, 1991 Page 2 If any questions arise, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. BES/RFR/aap copies submitted: GROUP (1) NATCON, Inc./Mr. John Fisher (1) Bradford Companies/Mr. Subash Gaitonde (1) Brockette'Davis'Drake, Inc./Mr. Gary McHale (1) WSI Architects/Mr. Ray Garrison (1) Slider & Associates/Mr. Tim Slider ~) city of Coppell Building Inspection Department/Mr. Travis Crump -- REED ENGINNERING GROUP 112 110 108 106 11 13 15 17 19 Moisture Content (%) Standard Proctor Compaction Test No. 25 blows per each of'3 layers, with and ! ? inch drop using 4 _ inch diameter mold Test performed on minus #4 Sieve size material Boring No. -- Location Four Seasons Distributon 5.5pound hammer Center Depth - Sample No. Classification L i g h t Sandy Lake Road and Royal Lane, Coppell, Texas brown clayey sand with sandstone fragments 22 % Maximum Unit 110.7 14 % Dry Weight 8 Optimum Moisture Content 15.4 Liquid Limit Plastic Limit Plasticity Index pcf OPTIMUM MOISTURE DENSITY CURVE GEOTECHNICAL CONSULTANTS Plate I -- REED ENGINNERING GROUP 108 106 104 102 100 11 13 15 17 19 21 23 Moisture Content (%) 5 Standard Proctor Compaction Test No. 25 blows per each of' 3 layers, withS, 5 pound hammer and 12 inch drop using 4 inch diameter mold Test performed on minus #4 Sieve size material Boring No. -- Location Four Seasons Distribution Center Sandy Lake Road and Royal Lane, Coppell, Texas Depth - Sample No._ Classification Light brown silty clayey sand with sandstone fragments Liquid Limit 26 % Maximum Unit Plastic Limit 15 % Dry Weight 107.5 Plasticity Index 11 Optimum Moisture Content 17.3 pcf % OPTIMUM MOISTURE DENSITY CURVE Plate 2 GEOTECHNICAL CONSULTANTS -- reed engineering PROPOSED FOUR SF~SONS DISTRIBUTION CENTER SANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO. 6 Date 09-23-91 09-26-91 10-01-91 10-02-91 10-03-91 Test No. 41 42 43 44 45 46 47 48 49 5O 51 52 53 54 55 56 57 58 59 60 61 62 Field Density Tests Location Depth Below Unit Final Dry Moisture S.G. Weight Content Curve (feet) [pcf) (%) No. 65'N,130'E(1) 0.0 98.7 22.4 2 65'N,230'E(1) 0.0 100.1 21.8 2 65'N,330'E(1) 0.0 98.6 22.6 2 25'N, 75'W(3) 0.0 98.9 17.9 2 25'N,150'W(3) 0.0 99.0 18.5 2 STA 6+80, 30" Storm Drain 0.0 99.7 16.5 2 STA 7+40, 30" Storm Drain 0.0 98.6 17.2 2 48" Storm Sewer Inlet ~1 0.0 103.7 16.0 1 48" Storm Sewer Inlet ~2 0.0 104.3 18.5 1 75'S, 80'E. South Side Pavement Area (4) 0.0 100.1 21.3 2 50'S,125'W South side Pavement Area (2) 0.0 103.4 17.8 2 50'S, 75'W South Side Pavement Area (2) 0.0 103.8 17.1 2 25'N, 25'E(4) 0.0 108.5 17.4 1 25'N,125'E(4) 0.0 104.3 19.7 1 25'N,225'E(4) 0.0 103.9 19.7 1 25'N,325'E(4) 0.0 105.7 20.9 1 25'N,425'E(4) 0.0 97.1 25.0 2 75'N,425'E(4) 0.0 95.7 21.8 2 75'N,225'E(4) 0.0 99.4 24.3 2 75'N,125'E(4) 0.0 100.2 24.2 2 75'N, 25'E(4) 0.0 105.2 19.5 1 125'N, 25'E(4) 0.0 97.6 23.7 2 Com- pac- tion Level 95.1 96.4 95.0 95.3 95.4 95.5 95.0 98.3 98.8 96.4 99.6 100.0 102.7 98.7 98.4 100.0 93.5 92.2 95.7 96.5 99.9 94.0 GEOTECHNtCAL CONSULTANTS Plate 3 reed engineering PROPOSED FOUR SEASONS DISTRIBUTION CENTER SANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO. 6 (Continued) Date 10-03-91 10-03-91 10-08-91 10-09-91 Test No. 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 8O 81 82 83 84 85 86 87 88 89 90 91 Field Location Density Tests Depth Below Unit Final Dry Moisture S.G. Weight Content Curve (feet) (pcf) (%) No. 125'N,125'E(4) 125'N,225'E(4) 125'N,325'E(4) 125'N,425'E(4) 175'N,425'E(4) 175'N,325'E(4) 175'N,125'E(4) 225'N,125'E(4) 225'N,325'E(4) 225'N,425'E(4) 275'N,425'E(4) 275'N,325'E(4) 275'N,225'E(4) 275'N,125'E(4)~ 325'N,125'E(4) 325'N,325'E(4) 325'N,425'E(4) 75'N,425'E(4) 175'N,325'E(4) 275'N,425'E(4) 75'N, 60'W Front Parking (4) 25'N, 60'W Front Parking (4) 175'N, 25'E(4) 225'N, 25'E(4) 275'N, 25'E(4) 325'N, 25'E(4) 175'N,225'E(4) 225'N,225'E(4) 325'N,225'E(4) 0.0 100.6 21.9 2 0.0 99.4 22.7 2 0.0 100.8 19.6 2 0.0 100.7 19.3 2 0.0 99.3 21.7 2 0.0 95.5 21.8 2 0.0 96.1 25.5 2 0.0 101.0 20.3 2 0.0 95.5 27.1 2 0.0 98.9 22.4 2 0.0 95.5 26.9 2 0.0 97.4 24.4 2 0.0 97.4 24.6 2 0.0 100.1 21.0 2 0.0 101.9 18.4 2 0.0 100.7 20.1 2 0.0 101.0 20.7 2 1.0 97.6 26.4 2 1.0 97.5 24.4 2 1.0 95.6 26.3 2 0.0 103.7 16.3 1 0.0 103.5 16.4 1 1.0 95.5 29.1 2 1.0 98.2 25.1 1 1.0 95.9 29.2 2 1.0 95.5 31.0 2 1.0 95.8 29.4 2 1.0 95.6 29.0 2 1.0 97.5 28.0 1 com- pac- tion Level (%) 96.9 95.8 97.1 97.0 95.6 92.0 92.5 97.3 92.0 95.2 92.0 93.8 93.8 96.4 98.2 97.0 97.3 94.0 93.9 92.1 98.2 98.0 92.0 93.0 92.4 92.0 92.3 92.1 92.3 GEOTECHNICAL CONSULTANTS ' Plate 4 reed engineering PROPOSED FOUR SEASONS DISTRIBUTION CENTER SANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO. 6 (Continued) Test Date No. 10-10-91 92 93 10-12-91 94 95 96 97 10-12-91 98 99 100 101 102 103 104 105 10-14-91 106 10-15-91 107 108 109 10-16-91 110 111 112 113 114 115 10-17-91 116 117 118 119 120 121 10-18-91 122 123 124 125 Field Location 25'N, 25'E(4) 25'N,225'E(4) 25'N,425'E(4) 75'N,425'E(4) 125'N,425'E(4) 175'N,425'E(4) 125'N,125'E(4) 75'N, 25'E(4) 25'N, 25'E(4) 25'N,125'E(4) 25'N,225'E(4) 25'N, 325'E(4) 150'N, 55'W(4) 250'N, 55'W(4) 75'N,325'E(4) 200'N,425'E(4) 250'N,425'E(4) 300'N,425'E(4) 325'N,325'E(4) 75'N,325'E(4) 125'N,325'E(4) 175'N,325'E(4) 225'N,325'E(4) 275'N,325'E(4) 325'N,225'E 75'N,225'E 125'N,225'E 175'N,225'E 225'N,225'E 275'N,225'E 125'N, 25'E(4) 175'N, 25'E(4) 225'N, 25'E(4) 275'N, 25'E(4) Density Tests Depth Below Unit Final Dry Moisture S.G. Weight Content (feet) (Dcf) (%) 0.0 98.5 0.0 102.4 0.0 105.2 0.0 109.0 0.0 108.0 0.0 110.7 0.0 109.6 0.0 111.8 0.0 107.5 0.0 110.1 0.0 107.9 0.0 109.3 0.0 105.4 0.0 103.0 1.0 98.5 0.0 109.2 0.0 109.9 0.0 107.2 0.0 111.1 0.0 109.3 0.0 110.4 0.0 109.8 0.0 109.0 0.0 110.1 0.0 102.2 0.0 102.5 0.0 106.2 0.0 102.0 0.0 111.6 0.0 105.2 0.0 104.3 0.0 104.3 0.0 103.5 0.0 103.9 Curve No. Com- pac- tion Level (%) 13.9 4 89.0a 9.9 4 92.5b 22.3 4 95.0 18.6 4 98.5 20.2 4 97.6 15.9 4 100.0 18.1 4 99.0 16.1 3 95.6 20.7 4 97.1A 17.6 3 99.5 19.6 4 97.5B 17.9 4 98.7 18.9 1 99.8 21.7 1 97.5 18.6 2 94.9 16.6 4 98.6 16.3 4 99.3 19.2 4 96.8 16.1 3 95.0 16.0 4 98.7 16.2 4 99.7 15.6 4 99.2 16.9 4 98.5 16.6 4 99.5 15.8 5 95.1 16.9 5 95.3 16.1 5 98.8 18.4 5 94.9 15.0 3 95.5 18.3 4 95.0 17.3 5 97.0 16.9 5 97.0 16.7 5 96.3 17.3 5 96.7 GEOTECHNICAL CONSULTANTS Plate 5 reed engineering PROPOSED FOUR SEASONS DISTRIBUTION CENTER SANDY L~KE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO. 6 (Continued) Test Date No. 10-18-91 126 127 128 129 130 131 10-21-91 132 133 Footnotes: Field Density Tests Location Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (Dcf) (%) No. (%) 325'N, 25'E(4) 0.0 107.5 17.3 4 97.1 125'N,125'E(4) 0.0 103.7 17.0 5 96.5 175'N,125'E(4) 0.0 104.5 17.5 5 97.2 225'N,125'E(4) 0.0 102.6 17.3 5 95.4 275'N,125'E(4) 0.0 103.7 17.0 5 96.5 325'N,125'E(4) 0.0 104.9 17.2 5 97.6 10'N, 7'W of Column Line G-2 0.0 111.0 13.9 3 95.0 10'N, 10'W of Column Line E-2 3.0 98.6 19.9 2 95.0 (1) Measurements referenced from N.W. building corner (parking lot). (2) Measurements referenced from S.E. corner of building pad. / (3) Measurements referenced from S.E. corner parking lot on south side of building. (4) Measurements referenced from S.W. corner of building pad. (a) Failing Test - Compaction and Moisture. (b) Failing Test - Compaction and Moisture. (A) Retest - Passed. (B) Retest - Passed. GEOTECHNICAL CONSULTANTS ' P1 ate 6 reed engineering PROPOSED FOUR SEASONS DISTRIBUTION CENTER SANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAB REPORT NO. 6 Date 10-16-91 10-17-91 10-18-91 Belled Pier Report Pier Depth Depth Pier Shaft Bell To Bearing After Designa- Diameter Diameter Strata Belling tion (inches) (inches) (feet) (feet) K -7 24 60 18.7 18.7 K -6 24 60 15.2 15.4 K -5 24 60 17.2 17.2 K -4 24 60 19.1 19.2 K -3 24 60 18.2 18.4 K -2 24 60 14.4 15.1 J -2 24 60 15.4 16.1 H -2 24 60 13.9 15.0 G -2 24 60 12.5 13.3 F -2 24 60 17.6 18.2 E -2 24 60 16.4 16.8 D -2 24 60 15.0 15.2 C -2 24 60 17.0 17.5 B -2 24 60 17.4 17.9 J -3 24 60 12.6 12.7 H -3 24 60 13.6 14.5 G -3 24 60 12.8 13.7 F -3 24 60 17.7 18.4 J -7 24 60 17.6 17.8 J -6 24 60 17.3 17.6 J -5 24 60 16.6 17.1 J -4 24 60 13.8 15.0 H -7 24 60 17.6 1~'~ 6 H -6 24 60 15.0 15.4 H -5 24 60 17.6 18.3 H -4 24 60 15.9 17.6 G -7 24 60 17.1 17.1 G -6 24 60 17.4 17.4 G -5 24 60 17.0 17.3 G -4 24 60 14.5 15.4 F -7 24 60 17.7 18.6 F -6 24 60 17.0 17.6 GEOTECHNICAL CONSULTANTS P1 ate 7 reed engineering PROPOSED FOUR SEASONS DISTRIBUTION CENTER SANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO. 6 (Continued) Date 10-18-91 10-21-91 10-22-91 Belled Pier Report Pier Depth Depth Pier Shaft Bell To Bearing After Designa- Diameter Diameter Strata Belling tion (inches) (inches) (feet) (feet) F -5 24 60 17.1 17.3 F -4 24 60 17.6 18.0 E -7 24 60 18.0 19.0 E -6 24 60 17.9 18.0 E -5 24 60 17.1 17.1 E -4 24 60 17.8 17.8 D -7.6 24 48 17.3 17.6 D -7 24 66 16.0 16.5 D -6.6 24 48 17.6 17.6 D -6 24 66 17.4 17.7 D -5.6 24 48 17.8 17.9 D -5 24 72 17.5 17.7 D -4 24 60 17.5 17.5 D -3 24 60 17.1 17.1 B -7.6 24 60 17.6 17.6 B -7 24 72 18.0 18.1 B -6.6 24 60 17.8 17.8 B -6 24 72 18.1 18.1 B -5.6 24 60 17.6 17.6 B -5 24 72 17.7 17.9 B -4 24 60 17.9 19.0 B -3 24 60 17.5 17.5 C -3 24 60 18.0 18.0 C -4 24 60 17.1 17.1 C -5 24 72 17.5 17.7 C -5.6 24 60 17.4 17.4 C -6 24 72 17.5 17.5 C -6.6 24 60 17.6 17.6 C -7 24 72 17.7 17.7 C -7.6 24 60 17.8 18.0 E -3 24 60 17.1 17.1 F -8 24 66 16.5 16.5 E.5-8 24 66 16.5 16.5 E -8 24 66 16.5 16.5 GEOTECHNICAL CONSULTANTS · Plate 8 reed engineering PROPOSED FOUR SEASONS DISTRIBUTION CENTER SANDY LAKE ROAD AND ROYAL LANE COPPELL, TEXAS REPORT NO, 6 (Continued) Date 10-22-91 10-23-91 Belle4 Pier Report Depth Pier Shaft Bell To Bearing Designa- Diameter Diameter Strata tion (inches) (inches) (feet) Pier Depth After Belling (feet) D.5-8 24 66 17.6 17.6 -8 24 72 16.6 16.6 C.2-8 24 72 16.6 16.6 B.5-8 24 72 17.0 17.0 A.8-8 24 72 17.1 17.3 A.4-8 18 36 16.2 16.2 A.2-8 18 36 17.0 17.9 A.2-7.6 18 48 17.2 17.8 A.2-7.4 24 60 17.8 17.8 -6.8 24 72 16.5 16.5 -6.4 24 66 17.0 17.0 -5.8 24 72 16.4 16.5 -5.4 24 66 16.7 17.6 -5 24 72 16.7 17.5 -4.5 24 66 16.0 16.0 -4.1 24 72 16.8 16.9 -3.2 24 60 16.9 17.1 -7.4 24 66 17.5 17.5 B.5-1 24 60 11.9 12.0 C.2-1 24 60 14.0 14.0 -1 24 60 14.4 14.6 5-1 24 o -1 24 60 14.2 14.2 E.5-1 24 60 14.6 14.7 -1 24 60 14.5 14.8 F.5-1 24 60 14.6 16.0 -1 24 60 10.0 10.0 G.5-1 24 60 12.5 12.5 -1 24 60 10.0 10.2 H.5-1 24 60 13.0 13.9 -1 24 60 13.3 13.3 J.5-1 24 60 13.6 14.7 -1 24 60 16.7 16.7 GEOTECHNICAL CONSULTANTS · Plate 9 reed engineering PROPOBED FOUR BF~ONB DIBTRIBUTION CENTER SANDY L~KE ROAD /~ND ROY/~L L~NE COPPELL, TEXAS REPORT NO, 6 (Continued) Belled Pier Report Pier Depth Depth Pier Shaft Bell To Bearing After Designa- Diameter Diameter Strata Belling Date tion (inches) (inches) (feet) (feet) 10-23-91 K.5-1 24 60 16.9 16.9 L -2.2 24 60 16.4 16.4 L -3.2 24 60 16.0 16.0 10-24-91 L -1 18 54 16.0 16.0 L -1.3 18 42 15.6 15.6 L -1.7 18 54 16.0 16.0 L -2.6 18 54 16.0 16.0 L -3.6 18 54 16.7 16.7 L -4.1 24 66 15.2 15.2 L -4.5 18 54 16.0 16.7 L -5 24 66 16.0 16.1 L -5.5 18 54 16.0 16.6 L -5.9 24 66 15.7 15.7 L -6.5 18 54 16.0 16.2 L -6.8 24 60 16.0 16.0 L -7.4 18 54 16.0 16.0 L -7.6 18 48 16.0 16.0 L -8 24 60 16.4 16.4 K.5-8 24 66 17.2 17.2 K -8 24 66 16.2 16.2 H -8 24 66 16.5 19.5 G -8 24 66 16.2 16.2 10-25-91 A -3.6 18 54 16.5 17.0 GEOTECHNICAL CONSULTANTS P1 ate 10