Loading...
Coppell Trade 3-PT161103ps.-- �,, It -(v-16 -W �,_..._:.. i ri - 1 Y ro F CuFFEILA, t .V A ,5 h CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant 140pel 1 l QRI LP Date Submitted I /I . f(r Address of Applicant Phone Number 2.241. pv Fax Number f'7 L • Z41 -Mr Location of Construction (address, if available): Subdivision('0 1 _Wd'-4section # /� Block # Lot # 1 K 3 OR Survey/Abstract # Acreage Location description (attach vicinity wrap): 1. 2. Type of proposed construction or development: C: Residential C., Alteration of a natural waterway drainage course (7-, Non -Residential C: Other (describe & attach drmving or sketch) C• Placement of Fill (in right-of-way or on private property) Description of Construction Permit requested: Paving ❑ Median or Landscape ❑ Sidewalk ❑ Water Main ❑ Drive Approach ❑X R.C.P. ❑X Excavation ❑ Sanitary Sewer Main [X� Fire Lane ❑ Flume ❑ Bridge 0 Inlet ❑X Dox Culvert ❑X Rip Rap Fill Area ❑ Drainage Channel Excavation ❑ Slope Protection/Retaining Wall ❑ Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3.A11 construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4.Applicaut shall provide a copy of approved plans, specifications and the related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell ]Fee Ordinance. See Page 3 for calculation formula. Amount Due $ ,n Date Paid E - - NOTE. A separate excavation permit is required anytime pavement is cut or when there is work in the right-of-way not approved by the City Engineer. ➢Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department @ 972-304-3600 Street Department @ 972-462-5150 Fire Department @ 972-304-3512 Engineering Dept. @ 972-304-3679 );-Attach barricade plan / trench safety plan of a lane or street closure. (Required) �>It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As-Builts consist of 1 set full size paper copy, 1 set full size mylar and a CD with Autocad.dwg files. NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. >A pre -construction meeting is required prior to beginning work related to this permit. Contact the inspector assigned to your project to schedule the meeting. 'rating your name indicates your acceptance of the terms and conditions of this form: pi WtkJVA4W-% �l7�• Z4��b3� Signature of Applica t Contact Number i �iatu�reof or Contact Number FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? Yes P(No If YES, a Floodplain Development Permit is required before arty construction can begin. Is additional information required? (` Yes V'No Are other federal, state, or local permits required? (7 Yes 9�_No PERMIT APPLICATION APPROVED C' PERMIT APPLICATION DENIED ty Ap o al Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or conte against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. - i Page 3 NI A .. INSPECTION FEE CALCULATION SHEET Project Name Date As per the City of Coppell Subdivision Regulations, the Developer shall pay d% of the cost of the items to be permitted and inspected b) the Engineering Department and dedicated to the City. The Developer shall pay 2% of the items to be inspected by the Engineerinc Department, but not dedicated to the City such as pat -king lots, private utilities, private drainage systems and so forth. Inspection fees are due on or before the date of the Pre -construction Meeting. In order to verify the inspection fee due, please provide a copy of the development contract(s) and this spreadsheet with completed calculations to the Engineering Dept. The contract(s) should indicate the cost to construct the following improvements: Grand Total (total of �� 1 both colored fields) �0 PUBLIC IMPROVEMENTS CONTRACT AMOUNT 4°�O __ PRIVATE IMPROVEMENTS CONTRACT AMOUNT X2%= Paving � � Q• � 13 Ci � � � ! � � . 6�" Water Sanitary Sewer Q Storm Sewer 1 A 4, S�Q Alleys d Sidewalks Q Other Total 1 r91°N. i� •f. y `t +Y YY!F 'ti �GFTS' ;P n`,.,n_'=' G}.: ;' eF.�%4 Grand Total (total of �� 1 both colored fields) �0 MISC 1 Staking & Layout 2 Bonds/Permits/Mobilization TOTAL MISC 1 LS $ 9,000.00 $ 9,000.00 1 LS $ 32,500.00 $ 32,500.00 4 TOTAL BID $ 548,729.85 * Notes 1 DFW Services LLC, is licensed in Underground Fire. 2 DFW Services LLC., is on Oncor's WAS approved contractors list. 3 DFW Services LLC. is currently NOT DBE Certified. 4 Permits, Fees, Lab Fees, Inspection Fees, Tap Fees, Meter Fees, and Impact Fees are Excluded. 5 Performance, Payment, & Maintinence Bonds are included. 6 This is a lump sum bid, includes all items and trades, no separation will be accepted. 7 Staking for our portion of work is included. 8 Sanitary facilities for our term of work are included. Pg 1 of 2 DFW Services LLC. * 5848 Hwy 78 Ste. 118 * Sachse, Texas 75048 * 972-495-4400 * 800-510-3631 Fax TOTAL PAVING $ 157,351.85 DFW Services, LLC 1 CTC 1 EA $ 1,500.00 $ 1,500.00 2 Coppell Texas 600 LF $ 3.00 $ 1,800.00 3 No Lime Or Select Fill Under Paving 3 EA $ 99.00 $ 297.00 Bid Date: 1/29/2016 REVISED 5/25/2016,10/25/2016 Bid To: MacAtee Engineering 9" Erosion Control Logs Item $ 5.00 Unit 5 Curb Inlet Protection # Description Quantity Unit 150.00 Price 6 Total 45 LF STORM 25.00 $ 1,125.00 7 Erosion Control Matting 1 10' X 5' Double Box Culvert (Precast) 66 LF $ 1,680.00 $ 110,880.00 2 27" RCP 67 LF $ 65.00 $ 4,355.00 3 21" RCP 5 LF $ 195.00 $ 975.00 4 Type A Headwall on 2BBL 10'X5' Box Culvert 2 EA $ 29,300.00 $ 58,600.00 5 Sloped Headwall on 27" RCP 2 EA $ 2,100.00 $ 4,200.00 6 4"-8" RipRap 12" Thick 5162 SF $ 8.00 $ 41,296.00 7 Convert 10' Inlet to 2 Grate Inlet 1 EA $ 7,150.00 $ 7,150.00 TOTAL STORM $ 227,456.00 EXCAVATION 1 Excavation & Grading 1 LS $ 105,000.00 $ 105,000.00 TOTAL EXCAVATION $ 105,000.00 PAVING 1 7" Concrete Drive 18159 SF $ 6.15 $ 111,677.85 2 12" Curb 947 LF $ 34.00 $ 32,198.00 3 Flume 373 SF $ 12.00 $ 4,476.00 4 Demo Concrete 1500 SF $ 6.00 $ 9,000.00 MISC 1 Staking & Layout 2 Bonds/Permits/Mobilization TOTAL MISC 1 LS $ 9,000.00 $ 9,000.00 1 LS $ 32,500.00 $ 32,500.00 4 TOTAL BID $ 548,729.85 * Notes 1 DFW Services LLC, is licensed in Underground Fire. 2 DFW Services LLC., is on Oncor's WAS approved contractors list. 3 DFW Services LLC. is currently NOT DBE Certified. 4 Permits, Fees, Lab Fees, Inspection Fees, Tap Fees, Meter Fees, and Impact Fees are Excluded. 5 Performance, Payment, & Maintinence Bonds are included. 6 This is a lump sum bid, includes all items and trades, no separation will be accepted. 7 Staking for our portion of work is included. 8 Sanitary facilities for our term of work are included. Pg 1 of 2 DFW Services LLC. * 5848 Hwy 78 Ste. 118 * Sachse, Texas 75048 * 972-495-4400 * 800-510-3631 Fax TOTAL PAVING $ 157,351.85 EROSION 1 Construction Entrance 1 EA $ 1,500.00 $ 1,500.00 2 Silt Fence 600 LF $ 3.00 $ 1,800.00 3 Stone Overflow 3 EA $ 99.00 $ 297.00 4 9" Erosion Control Logs 30 LF $ 5.00 $ 150.00 5 Curb Inlet Protection 2 EA $ 150.00 $ 300.00 6 Rock Berm 45 LF $ 25.00 $ 1,125.00 7 Erosion Control Matting 4750 SY $ 1.00 $ 4,750.00 8 SWPPP 1 EA $ 2,500.00 $ 2,500.00 7 SWPPP Inspections <2Y 1 LS $ 5,000.00 $ 5,000.00 TOTAL EROSION $ 17,422.00 MISC 1 Staking & Layout 2 Bonds/Permits/Mobilization TOTAL MISC 1 LS $ 9,000.00 $ 9,000.00 1 LS $ 32,500.00 $ 32,500.00 4 TOTAL BID $ 548,729.85 * Notes 1 DFW Services LLC, is licensed in Underground Fire. 2 DFW Services LLC., is on Oncor's WAS approved contractors list. 3 DFW Services LLC. is currently NOT DBE Certified. 4 Permits, Fees, Lab Fees, Inspection Fees, Tap Fees, Meter Fees, and Impact Fees are Excluded. 5 Performance, Payment, & Maintinence Bonds are included. 6 This is a lump sum bid, includes all items and trades, no separation will be accepted. 7 Staking for our portion of work is included. 8 Sanitary facilities for our term of work are included. Pg 1 of 2 DFW Services LLC. * 5848 Hwy 78 Ste. 118 * Sachse, Texas 75048 * 972-495-4400 * 800-510-3631 Fax Pg2of2 DFW Services, LLC 9 Excludes any utility relocations not shown on plans, 10 Excludes rock excavation, if rock is encountered it will be removed at hourly rates. 11 Excludes any topsoil, seeding,vegitation,sod watering or tree replacement. 12 Excludes irrigation repair. 13 Excludes any buried debris removal. 14 DFW Services LLC. shall not be liable for any liquidated, actual, indirect, or consequential damages arising from any cause. 15 DFW Services LLC. is not liable for unforseen, concealed conditions, or incorrect information that may be provided. 16 DFW Services LLC. will not be responsible for and will be indemnified from claims resulting from the pre-existence of any hazardous materials. 17 DFW has no liability for design. 18 DFW will not be responsible for and will be granted additional time and compensation for circumstances which it is not responsible or which are not in its control. 19 Upon completion and acceptance of DFW Services LLC's work by the owner, final payment should be made upon reciept of our invoice, with interest at (18%) eighteen percent per annum charged on any amount remaining unpaid (30) thirty days thereafter, together with reasonable attorneys fees and costs of collection, if incurred. 20 One Mobilization and applicable taxes are included. Mobilizations in excess of quoted amounts will result in additional charges. 21 SWPPP plan, implementation, or installation is included. 22 Contractor or Owner to provide adequate and safe access to work areas. 23 Bid is based upon a 50 hour work week excluding nights, holidays, & weekends, Any work required at these times will be billed at a higher rate. 24 Project is bid with (1) one crew. Additional workforces requested or accelerated schedules will result in additional charges. 25 Final connections to water, sewer, or roof drain are excluded unless specifically noted. 26 If staking is included CAD drawings must be made available for our surveyor. DFW will not do layout without CAD file. 27 Any item not specifically listed on this proposal is excluded. 28 This proposal must become part of any contract issued for this project. 29 All items bid per plans dated 1/11/16 by MacAtee Engineering, Pages 1-6. No specs were issued. REVISED PLANS DATED 10/15/2016, 30 Box culvert is bid as precast boxes. 31 Excavation is bid for concrete on grade for site, no lime or select fill is included. 32 All project info is required to start the project. Job name, bonding, owner info etc. 33 Excavation pricing based on Import of all common fill If we can get import from adjacent site Please deduct 10,000 from excavation number. 34 Barricading of adjacent parking lot is included. 35 Tree removal & disposal included, but not shown on plans. 36 No sinage or pavement markings are included with this bid. 37 Trees are to be chipped onsite and spread on site. No haul off of chips. 38 Steel & Concrete went up on this project in addition to excavation materials. The pit closed where we had originally quoted the dirt to come from. 39 Note Credit for fill on adjacent site went down also. DFW Services LLC. * 5848 Hwy 78 Ste. 118 * Sachse, Texas 75048 * 972-495-4400 * 800-510-3631 Fax